Upload Button Icon Add office photos

Filter interviews by

Eaton India Innovation Center Senior Engineer Interview Questions and Answers

Updated 15 May 2024

Eaton India Innovation Center Senior Engineer Interview Experiences

4 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Explain Gate drive selection for MOSFETs?
  • Ans. 

    Gate drive selection for MOSFETs involves choosing the appropriate voltage and current levels to ensure proper switching and efficiency.

    • Consider the gate threshold voltage and gate capacitance of the MOSFET when selecting the drive voltage.

    • Choose a gate driver IC with sufficient current capability to quickly charge and discharge the gate capacitance.

    • Opt for a gate driver with features like under-voltage lockout and ove...

  • Answered by AI
Round 3 - Case Study 

Design a Flyback converter assuming some details

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What motivates you

Senior Engineer Interview Questions Asked at Other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
asked in Nagarro
Q2. Write a program: two input, one is N(any integer, lets say 3), se ... read more
asked in Tata Elxsi
Q3. What is Quality Assurance. Difference between Quality assurance a ... read more
asked in Qburst
Q4. Is it possible to work with multiple threads in core data? If so, ... read more
Q5. When you will perform Half or Full engine overhauling.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jun 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What do you do?
  • Q2. Basic Design Questions
Round 3 - Technical 

(2 Questions)

  • Q1. Detailed design requirements for my previous designs
  • Q2. Where do I see myself in 5 years time?
Round 4 - Aptitude Test 

Meeting with senior leader. Holistic aerospace questions.

Round 5 - HR 

(1 Question)

  • Q1. Salary negotiation, strength and weakness

Senior Engineer Interview Questions & Answers

user image Jandhyala Sai Charan

posted on 12 Oct 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical questions around the earlier projects
  • Q2. Basics of the subject

Eaton India Innovation Center interview questions for designations

 Engineer

 (4)

 Associate Engineer

 (2)

 Design Engineer

 (6)

 Lead Engineer

 (1)

 Electrical Engineer

 (1)

 Software Engineer

 (1)

 Senior Data Scientist

 (1)

 Embedded Firmware Engineer

 (1)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Experience about finishing work of building project.
  • Ans. 

    I have extensive experience in overseeing the finishing work of building projects, ensuring high quality and timely completion.

    • Managed finishing work such as painting, flooring, and fixtures to meet project deadlines

    • Coordinated with subcontractors and vendors to ensure materials and labor were on schedule

    • Implemented quality control measures to maintain high standards of workmanship

    • Resolved any issues or discrepancies d...

  • Answered by AI
  • Q2. What is DPR? What is DLP period?
  • Ans. 

    DPR stands for Daily Progress Report. DLP period refers to Data Loss Prevention period.

    • DPR is a report that documents the daily progress of a project, including tasks completed, challenges faced, and plans for the next day.

    • DLP period is the time frame during which Data Loss Prevention measures are in effect to protect sensitive information from unauthorized access or disclosure.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why I want to do job change?
  • Ans. 

    Seeking new challenges, growth opportunities, and a better work-life balance.

    • Looking for new challenges and opportunities to grow professionally.

    • Seeking a better work-life balance.

    • Interested in working with new technologies or industries.

    • Want to expand my skill set and knowledge.

    • Seeking a more supportive or collaborative work environment.

  • Answered by AI
  • Q2. What is your expectations of CTC?
  • Ans. 

    I expect a competitive salary based on my experience, skills, and the market standards.

    • Expectation of a salary package that reflects my qualifications and experience

    • Consideration of market standards and industry norms

    • Open to negotiation based on additional benefits or perks offered

    • Looking for a fair and transparent compensation structure

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Execution of Elevated Viaduct (ROB) 6.2KM 1200 numbers pile (Friction & end Bearing Pile) Foundation ROB Pile Cap and Pier, PSC T-Type Pier Cap, Post Tensioning Girder,Bow string (ROB) structure box interc...
  • Ans. 

    The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.

    • Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.

    • Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...

  • Answered by AI
  • Q2. Preparation of the planning of site execution day by day as per available drawing. Planning & indenting daily requirement of Labour, Construction Machinery, and Materials &Formwork. Organizing various dail...

Interview Preparation Tips

Interview preparation tips for other job seekers - I certify also that all relative document pertaining my qualifications areon my file and is readily accessible in the case needed further.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Explain about current work?
  • Q2. Question from the written test ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared what you written in CV
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I was interviewed in Apr 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Control Valve sizing
  • Q2. Flowmeter selection
Round 2 - HR 

(2 Questions)

  • Q1. Reason for shifting
  • Ans. 

    I shifted to pursue new opportunities for growth and development in my career.

    • Seeking new challenges and responsibilities

    • Exploring different industries or technologies

    • Relocation for personal reasons or family commitments

  • Answered by AI
  • Q2. Expected salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is minimum gap between two structures for seismic point of view
  • Ans. 

    Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.

    • Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.

    • This gap helps prevent collision or structural damage during an earthquake.

    • Building codes and regulations may specify minimum gaps for seismic safety.

    • Example: If one building is 100 feet tall, the m...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Read all codes well
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. They are Asked General question about Yourself and Company and why you want to switch.
  • Q2. Schedule Interview for Technical round
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me About Yourself
  • Q2. Your Current job role and how to plan to work ,how much productivity of labour , Some IS code . Slab Cycle
  • Q3. Why you change your current job
Round 3 - HR 

(4 Questions)

  • Q1. Documents submission
  • Q2. Salary negotiation
  • Q3. Offer package and gove Joining Letter.
  • Q4. Medical examine applicable after result if you fit then you resigned from your current company and join as per discussion time .

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to be confident and give answer gently and if you don't know about questions give skip for another. And prepare current responsibility.

Eaton India Innovation Center Interview FAQs

How many rounds are there in Eaton India Innovation Center Senior Engineer interview?
Eaton India Innovation Center interview process usually has 2-3 rounds. The most common rounds in the Eaton India Innovation Center interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in Eaton India Innovation Center Senior Engineer interview?

Some of the top questions asked at the Eaton India Innovation Center Senior Engineer interview -

  1. Explain Gate drive selection for MOSFE...read more
  2. Technical questions around the earlier proje...read more
  3. Basic Design Questi...read more

Tell us how to improve this page.

People are getting interviews through

based on 3 Eaton India Innovation Center interviews
WalkIn
33%
67% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates
Eaton India Innovation Center Senior Engineer Salary
based on 259 salaries
₹15 L/yr - ₹28 L/yr
135% more than the average Senior Engineer Salary in India
View more details

Eaton India Innovation Center Senior Engineer Reviews and Ratings

based on 54 reviews

3.9/5

Rating in categories

3.7

Skill development

3.7

Work-Life balance

4.3

Salary & Benefits

4.5

Job Security

3.9

Company culture

3.7

Promotions/Appraisal

3.6

Work Satisfaction

Explore 54 Reviews and Ratings
Senior Engineer
259 salaries
unlock blur

₹15 L/yr - ₹28 L/yr

Engineer
195 salaries
unlock blur

₹9.4 L/yr - ₹18 L/yr

Lead Engineer
109 salaries
unlock blur

₹16.9 L/yr - ₹44 L/yr

Associate Engineer
76 salaries
unlock blur

₹6 L/yr - ₹10 L/yr

Engineering Manager
68 salaries
unlock blur

₹21.5 L/yr - ₹39 L/yr

Explore more salaries
Compare Eaton India Innovation Center with

GE

4.2
Compare

Siemens

4.1
Compare

Honeywell Technology Solutions

3.8
Compare

Schneider Electric

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview