Senior Project Engineer Quality Interview Questions & Answers

user image Anonymous

posted on 4 Oct 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What are testing in tile?
  • Ans. 

    Testing in tile involves evaluating the quality and durability of tiles used in construction projects.

    • Testing for strength and durability

    • Testing for water absorption

    • Testing for slip resistance

    • Testing for color fastness

    • Testing for chemical resistance

  • Answered by AI
  • Q2. Difference between gypsum plaster & POP?
  • Ans. 

    Gypsum plaster is made from gypsum powder and water, while POP (Plaster of Paris) is made from gypsum and heat.

    • Gypsum plaster is a white cementing material made by partial or complete dehydration of the mineral gypsum.

    • POP is a white powder made by calcining gypsum, then grinding it into a fine powder.

    • Gypsum plaster is used for interior walls and ceilings, while POP is commonly used for creating molds, sculptures, and d...

  • Answered by AI
  • Q3. What is corbon percentage in Steel?
  • Ans. 

    Carbon percentage in steel typically ranges from 0.2% to 2.1%.

    • Carbon content affects the strength and hardness of steel.

    • Low carbon steel (0.2% or less) is more ductile and easily welded.

    • High carbon steel (0.6% to 2.1%) is harder and more brittle, used for cutting tools.

    • Medium carbon steel (0.3% to 0.6%) balances strength and ductility.

  • Answered by AI
  • Q4. How much types of formwork is going on at current site?
  • Ans. 

    There are three types of formwork going on at the current site.

    • Timber formwork

    • Steel formwork

    • Aluminum formwork

  • Answered by AI
  • Q5. What is your current role at site?
  • Ans. 

    I am currently responsible for overseeing quality control and assurance activities at the construction site.

    • Leading quality control inspections and audits

    • Ensuring compliance with project specifications and standards

    • Implementing quality improvement initiatives

    • Collaborating with project managers and subcontractors to address quality issues

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Make prepare properly before going any interview & don't loose your confidence if seems the condition would be complex.Al Always remember a failure comes with a second option to do the things in new way.
God bless all of you.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(1 Question)

  • Q1. What specific marketing topics were you questioned about? Atl Btl Event management Vendor Coordination Billings
Round 2 - One-on-one 

(1 Question)

  • Q1. Asked about provide information about yourself and your maximum previous work experience?

Senior Marketing Executive Interview Questions asked at other Companies

Q1. Who would you target your Marketing Communication for a Gamming Console, Parent or the Kid?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Costing of projects
  • Ans. 

    Costing of projects involves estimating the expenses and resources required for completion.

    • Costing of projects includes estimating labor, materials, equipment, and overhead costs.

    • It is important to consider any potential risks or unforeseen expenses that may arise during the project.

    • Costing also involves determining profit margins and pricing strategies to ensure profitability.

    • Examples of costing methods include bottom...

  • Answered by AI
  • Q2. Analysis for cost of activities
  • Ans. 

    Analysis of cost of activities involves evaluating expenses related to various tasks or projects.

    • Identify all activities involved in the project

    • Determine the cost associated with each activity

    • Analyze the cost breakdown to identify areas of potential savings or inefficiencies

    • Consider factors such as labor, materials, equipment, and overhead costs

    • Use tools like cost estimation software or spreadsheets for accurate analys

  • Answered by AI
  • Q3. Why do you want to join ATS
Round 2 - Technical 

(3 Questions)

  • Q1. What is contract management
  • Ans. 

    Contract management involves the administration and oversight of contracts throughout their lifecycle.

    • Ensuring compliance with contract terms and conditions

    • Monitoring contract performance and milestones

    • Managing changes and amendments to contracts

    • Resolving disputes and conflicts that may arise

    • Maintaining accurate records and documentation

    • Examples: tracking deadlines, negotiating terms, analyzing risks

  • Answered by AI
  • Q2. Types of contracts handled
  • Ans. 

    AGM Contracts handles a variety of contracts including construction, procurement, and service agreements.

