Ring cutting length refers to the measurement of the length of a ring that needs to be cut.
Ring cutting length is determined by measuring the circumference of the ring and dividing it by π (pi).
The formula for calculating the ring cutting length is: L = C / π, where L is the cutting length and C is the circumference of the ring.
For example, if the circumference of a ring is 10 cm, the cutting length would be approximat
The slump in concrete grade m-40 is typically between 75mm to 125mm.
Slump is a measure of the consistency or workability of concrete.
For concrete grade m-40, the slump range is usually between 75mm to 125mm.
Slump is determined by conducting a slump test, where a cone-shaped mold is filled with concrete and then removed to measure the slump.
The slump value indicates the flow and compactness of the concrete mix.
A higher ...
I applied via Naukri.com and was interviewed before Sep 2019. There were 5 interview rounds.
The construction cost was $10 million.
The total cost of construction was $10 million.
The cost included materials, labor, and equipment.
The project was completed within budget.
The cost was higher than anticipated due to unexpected delays.
The cost was lower than expected due to efficient planning and management.
I will analyze the reasons for the cost overrun and develop a plan to mitigate it.
Identify the root cause of the cost overrun
Review the project budget and timeline
Develop a plan to reduce costs without compromising quality
Communicate the situation to stakeholders and seek their input
Implement the plan and monitor progress closely
It depends on the project and its priorities.
Cost over run may be acceptable if the project has a tight budget and the delay is not critical.
Time over run may be acceptable if the project has a strict deadline and the additional cost can be managed.
Both cost and time over runs should be avoided as they can impact the project's success and reputation.
The decision should be based on a thorough analysis of the project's p...
It depends on the project and its priorities.
If the project is time-sensitive, then time under budget is worse.
If the project has a fixed deadline, then cost under budget is worse.
If the project has both time and cost constraints, then it depends on which constraint is more critical.
In general, it is better to have a balanced approach to managing both time and cost.
It is important to communicate any deviations from the
I applied via Naukri.com and was interviewed before Jan 2020. There were 3 interview rounds.
Top trending discussions
based on 27 interviews
Interview experience
based on 467 reviews
Rating in categories
Project Engineer
66
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Foreman
55
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Project Engineer
38
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Project Manager
32
salaries
| ₹0 L/yr - ₹0 L/yr |
DLF
Sobha
Prestige Group
Godrej Properties