Round 1 - Technical 

(2 Questions)

  • Q1. What is Total Float?
  • Ans. 

    Total Float is the amount of time a schedule activity can be delayed without delaying the project completion date.

    • Total Float is calculated by subtracting the Early Start date of an activity from its Late Start date.

    • It indicates the flexibility in scheduling a particular activity.

    • Activities with zero Total Float are considered critical path activities.

    • Total Float helps project managers in managing project schedules eff

  • Answered by AI
  • Q2. Rate Analysis of Shuttering?
  • Ans. 

    Rate analysis of shuttering involves calculating the cost of materials, labor, and equipment for formwork used in construction projects.

    • Rate analysis of shuttering includes determining the quantity of materials needed for formwork, such as plywood, steel props, and scaffolding.

    • Labor costs for assembling and dismantling the formwork are also considered in the rate analysis.

    • Equipment costs, such as rental of concrete mix...

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Family background
  • Q2. Earlier experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company culture, Good facilities
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Introduction and a friendly conversation
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Reason for leaving previous company
  • Ans. 

    Seeking new challenges and growth opportunities

    • Desire for career advancement

    • Looking for a more challenging role

    • Seeking new learning opportunities

    • Company restructuring led to changes in job responsibilities

  • Answered by AI
  • Q2. Required skills related questions
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Past experience
  • Q2. Overall Profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Best opportunity to work with a reputed/Processed organization
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. RCC Mivon shuttering experience?
  • Ans. 

    RCC Mivon shuttering experience involves using reinforced concrete construction techniques for formwork and scaffolding.

    • Experience in setting up formwork and scaffolding for reinforced concrete structures

    • Knowledge of RCC Mivon shuttering techniques and materials

    • Ability to interpret construction drawings and plans for RCC Mivon shuttering

    • Experience in coordinating with construction teams and contractors for RCC Mivon sh

  • Answered by AI
  • Q2. Finishing work experience?
  • Q3. Yes , I have. I told them about my job profile. They asked me 4- 5 questions related to work , which I answered well. But not recieved any response later.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare for negotiation in salary structure.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Fundamentals of the functional knowledge
Round 3 - Technical 

(1 Question)

  • Q1. Fundamentals of functional knowledge
Round 4 - HR 

(1 Question)

  • Q1. Expectations of salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Project lifecycle
  • Q2. Project delivery

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical competence will be checked
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

Real estate related to the industry

Round 3 - Technical 

(2 Questions)

  • Q1. 1.Marketing related question as i was being interview for the profile 2.HR questions
  • Q2. HR related qustions in the CV and also situation based

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on confidence building abd basic knowlwdgw about the domain
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Normal Time telephonic round
Round 3 - One-on-one 

(1 Question)

  • Q1. Why do you want to join real estate

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself , Be confident in answering the questions asked , show eagerness to join the company and you shall be selected .

ATS Homekraft Interview FAQs

How many rounds are there in ATS Homekraft Assistant Project Manager interview?
ATS Homekraft interview process usually has 1 rounds. The most common rounds in the ATS Homekraft interview process are Technical.
What are the top questions asked in ATS Homekraft Assistant Project Manager interview?

Some of the top questions asked at the ATS Homekraft Assistant Project Manager interview -

  1. What is Total Flo...read more
  2. Rate Analysis of Shutteri...read more

Tell us how to improve this page.

ATS Homekraft Assistant Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Novel Office Interview Questions
4.1
 • 64 Interviews
Omaxe Interview Questions
4.1
 • 36 Interviews
Smartworks Interview Questions
3.6
 • 33 Interviews
Xanadu Interview Questions
3.5
 • 26 Interviews
DEC Infra Interview Questions
3.7
 • 24 Interviews
DRA Homes Interview Questions
4.5
 • 23 Interviews
Runwal Group Interview Questions
3.8
 • 22 Interviews
Arkade Group Interview Questions
4.2
 • 20 Interviews
N.K. Realtors Interview Questions
4.2
 • 20 Interviews
View all
Project Engineer
29 salaries
unlock blur

₹4.6 L/yr - ₹8.2 L/yr

Civil Foreman
27 salaries
unlock blur

₹2.9 L/yr - ₹5 L/yr

Assistant Engineer
18 salaries
unlock blur

₹4 L/yr - ₹6 L/yr

Project Engineer - Civil
15 salaries
unlock blur

₹4.8 L/yr - ₹8.2 L/yr

Sales Manager
15 salaries
unlock blur

₹7.1 L/yr - ₹9 L/yr

Explore more salaries
Compare ATS Homekraft with

Omaxe

4.1
Compare

Runwal Group

3.8
Compare

Mahindra Lifespace Developers

4.1
Compare

Xanadu

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview