Upload Button Icon Add office photos

ATS Homekraft

Compare button icon Compare button icon Compare

Filter interviews by

ATS Homekraft Project Engineer Interview Questions and Answers

Updated 4 May 2021

ATS Homekraft Project Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Procedure of tiling work?
  • Ans. 

    Tiling work involves preparing the surface, measuring and cutting tiles, applying adhesive, laying tiles, and grouting.

    • Clean and prepare the surface to be tiled

    • Measure and cut tiles to fit the area

    • Apply adhesive to the surface and lay tiles in a pattern

    • Allow adhesive to dry and then apply grout to fill gaps between tiles

    • Clean excess grout and allow it to dry completely

  • Answered by AI
  • Q2. Procedure of stone work?
  • Ans. 

    Stone work involves the process of cutting, shaping, and placing stones to create structures or decorative features.

    • Selecting the appropriate type of stone for the project

    • Cutting and shaping the stones using tools such as chisels and hammers

    • Laying out the stones in a pattern or design

    • Applying mortar or other bonding agents to secure the stones in place

    • Finishing the surface of the stones to achieve the desired texture o...

  • Answered by AI
  • Q3. A test for drawing study?
  • Q4. Tell about yourself?
  • Q5. Why do you want to leave your previous employer?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be polite,be formel & be confident.

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about ATS Homekraft?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Aptitude Test 

General questions related to general knowledge.

Round 2 - Technical 

(2 Questions)

  • Q1. Auto cad drawing
  • Q2. Revit drawing
Round 3 - HR 

(1 Question)

  • Q1. Questions related to software

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Given a starting time, find the minimum number of minutes needed ... read more
asked in Wipro
Q4. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q5. Mindbending Product Problem Statement You are given an array ARR ... read more
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Assignment 

Fundamental logical inquiries.

Round 2 - HR 

(2 Questions)

  • Q1. Can you introduce yourself?
  • Ans. 

    I am a dedicated and experienced Project Engineer with a strong background in managing engineering projects from conception to completion.

    • Bachelor's degree in Engineering

    • 5+ years of experience in project management

    • Proficient in project planning and scheduling software such as Microsoft Project

    • Strong communication and leadership skills

    • Experience working on large-scale construction projects, such as building a new hospit...

  • Answered by AI
  • Q2. Could you elaborate on your experience?
  • Ans. 

    I have over 5 years of experience in project engineering, including managing multiple projects simultaneously.

    • Managed various projects from conception to completion

    • Coordinated with cross-functional teams to ensure project milestones were met

    • Implemented cost-saving measures to stay within budget

    • Utilized project management software to track progress and communicate with stakeholders

  • Answered by AI
Round 3 - departmental 

(2 Questions)

  • Q1. Basic Civil questions
  • Q2. Explain your project
  • Ans. 

    I led a project to design and implement a new wastewater treatment system for a manufacturing plant.

    • Researched different wastewater treatment technologies

    • Collaborated with vendors to select the best equipment for the plant's needs

    • Designed the layout of the treatment system

    • Managed the installation and testing of the system

    • Ensured compliance with environmental regulations

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - HR 

(1 Question)

  • Q1. What are the Qualifications?
  • Ans. 

    Qualifications for a Project Engineer typically include a bachelor's degree in engineering, relevant work experience, strong technical skills, and project management abilities.

    • Bachelor's degree in engineering or related field

    • Relevant work experience in engineering or project management

    • Strong technical skills in areas such as CAD software, data analysis, and problem-solving

    • Project management abilities including planning...

  • Answered by AI
Round 2 - Aptitude Test 

Aptitude questions involved reasoning questions

Round 3 - Technical 

(1 Question)

  • Q1. Why is slump cone test used?
  • Ans. 

    Slump cone test is used to measure the workability of concrete mix.

    • Determines the consistency and flowability of concrete mix

    • Helps in ensuring the concrete is of the desired quality and strength

    • Used to assess the water-cement ratio in the mix

    • Commonly used in construction projects to monitor the quality of concrete being used

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - HR 

(1 Question)

  • Q1. Regarding Novel
Round 2 - Aptitude Test 

General IQ questions

Round 3 - Technical 

(1 Question)

  • Q1. Regarding civil

Interview Preparation Tips

Interview preparation tips for other job seekers - Great place if you are starting your career.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I appeared for an interview in Apr 2025, where I was asked the following questions.

  • Q1. Types of Construction process / interior process
  • Q2. General roles / responsibilities
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffirence between project and project engineering
  • Ans. 

    Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.

    • Project is the overall task or objective to be completed within a specific timeframe.

    • Project engineering focuses on the technical aspects such as planning, designing, and executing the project.

    • Project management involves coordinating resources and tas...

