To find sand and cement quantity for 1sqm of wall plastering area, certain calculations need to be done.
Determine the thickness of the plastering required
Calculate the volume of plastering required
Determine the ratio of sand and cement to be used
Calculate the quantity of sand and cement required based on the ratio
Add water to the mixture and mix thoroughly to get the plastering material
Drawing to calculate steel for what purpose?
Need more information on the purpose of the steel calculation
Is it for a building, bridge, or other structure?
What are the load requirements and environmental factors?
Consult engineering standards and codes for appropriate calculations
Top trending discussions
I applied via Apna Jobs and was interviewed in Oct 2024. There was 1 interview round.
I appeared for an interview in Dec 2021.
I applied via Campus Placement and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 15 reviews
Rating in categories
Civil Site Engineer
68
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer Civil
33
salaries
| ₹0 L/yr - ₹0 L/yr |
GMR Group
Reliance Infrastructure
Adani Infra
Essar Infrastructure Services