    • Construction contracts

    • Procurement contracts

    • Service agreements

  • Answered by AI
  • Q3. What are various clauses in SCC & GCC
  • Ans. 

    SCC and GCC clauses are essential in contracts to outline rights and responsibilities of parties involved.

    • SCC (Special Conditions of Contract) are specific to the project and can include details on scope, schedule, and payment terms.

    • GCC (General Conditions of Contract) are standard clauses that apply to all contracts and cover topics like dispute resolution, termination, and indemnity.

    • Both SCC and GCC help ensure clari...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary expectation & negotiation

Assistant General Manager Contract Interview Questions asked at other Companies

Q1. How the basic Rate concept works? Which are the items to be considered for Basic Rate?
View answer (1)

Manager Billing projects Interview Questions & Answers

user image Anonymous

posted on 30 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Related Mivan shuttering e
  • Q2. Related steel binding

Interview Preparation Tips

Interview preparation tips for other job seekers - ATS Home Kraft is a good company but higher management behaviour not good

ATS Homekraft interview questions for popular designations

 Time Keeper

 (3)

 Assistant General Manager Contract

 (1)

 Assistant Manager

 (1)

 Assistant Project Manager

 (1)

 Billing Engineer

 (1)

 Civil Foreman

 (1)

 Electrical Project Engineer

 (1)

 Planning Engineer

 (1)

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is Total Float?
  • Ans. 

    Total Float is the amount of time a schedule activity can be delayed without delaying the project completion date.

    • Total Float is calculated by subtracting the Early Start date of an activity from its Late Start date.

    • It indicates the flexibility in scheduling a particular activity.

    • Activities with zero Total Float are considered critical path activities.

    • Total Float helps project managers in managing project schedules eff

  • Answered by AI
  • Q2. Rate Analysis of Shuttering?
  • Ans. 

    Rate analysis of shuttering involves calculating the cost of materials, labor, and equipment for formwork used in construction projects.

    • Rate analysis of shuttering includes determining the quantity of materials needed for formwork, such as plywood, steel props, and scaffolding.

    • Labor costs for assembling and dismantling the formwork are also considered in the rate analysis.

    • Equipment costs, such as rental of concrete mix...

  • Answered by AI

Assistant Project Manager Interview Questions asked at other Companies

Q1. What are the different phases in new product development?
View answer (1)

Get interview-ready with Top ATS Homekraft Interview Questions

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is total flot
  • Ans. 

    Total float is the amount of time a schedule activity can be delayed without delaying the project completion date.

    • Total float is calculated by subtracting the early start date of an activity from its late start date.

    • Activities with total float can be delayed without affecting the project's critical path.

    • Total float is also known as slack.

    • Total float is important for project scheduling and helps in managing project time

  • Answered by AI
  • Q2. Total flot which we can delay the project without delay finish date
  • Ans. 

    Total float is the amount of time that a schedule activity can be delayed without delaying the project finish date.

    • Total float is calculated by subtracting the early start date of an activity from its late start date.

    • Activities with total float can be delayed without affecting the project finish date.

    • Total float helps in identifying activities that have flexibility in their start and finish dates.

    • It is important to mon...

  • Answered by AI

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

Jobs at ATS Homekraft

View all
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is zero export device in solar installation?
  • Ans. 

    A zero export device in a solar installation is a device that prevents excess solar energy from being exported back to the grid.

    • A zero export device is typically used in situations where the grid cannot handle the additional power generated by the solar installation.

    • It ensures that the solar energy is consumed locally or stored in batteries instead of being exported.

    • Zero export devices can be programmed to limit the ex...

  • Answered by AI

Electrical Project Engineer Interview Questions asked at other Companies

Q1. What is important factors in cable calculation? Types of communication used in Automation industry & its length limitations, What is difference between Analog input 4-20mA & analog input (0-10v). Dg synch control panel & it's wo... read more
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Normal introduction round
Round 2 - Technical 

(1 Question)

  • Q1. What is QA and QC 5 why process Fish bowl Six sigma Design mix
  • Ans. 

    QA (Quality Assurance) focuses on preventing defects in the process, while QC (Quality Control) focuses on identifying defects in the final product.

    • QA is process-oriented, ensuring that the processes used to create the product are effective and efficient.

    • QC is product-oriented, focusing on identifying defects in the final product through inspections and testing.

    • 5 Why process is a problem-solving technique that involves...

  • Answered by AI
Round 3 - Behavioral 

(1 Question)

  • Q1. About your past experience and check your ability

Project Quality Lead Engineer Interview Questions asked at other Companies

Q1. What is QA and QC 5 why process Fish bowl Six sigma Design mix
View answer (1)

Time Keeper Interview Questions & Answers

user image Anonymous

posted on 26 Aug 2022

I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction.Pf . wages sheet.. Minimum wages.etc.
Round 3 - HR 

(1 Question)

  • Q1. Tell you about your experience.minium wages..PF and Register details.etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself..Not tells lie and keep knowledge of. Your area

Time Keeper Interview Questions asked at other Companies

Q1. JOB RESPONSIBILITIES & EXPERIENCE: COORDINATE WITH ALL OF SITE TIME KEEPERS. MONITORING LABOUR HOURS BY THE SOFTWARE OF HIGHERACCOUNTING INVENTORY SYSTEM.
View answer (1)

Time Keeper Interview Questions & Answers

user image Anonymous

posted on 11 Apr 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. BOCW act and PF related.. Minimum wages.

Interview Preparation Tips

Interview preparation tips for other job seekers - First prepare yourself.less your work weakness.Think on right way.

Time Keeper Interview Questions asked at other Companies

Q1. JOB RESPONSIBILITIES & EXPERIENCE: COORDINATE WITH ALL OF SITE TIME KEEPERS. MONITORING LABOUR HOURS BY THE SOFTWARE OF HIGHERACCOUNTING INVENTORY SYSTEM.
View answer (1)

ATS Homekraft Interview FAQs

How many rounds are there in ATS Homekraft interview?
ATS Homekraft interview process usually has 1-2 rounds. The most common rounds in the ATS Homekraft interview process are Technical, HR and Resume Shortlist.
How to prepare for ATS Homekraft interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ATS Homekraft. The most common topics and skills that interviewers at ATS Homekraft expect are Real Estate, CRM, Construction, Auditing and Compliance.
What are the top questions asked in ATS Homekraft interview?

Some of the top questions asked at the ATS Homekraft interview -

  1. How much types of formwork is going on at current si...read more
  2. Total flot which we can delay the project without delay finish d...read more
  3. What is QA and QC 5 why process Fish bowl Six sigma Design ...read more

Tell us how to improve this page.

ATS Homekraft Interview Process

based on 17 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
Lodha Group Interview Questions
4.0
 • 124 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all

ATS Homekraft Reviews and Ratings

based on 133 reviews

4.1/5

Rating in categories

3.6

Skill development

3.9

Work-life balance

3.9

Salary

3.7

Job security

3.9

Company culture

3.5

Promotions

3.7

Work satisfaction

Explore 133 Reviews and Ratings
Deputy Manager/ Manager - Human Resource

Noida

8-13 Yrs

₹ 6-10 LPA

Assistant Manager / Deputy Manager - CRM

Delhi/Ncr

3-8 Yrs

₹ 5-6.5 LPA

General Manager Legal

Noida

12-15 Yrs

Not Disclosed

Explore more jobs
Project Engineer
28 salaries
unlock blur

₹4.6 L/yr - ₹8.2 L/yr

Civil Foreman
27 salaries
unlock blur

₹2.9 L/yr - ₹5 L/yr

Assistant Engineer
18 salaries
unlock blur

₹4 L/yr - ₹6 L/yr

Sales Manager
15 salaries
unlock blur

₹7.1 L/yr - ₹9 L/yr

Project Engineer - Civil
15 salaries
unlock blur

₹4.8 L/yr - ₹8.2 L/yr

Explore more salaries
Compare ATS Homekraft with

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

DLF

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview