Filter interviews by
I applied via Referral and was interviewed in Nov 2020. There was 1 interview round.
Tiling work involves preparing the surface, measuring and cutting tiles, applying adhesive, laying tiles, and grouting.
Clean and prepare the surface to be tiled
Measure and cut tiles to fit the area
Apply adhesive to the surface and lay tiles in a pattern
Allow adhesive to dry and then apply grout to fill gaps between tiles
Clean excess grout and allow it to dry completely
Stone work involves the process of cutting, shaping, and placing stones to create structures or decorative features.
Selecting the appropriate type of stone for the project
Cutting and shaping the stones using tools such as chisels and hammers
Laying out the stones in a pattern or design
Applying mortar or other bonding agents to secure the stones in place
Finishing the surface of the stones to achieve the desired texture o...
Top trending discussions
I appeared for an interview before Feb 2024.
General questions related to general knowledge.
I appeared for an interview in Jan 2025.
Fundamental logical inquiries.
I am a dedicated and experienced Project Engineer with a strong background in managing engineering projects from conception to completion.
Bachelor's degree in Engineering
5+ years of experience in project management
Proficient in project planning and scheduling software such as Microsoft Project
Strong communication and leadership skills
Experience working on large-scale construction projects, such as building a new hospit...
I have over 5 years of experience in project engineering, including managing multiple projects simultaneously.
Managed various projects from conception to completion
Coordinated with cross-functional teams to ensure project milestones were met
Implemented cost-saving measures to stay within budget
Utilized project management software to track progress and communicate with stakeholders
I led a project to design and implement a new wastewater treatment system for a manufacturing plant.
Researched different wastewater treatment technologies
Collaborated with vendors to select the best equipment for the plant's needs
Designed the layout of the treatment system
Managed the installation and testing of the system
Ensured compliance with environmental regulations
Qualifications for a Project Engineer typically include a bachelor's degree in engineering, relevant work experience, strong technical skills, and project management abilities.
Bachelor's degree in engineering or related field
Relevant work experience in engineering or project management
Strong technical skills in areas such as CAD software, data analysis, and problem-solving
Project management abilities including planning...
Aptitude questions involved reasoning questions
Slump cone test is used to measure the workability of concrete mix.
Determines the consistency and flowability of concrete mix
Helps in ensuring the concrete is of the desired quality and strength
Used to assess the water-cement ratio in the mix
Commonly used in construction projects to monitor the quality of concrete being used
I appeared for an interview before Feb 2024.
General IQ questions
I appeared for an interview in Apr 2025, where I was asked the following questions.
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.
Project is the overall task or objective to be completed within a specific timeframe.
Project engineering focuses on the technical aspects such as planning, designing, and executing the project.
Project management involves coordinating resources and tas...
Types of services in interior fitout include design, construction, project management, and installation.
Design services involve creating layouts, selecting materials, and creating 3D visualizations.
Construction services include building partitions, ceilings, and flooring.
Project management services involve coordinating schedules, budgets, and contractors.
Installation services include fitting furniture, fixtures, and eq...
Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.
Delays in material delivery can impact project timelines and budgets
Inclement weather can halt work progress and cause safety concerns
Coordination issues between different teams can lead to misunderstandings and errors
Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.
Agreement is a mutual understanding between two or more parties.
A bond is a legal document that guarantees the fulfillment of obligations.
Agreements are usually informal and may not always be legally binding.
Bonds are formal and legally enforceable documents.
Examples of agreements include contra...
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was...
based on 1 interview experience
based on 11 reviews
Rating in categories
Project Engineer
34
salaries
| ₹4.9 L/yr - ₹8.2 L/yr |
Civil Foreman
25
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Assistant Engineer
19
salaries
| ₹3.7 L/yr - ₹6 L/yr |
Project Engineer - Civil
15
salaries
| ₹4.8 L/yr - ₹8.2 L/yr |
Assistant Manager
13
salaries
| ₹5.5 L/yr - ₹9.9 L/yr |
Omaxe
Mahindra Lifespace Developers
Runwal Group
Realty Assistant