Filter interviews by
I applied via Referral and was interviewed in Nov 2020. There was 1 interview round.
Tiling work involves preparing the surface, measuring and cutting tiles, applying adhesive, laying tiles, and grouting.
Clean and prepare the surface to be tiled
Measure and cut tiles to fit the area
Apply adhesive to the surface and lay tiles in a pattern
Allow adhesive to dry and then apply grout to fill gaps between tiles
Clean excess grout and allow it to dry completely
Stone work involves the process of cutting, shaping, and placing stones to create structures or decorative features.
Selecting the appropriate type of stone for the project
Cutting and shaping the stones using tools such as chisels and hammers
Laying out the stones in a pattern or design
Applying mortar or other bonding agents to secure the stones in place
Finishing the surface of the stones to achieve the desired texture o
Top trending discussions
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.
Project is the overall task or objective to be completed within a specific timeframe.
Project engineering focuses on the technical aspects such as planning, designing, and executing the project.
Project management involves coordinating resources and tas...
Types of services in interior fitout include design, construction, project management, and installation.
Design services involve creating layouts, selecting materials, and creating 3D visualizations.
Construction services include building partitions, ceilings, and flooring.
Project management services involve coordinating schedules, budgets, and contractors.
Installation services include fitting furniture, fixtures, and eq...
Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.
Delays in material delivery can impact project timelines and budgets
Inclement weather can halt work progress and cause safety concerns
Coordination issues between different teams can lead to misunderstandings and errors
Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.
Agreement is a mutual understanding between two or more parties.
A bond is a legal document that guarantees the fulfillment of obligations.
Agreements are usually informal and may not always be legally binding.
Bonds are formal and legally enforceable documents.
Examples of agreements include contra...
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
posted on 7 Apr 2022
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
How many children and studying in class?
I currently live in New York City with my spouse and two children.
Living in New York City with spouse and two children
Total of four dependents including spouse and two children
Yes , after successful interview round, received offer letter from the company and same day replied.
Yes , after successful interview round, received offer.
I applied via Walk-in and was interviewed in Jun 2022. There was 1 interview round.
The density of cement, steel, and aggregate varies.
The density of cement typically ranges from 1,100 to 1,500 kg/m³.
The density of steel is around 7,800 kg/m³.
The density of aggregate depends on its type, with values ranging from 1,400 to 2,900 kg/m³.
These values may vary depending on the specific composition and properties of the materials.
The Slump test is used to measure the consistency of fresh concrete before it sets.
It measures the workability of concrete.
It determines the water content in the concrete.
It helps to ensure that the concrete is of the desired consistency for the intended use.
The test involves filling a standard slump cone with fresh concrete and then measuring the slump of the concrete after the cone is removed.
The slump is the differe...
15-day program sheet for steel quantity of 850 sqft, 60 columns of size 600x300 mm, 30 Mt steel & steel shuttering.
Prepare a detailed BOQ for steel and shuttering
Calculate the required manpower and machinery
Plan the procurement and delivery of materials
Schedule the fabrication and installation of steel
Allocate time for quality checks and inspections
posted on 27 Dec 2022
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
based on 10 reviews
Rating in categories
Project Engineer
29
salaries
| ₹4.6 L/yr - ₹8.2 L/yr |
Civil Foreman
26
salaries
| ₹2.9 L/yr - ₹5 L/yr |
Assistant Engineer
18
salaries
| ₹4 L/yr - ₹6 L/yr |
Sales Manager
16
salaries
| ₹7.1 L/yr - ₹9 L/yr |
Project Engineer - Civil
16
salaries
| ₹4.8 L/yr - ₹8.2 L/yr |
Godrej Properties
Sobha
Prestige Group
DLF