Filter interviews by
Technically and mathematics and our I q test
Measurements for project drawings and quantities can be determined through detailed analysis and calculations.
Measurements can be taken directly from the project drawings using scales and measuring tools.
Quantities can be calculated based on the dimensions provided in the drawings.
Software tools like AutoCAD and Revit can also be used to accurately measure quantities and dimensions.
Bill of Quantities (BOQ) can be prepa...
I applied via Campus Placement and was interviewed before Nov 2021. There were 4 interview rounds.
Topics very generic like which is better online learning or offline learning, theory or practical etc
Aluminium shuttering is a modern construction technique that involves using interlocking panels made of aluminium to form the walls, floors, and ceilings of a building.
The panels are lightweight and easy to handle, making them ideal for use in high-rise buildings and other large-scale construction projects.
The panels are pre-fabricated to the required dimensions and are then transported to the construction site.
The pan...
Yes, I have worked with Mivan shuttering in previous projects.
I have experience in setting up and dismantling Mivan formwork for concrete construction
I am familiar with the process of pouring concrete into Mivan shuttering to create walls and slabs
I have worked with Mivan system in residential and commercial projects
I understand the importance of proper alignment and bracing when using Mivan shuttering
Internal plaster thickness and ratio are important factors in construction projects.
The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.
The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).
The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.
Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.
Check for proper reinforcement placement and spacing
Verify concrete mix design and curing process
Inspect for any cracks or defects
Ensure slab thickness meets design specifications
Perform load testing if necessary
External plaster thickness and ratio are determined based on the type of surface and desired finish.
External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.
The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.
For better adhesion, a bonding agent may be added to the plaster mix.
Proper curing is essential to ensure the stren
Density of common construction materials varies, with cement around 1440 kg/m3, steel around 7850 kg/m3, fine aggregate around 1600-1750 kg/m3, and coarse aggregate around 1200-1750 kg/m3.
Cement density: 1440 kg/m3
Steel density: 7850 kg/m3
Fine aggregate density: 1600-1750 kg/m3
Coarse aggregate density: 1200-1750 kg/m3
The weight of the cube used to check the strength of concrete is typically 15 cm x 15 cm x 15 cm and weighs around 29 kg.
Standard size of cube for testing concrete strength is 15 cm x 15 cm x 15 cm
Weight of the cube is usually around 29 kg
The cube is made of concrete from the same batch being tested
The ratio of cement mortar for outer and inner wall plastering varies depending on the type of wall and desired finish.
The ratio of cement mortar for outer wall plastering is usually 1:4 (1 part cement to 4 parts sand).
The ratio of cement mortar for inner wall plastering is typically 1:6 (1 part cement to 6 parts sand).
However, the ratio can vary based on factors such as the type of wall surface, desired finish, and lo...
My goal is to become a proficient Site Engineer by gaining experience, knowledge, and skills in the field.
Continuously seek opportunities to learn and improve technical skills
Work on various projects to gain practical experience
Seek mentorship from experienced engineers
Stay updated with industry trends and technologies
Obtain relevant certifications to enhance credibility
Set specific career milestones to track progress
I envision myself as a Senior Site Engineer leading projects and mentoring junior engineers.
Leading and managing multiple projects simultaneously
Mentoring and training junior engineers
Implementing innovative technologies and practices
Collaborating with cross-functional teams for successful project delivery
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.
I appeared for an interview in Jan 2024.
Building construction involves the process of planning, designing, and constructing structures.
Building construction includes various stages such as site preparation, foundation construction, structural framing, and finishing.
It involves the use of materials like concrete, steel, wood, and bricks.
Construction techniques and methods vary depending on the type of building, such as residential, commercial, or industrial.
B...
Bulding drawing seen
Work & process detial
based on 5 reviews
Rating in categories
Civil Site Engineer
68
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Site Engineer
44
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Senior Engineer
43
salaries
| ₹3.1 L/yr - ₹8.8 L/yr |
Junior Engineer
40
salaries
| ₹1.1 L/yr - ₹4 L/yr |
Junior Engineer Civil
34
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Omaxe
Runwal Group
Mahindra Lifespace Developers
Realty Assistant