  • Answered by AI
  • Q2. Types of services in interior fitout
  • Ans. 

    Types of services in interior fitout include design, construction, project management, and installation.

    • Design services involve creating layouts, selecting materials, and creating 3D visualizations.

    • Construction services include building partitions, ceilings, and flooring.

    • Project management services involve coordinating schedules, budgets, and contractors.

    • Installation services include fitting furniture, fixtures, and eq...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Problems faced in site
  • Ans. 

    Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.

    • Delays in material delivery can impact project timelines and budgets

    • Inclement weather can halt work progress and cause safety concerns

    • Coordination issues between different teams can lead to misunderstandings and errors

  • Answered by AI
  • Q2. Difference between agreement and bond
  • Ans. 

    Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.

    • Agreement is a mutual understanding between two or more parties.

    • A bond is a legal document that guarantees the fulfillment of obligations.

    • Agreements are usually informal and may not always be legally binding.

    • Bonds are formal and legally enforceable documents.

    • Examples of agreements include contra...

  • Answered by AI
Are these interview questions helpful?

Interview Questionnaire 

1 Question

  • Q1. The will ask you to technical
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Painting Quantity & type of paint?
  • Ans. 

    The painting quantity and type of paint depend on the project requirements and specifications.

    • The painting quantity is determined by the surface area to be painted and the number of coats required.

    • The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.

    • Common types of paint include acrylic, latex, oil-based, and epoxy paints.

    • The quantity and type of paint may vary...

  • Answered by AI
  • Q2. Bar bending schedule & Reinforcement details?
  • Ans. 

    Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.

    • Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.

    • It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.

    • BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...

  • Answered by AI
  • Q3. How to calculate Block work Quantity?
  • Ans. 

    Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.

    • Measure the length, width, and height of the blocks

    • Calculate the volume of each block by multiplying the length, width, and height

    • Determine the area to be covered by measuring the length and height of the wall

    • Divide the area by the volume of each block to get the quantity needed

    • Consider adding extra blocks for was...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Briefly&correctly tell us the details of what you have done in our previous company
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. They are asking about the project experience with relevant technical questions
Round 3 - HR 

(1 Question)

  • Q1. Salary package and previous company experience certificates

Interview Preparation Tips

Interview preparation tips for other job seekers - They are appointing only experienced guys. Nice company

ATS Homekraft Interview FAQs

How to prepare for ATS Homekraft Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ATS Homekraft. The most common topics and skills that interviewers at ATS Homekraft expect are Project Engineering, Equipment Maintenance, Billing Engineering, Boq Preparation and Construction Equipment.
What are the top questions asked in ATS Homekraft Project Engineer interview?

Some of the top questions asked at the ATS Homekraft Project Engineer interview -

  1. Procedure of tiling wo...read more
  2. Procedure of stone wo...read more
  3. A test for drawing stu...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Interview Questions from Similar Companies

InvestoXpert Interview Questions
4.2
 • 78 Interviews
Novel Office Interview Questions
4.1
 • 68 Interviews
Omaxe Interview Questions
4.1
 • 37 Interviews
Smartworks Interview Questions
3.5
 • 36 Interviews
Xanadu Interview Questions
3.4
 • 29 Interviews
DEC Infra Interview Questions
3.8
 • 25 Interviews
Arkade Group Interview Questions
3.9
 • 24 Interviews
Runwal Group Interview Questions
3.8
 • 23 Interviews
DRA Homes Interview Questions
4.6
 • 23 Interviews
View all
ATS Homekraft Project Engineer Salary
based on 34 salaries
₹4.9 L/yr - ₹8.3 L/yr
18% more than the average Project Engineer Salary in India
View more details

ATS Homekraft Project Engineer Reviews and Ratings

based on 11 reviews

3.9/5

Rating in categories

3.3

Skill development

3.3

Work-life balance

4.1

Salary

3.2

Job security

3.6

Company culture

3.8

Promotions

3.3

Work satisfaction

Explore 11 Reviews and Ratings
Project Engineer
34 salaries
unlock blur

₹4.9 L/yr - ₹8.2 L/yr

Civil Foreman
25 salaries
unlock blur

₹3.3 L/yr - ₹5 L/yr

Assistant Engineer
19 salaries
unlock blur

₹3.7 L/yr - ₹6 L/yr

Project Engineer - Civil
15 salaries
unlock blur

₹4.8 L/yr - ₹8.2 L/yr

Assistant Manager
13 salaries
unlock blur

₹5.5 L/yr - ₹9.9 L/yr

Explore more salaries
Compare ATS Homekraft with

Omaxe

4.1
Compare

Mahindra Lifespace Developers

4.1
Compare

Runwal Group

3.8
Compare

Realty Assistant

3.7
Compare
write
Share an Interview