Upload Button Icon Add office photos

DLF

Compare button icon Compare button icon Compare

Filter interviews by

DLF Project Engineer - Civil Interview Questions and Answers

Updated 28 May 2024

DLF Project Engineer - Civil Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Dec 2019.

Interview Questionnaire 

1 Question

  • Q1. Work experience

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is density of steel
  • Ans. 

    The density of steel is approximately 7.85 grams per cubic centimeter.

    • The density of steel is a measure of how much mass is contained in a given volume of steel.

    • It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel alloy.

    • For example, the density of carbon steel is typically around 7.85...

  • Answered by AI
  • Q2. Why men is dominant in site work than women?
  • Ans. 

    Men are dominant in site work due to various societal and cultural factors.

    • Historically, construction and site work have been male-dominated industries.

    • Stereotypes and biases have led to fewer women pursuing careers in civil engineering and related fields.

    • Physical demands and safety concerns associated with site work may discourage some women from entering the field.

    • Lack of representation and mentorship for women in si...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jul 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Regarding my job experience
  • Q2. Regarding details of is codes and execution steps and procedures.
Round 2 - Aptitude Test 

General maths, logical reasoning

Round 3 - Technical 

(2 Questions)

  • Q1. As an engineer how will i execute the structures
  • Ans. 

    I will execute the structures by following the design plans, coordinating with various teams, ensuring quality control, and adhering to safety regulations.

    • Follow the design plans provided by the structural engineers

    • Coordinate with other teams such as architects, contractors, and subcontractors

    • Ensure quality control throughout the construction process

    • Adhere to safety regulations and standards

    • Regularly inspect the constr...

  • Answered by AI
  • Q2. What are the hurdles we face while execution
  • Ans. 

    Some hurdles in execution include delays, budget constraints, unforeseen site conditions, and coordination issues.

    • Delays in obtaining permits or approvals

    • Budget constraints leading to value engineering or scope reductions

    • Unforeseen site conditions such as poor soil quality or environmental issues

    • Coordination issues with subcontractors or other project stakeholders

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Written/Aptitude test: The first round for most of the companies is written round. ...

Round 3 - Technical 

(4 Questions)

  • Q1. Technical interview Round: The next round is a technical interview
  • Q2. 1.Concrete batch time which temperature of heat produced
  • Ans. 

    Concrete batch time affects the temperature of heat produced during the curing process.

    • The batch time of concrete refers to the duration for which the concrete ingredients are mixed together.

    • A longer batch time can lead to higher temperatures being produced during the curing process.

    • The heat generated during curing is important as it affects the strength and durability of the concrete.

    • Proper monitoring and control of b...

  • Answered by AI
  • Q3. Types of footing
  • Ans. 

    Types of footing include spread footings, mat foundations, pile foundations, and drilled caissons.

    • Spread footings are used for shallow foundations and distribute the load over a larger area.

    • Mat foundations are used for heavy loads and distribute the load over a larger area.

    • Pile foundations are used when soil conditions are poor and transfer the load to deeper, more stable soil layers.

    • Drilled caissons are used for heavy...

  • Answered by AI
  • Q4. Bricks absorb water
  • Ans. 

    Yes, bricks absorb water due to their porous nature.

    • Bricks have small pores that allow water to seep in.

    • Water absorption can lead to deterioration of bricks over time.

    • Bricks with high absorption rates may not be suitable for certain climates or applications.

  • Answered by AI
Round 4 - One-on-one 

(2 Questions)

  • Q1. For technical questions
  • Q2. Work experience will be explain

Interview Preparation Tips

Interview preparation tips for other job seekers - Develope to your field experience 👍

I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Estimate ,Rate analysis, Quantity takeoff and bbs
Round 3 - HR 

(2 Questions)

  • Q1. Previous company details
  • Q2. And why did left your previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - BE CONFIDENT AND POSITIVE.
Be through with your basics.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

General knowledge skills

Round 2 - Technical 

(5 Questions)

  • Q1. Your previous company experience
  • Ans. 

    Worked as a Project Engineer at a construction company for 5 years.

    • Managed multiple civil engineering projects simultaneously

    • Coordinated with architects, contractors, and clients to ensure project success

    • Performed site inspections and quality control checks

    • Prepared project schedules and budgets

    • Resolved any issues or conflicts that arose during construction

  • Answered by AI
  • Q2. Asking your previous work experience
  • Q3. Structure related questions
  • Q4. Finishing related question
  • Q5. Water proofing related question and Bbs

Interview Preparation Tips

Interview preparation tips for other job seekers - Development your technical knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Civil engineer 

(2 Questions)

  • Q1. Block work, plastering, putty, painting, gypsum, Tile,
  • Q2. Block work plastering putty , painting , gypsum, tile marble,

Interview Preparation Tips

Interview preparation tips for other job seekers - Every question I can speak
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About previous projects.
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations.

Interview Preparation Tips

Interview preparation tips for other job seekers - Proper channel. Naukri. Hr mail.

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

Interview Questionnaire 

1 Question

  • Q1. LOGICAL THINKING AND IFRS AND FUNDAMENTALS OF ACCOUNTING

Tell us how to improve this page.

DLF Project Engineer - Civil Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 128 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Ashiana Housing Interview Questions
4.0
 • 29 Interviews
View all
DLF Project Engineer - Civil Salary
based on 6 salaries
₹5 L/yr - ₹7.2 L/yr
At par with the average Project Engineer - Civil Salary in India
View more details
Assistant Manager
165 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
118 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant General Manager
102 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
95 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
80 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare DLF with

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

Sobha

3.9
Compare

Brigade Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview