BBS is crucial for ensuring safety and quality in construction projects.
BBS stands for Bar Bending Schedule and is used to detail the reinforcement required in concrete structures.
It helps ensure that the reinforcement is placed correctly and in the right quantity, which is crucial for the safety and durability of the structure.
BBS also helps in estimating the amount of steel required for the project, which is importan...
Top trending discussions
I applied via Indeed and was interviewed in Oct 2023. There was 1 interview round.
Yes, standard codes are used for concrete mix design to ensure quality and safety.
Standard codes provide guidelines for selecting materials, proportions, and testing procedures for concrete mix design.
Examples of standard codes include ACI 318 for structural concrete and ASTM C94 for ready-mixed concrete.
Following standard codes helps ensure the durability, strength, and workability of the concrete mix.
posted on 19 Apr 2023
I appeared for an interview before Dec 2019.
I applied via Approached by Company and was interviewed in Aug 2023. There were 4 interview rounds.
Written/Aptitude test: The first round for most of the companies is written round. ...
Concrete batch time affects the temperature of heat produced during the curing process.
The batch time of concrete refers to the duration for which the concrete ingredients are mixed together.
A longer batch time can lead to higher temperatures being produced during the curing process.
The heat generated during curing is important as it affects the strength and durability of the concrete.
Proper monitoring and control of b...
Types of footing include spread footings, mat foundations, pile foundations, and drilled caissons.
Spread footings are used for shallow foundations and distribute the load over a larger area.
Mat foundations are used for heavy loads and distribute the load over a larger area.
Pile foundations are used when soil conditions are poor and transfer the load to deeper, more stable soil layers.
Drilled caissons are used for heavy...
Yes, bricks absorb water due to their porous nature.
Bricks have small pores that allow water to seep in.
Water absorption can lead to deterioration of bricks over time.
Bricks with high absorption rates may not be suitable for certain climates or applications.
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
General knowledge skills
Worked as a Project Engineer at a construction company for 5 years.
Managed multiple civil engineering projects simultaneously
Coordinated with architects, contractors, and clients to ensure project success
Performed site inspections and quality control checks
Prepared project schedules and budgets
Resolved any issues or conflicts that arose during construction
I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jul 2023. There were 3 interview rounds.
General maths, logical reasoning
I will execute the structures by following the design plans, coordinating with various teams, ensuring quality control, and adhering to safety regulations.
Follow the design plans provided by the structural engineers
Coordinate with other teams such as architects, contractors, and subcontractors
Ensure quality control throughout the construction process
Adhere to safety regulations and standards
Regularly inspect the constr...
Some hurdles in execution include delays, budget constraints, unforeseen site conditions, and coordination issues.
Delays in obtaining permits or approvals
Budget constraints leading to value engineering or scope reductions
Unforeseen site conditions such as poor soil quality or environmental issues
Coordination issues with subcontractors or other project stakeholders
I applied via Company Website and was interviewed before Oct 2020. There were 4 interview rounds.
SFD & BMD for a simply supported load
SFD is a diagram that shows the variation of shear force along the length of a beam
BMD is a diagram that shows the variation of bending moment along the length of a beam
For a simply supported load, the SFD will be a straight line with a constant slope
The BMD will be a parabolic curve with the maximum value at the center of the beam
The SFD and BMD can be calculated using equations an
Round was quite easy, for mechanical they had turbo machinery and heat transfer questions and basic SOM,TOM,MD,MF
Lifts work on the principle of pulleys and counterweights while ACs work on the principle of refrigeration.
Lifts use a motor to move a counterweight that balances the weight of the lift car and its occupants.
ACs use a compressor to compress and expand refrigerant gas to absorb and release heat.
Types of ACs include window ACs, split ACs, central ACs, and portable ACs.
Window ACs are mounted on windows and cool a single r...
based on 4 reviews
Rating in categories
Project Engineer
66
salaries
| ₹4.2 L/yr - ₹8 L/yr |
Assistant Manager
54
salaries
| ₹4.2 L/yr - ₹9.1 L/yr |
Civil Foreman
42
salaries
| ₹2.8 L/yr - ₹5.2 L/yr |
Senior Project Engineer
38
salaries
| ₹5.4 L/yr - ₹8.4 L/yr |
Assistant Project Manager
32
salaries
| ₹7.1 L/yr - ₹11 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties