i
Auro Realty Private Limited
Filter interviews by
I applied via Approached by Company and was interviewed in Sep 2021. There were 3 interview rounds.
I expect a competitive salary based on my experience, skills, and the responsibilities of the Senior Engineer role.
Consider the industry standards and salary ranges for Senior Engineers in your location
Research the company's salary structure and compensation packages
Highlight your qualifications, achievements, and the value you can bring to the role
Be open to negotiation and discuss additional benefits or perks
Top trending discussions
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
I applied via LinkedIn and was interviewed in May 2024. There were 2 interview rounds.
A project engineer manages a site by overseeing construction activities, coordinating with stakeholders, ensuring compliance with regulations, and resolving issues.
Coordinate with project managers, contractors, and subcontractors to ensure smooth workflow.
Monitor progress and quality of construction activities to meet project deadlines.
Ensure compliance with safety regulations and quality standards.
Resolve any issues o...
The number of slabs to give in one month depends on the project timeline, size of slabs, and resources available.
Consider the project timeline and deadlines for completion
Evaluate the size and complexity of the slabs to determine production rate
Assess the availability of resources such as manpower and equipment
Example: If the project requires 100 slabs and the production rate is 10 slabs per week, then it would take 10...
Mivan shuttering is a type of formwork that is used in construction for constructing walls and slabs.
Mivan shuttering is a fast-paced construction technique.
It involves setting up aluminum formwork to create the structure of walls and slabs.
The formwork is reusable and can be quickly assembled and dismantled.
Mivan shuttering results in smooth finishes on concrete surfaces.
It is commonly used in high-rise buildings and
Different types of cement grades include OPC, PPC, PSC, etc. M70 grade typically uses OPC cement.
Types of cement grades: OPC, PPC, PSC, etc.
M70 grade usually uses OPC cement.
OPC (Ordinary Portland Cement) is commonly used in high-strength concrete mixes like M70.
I am currently earning a competitive salary based on my experience and qualifications.
My current salary is in line with industry standards.
I am open to discussing salary expectations for this role.
I believe my compensation reflects my skills and contributions to my current employer.
The deduction in PF varies based on the employee's salary and the company's policy.
PF deduction is typically a percentage of the employee's basic salary
The current rate of PF deduction is 12% of the basic salary
Some companies may choose to match the employee's contribution to PF
Employees can also choose to contribute more than the mandatory 12%
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.
Project is the overall task or objective to be completed within a specific timeframe.
Project engineering focuses on the technical aspects such as planning, designing, and executing the project.
Project management involves coordinating resources and tas...
Types of services in interior fitout include design, construction, project management, and installation.
Design services involve creating layouts, selecting materials, and creating 3D visualizations.
Construction services include building partitions, ceilings, and flooring.
Project management services involve coordinating schedules, budgets, and contractors.
Installation services include fitting furniture, fixtures, and eq...
Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.
Delays in material delivery can impact project timelines and budgets
Inclement weather can halt work progress and cause safety concerns
Coordination issues between different teams can lead to misunderstandings and errors
Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.
Agreement is a mutual understanding between two or more parties.
A bond is a legal document that guarantees the fulfillment of obligations.
Agreements are usually informal and may not always be legally binding.
Bonds are formal and legally enforceable documents.
Examples of agreements include contra...
I was interviewed in May 2022.
I applied via Referral and was interviewed in Nov 2020. There was 1 interview round.
Tiling work involves preparing the surface, measuring and cutting tiles, applying adhesive, laying tiles, and grouting.
Clean and prepare the surface to be tiled
Measure and cut tiles to fit the area
Apply adhesive to the surface and lay tiles in a pattern
Allow adhesive to dry and then apply grout to fill gaps between tiles
Clean excess grout and allow it to dry completely
Stone work involves the process of cutting, shaping, and placing stones to create structures or decorative features.
Selecting the appropriate type of stone for the project
Cutting and shaping the stones using tools such as chisels and hammers
Laying out the stones in a pattern or design
Applying mortar or other bonding agents to secure the stones in place
Finishing the surface of the stones to achieve the desired texture o
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
based on 9 reviews
Rating in categories
Assistant Manager
73
salaries
| ₹5.5 L/yr - ₹14 L/yr |
Deputy Manager
47
salaries
| ₹7 L/yr - ₹17.4 L/yr |
Engineer
43
salaries
| ₹3.9 L/yr - ₹8.8 L/yr |
Senior Engineer
40
salaries
| ₹5.3 L/yr - ₹9.3 L/yr |
Manager
20
salaries
| ₹7.5 L/yr - ₹18.1 L/yr |
DLF
Prestige Group
Godrej Properties
Sobha