i
Auro Realty Private Limited
Filter interviews by
I applied via LinkedIn and was interviewed before Jul 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
The stages of obtaining Environmental and CRZ Clearance for a port and Industrial Park involve multiple steps and approvals.
Conducting Environmental Impact Assessment (EIA) study
Submitting the EIA report to the concerned authorities for review
Public consultation and feedback
Obtaining Environmental Clearance (EC) from the Ministry of Environment, Forest and Climate Change
Applying for Coastal Regulation Zone (CRZ) cleara...
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC: $60,000
Expected CTC: $70,000
I applied via Referral and was interviewed before Sep 2021. There were 2 interview rounds.
Top trending discussions
posted on 27 Dec 2024
I applied via Job Portal and was interviewed in Nov 2024. There was 1 interview round.
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
I have 5 years of experience in my previous company, where I started as a sales associate and worked my way up to a team leader role.
Started as a sales associate and quickly learned the ropes of the business
Consistently exceeded sales targets and was promoted to team leader within 2 years
Managed a team of 10 sales associates and implemented new training programs to improve performance
Collaborated with other departments...
I am a dedicated and experienced professional with a strong background in leadership and team management.
Over 5 years of experience in retail management
Proven track record of increasing sales and improving customer satisfaction
Strong communication and problem-solving skills
Led a team of 15 employees to exceed quarterly sales targets by 20%
posted on 6 Sep 2023
I applied via Approached by Company and was interviewed in Aug 2023. There were 4 interview rounds.
Working on case study home loan
Verbal explanation on case study
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 3 interview rounds.
Delays in construction projects can be caused by various factors.
Weather conditions, such as heavy rain or extreme temperatures, can slow down construction progress.
Unforeseen site conditions, such as encountering unexpected underground utilities or poor soil quality, may require additional time for resolution.
Supply chain issues, including delays in material delivery or shortages, can impact project timelines.
Changes ...
I track progress of projects by setting clear goals, using project management tools, and regularly communicating with team members.
Set clear goals and objectives for the project
Break down the project into smaller tasks and milestones
Use project management tools such as Gantt charts or Kanban boards to track progress
Regularly communicate with team members to get updates on their tasks
Hold regular meetings or check-ins t...
As an Assistant Manager, I perform a variety of tasks on a daily basis to ensure smooth operations and support the manager.
Overseeing daily operations and ensuring compliance with company policies
Managing and supervising staff, including scheduling and training
Assisting with customer service and resolving any issues or complaints
Monitoring inventory levels and placing orders as needed
Analyzing sales data and implementi...
I manage stakeholders by identifying their needs, communicating effectively, and building strong relationships.
Identify key stakeholders and their needs
Communicate regularly and effectively with stakeholders
Build strong relationships through trust and transparency
Address concerns and conflicts in a timely and respectful manner
Collaborate with stakeholders to achieve common goals
Provide regular updates and progress repo...
I have worked on various projects including team management, process improvement, and customer satisfaction.
Led a team of 10 employees to successfully implement a new inventory management system, resulting in a 20% reduction in stockouts.
Developed and executed a customer feedback program, resulting in a 15% increase in overall customer satisfaction.
Implemented a process improvement initiative that reduced production ti...
I am a highly motivated and experienced professional with a strong background in management and leadership.
I have over 5 years of experience in supervisory roles, where I successfully led teams and achieved targets.
I am skilled in strategic planning, problem-solving, and decision-making.
I have a proven track record of improving operational efficiency and customer satisfaction.
I am adept at building and maintaining stro...
I am currently responsible for managing a team and overseeing daily operations.
Managing a team of employees
Overseeing daily operations and ensuring smooth workflow
Setting goals and targets for the team
Monitoring performance and providing feedback
Handling customer complaints and resolving issues
Creating work schedules and assigning tasks
Training new employees and conducting performance evaluations
I am currently earning $50,000 per year and my salary expectations for the Assistant Manager position are in the range of $60,000 to $70,000 per year.
My current salary is $50,000 per year.
I am looking for a salary in the range of $60,000 to $70,000 per year for the Assistant Manager position.
I believe my skills and experience justify this salary expectation.
My notice period is 30 days.
I have a notice period of 30 days.
I am required to give a 30-day notice before leaving my current position.
I am contractually obligated to provide a 30-day notice period.
posted on 27 Oct 2022
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
I have a diverse background with experience in management, customer service, and team leadership.
Started my career as a customer service representative at XYZ Company
Promoted to team leader after consistently exceeding performance targets
Managed a team of 10 employees, providing guidance and support
Implemented new customer service strategies that resulted in a 20% increase in customer satisfaction
Transferred to ABC Com...
I am interested in the Assistant Manager role because it aligns with my skills and experience. I have researched the company and am impressed by its reputation and growth potential.
I have experience in managing teams and coordinating operations, which are key responsibilities of an Assistant Manager.
I am attracted to the company's strong reputation for customer service and its commitment to employee development.
During ...
I applied via Campus Placement
They will conduct English talent test
Two-stroke engines have a power stroke every revolution, while four-stroke engines have a power stroke every other revolution.
Two-stroke engines have a simpler design and are lighter than four-stroke engines.
Two-stroke engines have a higher power-to-weight ratio than four-stroke engines.
Four-stroke engines are more fuel-efficient and have a longer lifespan than two-stroke engines.
Two-stroke engines are commonly used in...
Batching plant pain mixture servicing refers to the maintenance and repair of the equipment used to mix concrete.
Regular cleaning and inspection of the batching plant equipment
Replacing worn out parts and repairing any damages
Ensuring proper calibration of the equipment for accurate mixing
Regular lubrication of moving parts to prevent wear and tear
Training staff on proper use and maintenance of the equipment
Bp1800 concrete pump has a hydraulic function for efficient pumping of concrete.
The hydraulic system of Bp1800 concrete pump helps in generating the required pressure to pump concrete.
It consists of hydraulic cylinders, pumps, and motors that work together to move the concrete through the pipeline.
The hydraulic function also helps in controlling the speed and direction of the pump.
The hydraulic oil used in the system h...
A tower crane support mechanic is responsible for maintaining and repairing the tower crane's support system.
Inspecting and maintaining the tower crane's support system
Repairing or replacing damaged or worn-out parts
Ensuring the tower crane is stable and secure
Working with other members of the construction team to ensure safety and efficiency
Using specialized tools and equipment to perform maintenance and repairs
Keepin
based on 17 reviews
Rating in categories
Assistant Manager
73
salaries
| ₹5.5 L/yr - ₹14 L/yr |
Deputy Manager
47
salaries
| ₹7 L/yr - ₹17.4 L/yr |
Engineer
43
salaries
| ₹3.9 L/yr - ₹8.8 L/yr |
Senior Engineer
40
salaries
| ₹5.3 L/yr - ₹9.3 L/yr |
Manager
20
salaries
| ₹7.5 L/yr - ₹18.1 L/yr |
DLF
Prestige Group
Godrej Properties
Sobha