Filter interviews by
I applied via Walk-in and was interviewed in Jun 2022. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
ATS Infrastructure interview questions for popular designations
Get interview-ready with Top ATS Infrastructure Interview Questions
LD reduces workability and increases the risk of cracking in high grade concrete.
LD (Lignite Dust) is a fine powder that is added to concrete to improve workability.
However, in high grade concrete, LD can reduce workability and increase the risk of cracking.
This is because high grade concrete has a lower water-cement ratio, which means there is less water available to hydrate the cement and make the concrete workable.
A...
I was interviewed in Jan 2022.
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.
BBS is crucial for ensuring safety and quality in construction projects.
BBS stands for Bar Bending Schedule and is used to detail the reinforcement required in concrete structures.
It helps ensure that the reinforcement is placed correctly and in the right quantity, which is crucial for the safety and durability of the structure.
BBS also helps in estimating the amount of steel required for the project, which is importan...
Top trending discussions
Interview experience
based on 457 reviews
Rating in categories
Assistant Manager
76
salaries
| ₹3.6 L/yr - ₹9.4 L/yr |
Project Engineer
66
salaries
| ₹4.2 L/yr - ₹8 L/yr |
Civil Foreman
58
salaries
| ₹2.4 L/yr - ₹5.2 L/yr |
Senior Project Engineer
38
salaries
| ₹5.4 L/yr - ₹8.4 L/yr |
Assistant Project Manager
32
salaries
| ₹7.1 L/yr - ₹11 L/yr |
DLF
Sobha
Prestige Group
Godrej Properties