Q1. what is worse - cost under budget or time under budget ?

Ans.

It depends on the project and its priorities.

  • If the project is time-sensitive, then time under budget is worse.

  • If the project has a fixed deadline, then cost under budget is worse.

  • If the project has both time and cost constraints, then it depends on which constraint is more critical.

  • In general, it is better to have a balanced approach to managing both time and cost.

  • It is important to communicate any deviations from the budget or timeline to stakeholders.

Add your answer

Q2. what is better - cost over run or time over run ?/

Ans.

It depends on the project and its priorities.

  • Cost over run may be acceptable if the project has a tight budget and the delay is not critical.

  • Time over run may be acceptable if the project has a strict deadline and the additional cost can be managed.

  • Both cost and time over runs should be avoided as they can impact the project's success and reputation.

  • The decision should be based on a thorough analysis of the project's priorities and constraints.

  • Effective planning and risk mana...read more

Add your answer

Q3. How much slump in concrete grade m-40

Ans.

The slump in concrete grade m-40 is typically between 75mm to 125mm.

  • Slump is a measure of the consistency or workability of concrete.

  • For concrete grade m-40, the slump range is usually between 75mm to 125mm.

  • Slump is determined by conducting a slump test, where a cone-shaped mold is filled with concrete and then removed to measure the slump.

  • The slump value indicates the flow and compactness of the concrete mix.

  • A higher slump value indicates a more workable and fluid concrete m...read more

View 2 more answers

Q4. what will you if the project runs over cost ?

Ans.

I will analyze the reasons for the cost overrun and develop a plan to mitigate it.

  • Identify the root cause of the cost overrun

  • Review the project budget and timeline

  • Develop a plan to reduce costs without compromising quality

  • Communicate the situation to stakeholders and seek their input

  • Implement the plan and monitor progress closely

Add your answer
Discover Linetech interview dos and don'ts from real experiences

Q5. Ring cutting length

Ans.

Ring cutting length refers to the measurement of the length of a ring that needs to be cut.

  • Ring cutting length is determined by measuring the circumference of the ring and dividing it by π (pi).

  • The formula for calculating the ring cutting length is: L = C / π, where L is the cutting length and C is the circumference of the ring.

  • For example, if the circumference of a ring is 10 cm, the cutting length would be approximately 3.18 cm.

View 6 more answers

Q6. How to control deviation in vertically elements.

Ans.

To control deviation in vertically elements, proper leveling techniques and equipment must be used.

  • Use a precise leveling instrument such as a digital level or an automatic level

  • Ensure the instrument is properly calibrated before use

  • Establish a benchmark or reference point for vertical control

  • Use a leveling rod or staff to measure height differences accurately

  • Perform regular checks and adjustments during the survey to maintain accuracy

  • Consider factors like temperature, atmosp...read more

View 1 answer
Are these interview questions helpful?

Q7. what was the construction cost

Ans.

The construction cost was $10 million.

  • The total cost of construction was $10 million.

  • The cost included materials, labor, and equipment.

  • The project was completed within budget.

  • The cost was higher than anticipated due to unexpected delays.

  • The cost was lower than expected due to efficient planning and management.

Add your answer

Q8. How will cross check column position

Ans.

Cross checking column position in land surveying

  • Cross check column position by comparing measurements from different surveying techniques

  • Use multiple surveying instruments to verify column positions

  • Compare measurements with existing reference points or benchmarks

  • Ensure accuracy by repeating measurements and averaging the results

  • Document and record all measurements and cross-checking steps for future reference

View 1 answer
Share interview questions and help millions of jobseekers 🌟

Q9. What is an LPA and difference with FAO Timelines in Sec 138 NIA What is Sec 7 and 9 in IBC

Ans.

LPA stands for Lasting Power of Attorney, which is a legal document that allows a person to appoint someone to make decisions on their behalf. FAO refers to Foreign Account Operations, which involves managing financial accounts held outside one's home country.

  • LPA is used in the context of appointing someone to act on behalf of an individual in case they become mentally incapacitated.

  • FAO involves managing financial accounts held in foreign countries, often for individuals or b...read more

Add your answer

Q10. How to control plastering thikness

Ans.

To control plastering thickness, proper preparation, use of guides, and regular measurements are essential.

  • Ensure the surface is clean and free from debris before applying plaster.

  • Use guides such as screeds or battens to maintain a consistent thickness.

  • Regularly measure the thickness using a measuring tape or a thickness gauge.

  • Adjust the amount of plaster applied based on the measurements to achieve the desired thickness.

  • Take into account any variations in the substrate or sp...read more

View 1 answer

Q11. Less ld in high grade concrete why?

Ans.

LD reduces workability and increases the risk of cracking in high grade concrete.

  • LD (Lignite Dust) is a fine powder that is added to concrete to improve workability.

  • However, in high grade concrete, LD can reduce workability and increase the risk of cracking.

  • This is because high grade concrete has a lower water-cement ratio, which means there is less water available to hydrate the cement and make the concrete workable.

  • Adding LD to high grade concrete can further reduce the amo...read more

Add your answer

Q12. No of brick in 1 cubic meter

Ans.

The number of bricks in 1 cubic meter varies depending on the size of the bricks used.

  • The number of bricks in 1 cubic meter will depend on the size of the bricks being used.

  • Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.

  • Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.

Add your answer

Q13. How to calculate rate escalation?

Add your answer

Q14. Plaster deductions as per IS 1200

Add your answer

Q15. How to recover Mobilisation advance?

Add your answer

Q16. What is rolling margin?

Add your answer

Q17. Labour rates for various items of work

Add your answer

Q18. BBS Most important

Ans.

BBS is crucial for ensuring safety and quality in construction projects.

  • BBS stands for Bar Bending Schedule and is used to detail the reinforcement required in concrete structures.

  • It helps ensure that the reinforcement is placed correctly and in the right quantity, which is crucial for the safety and durability of the structure.

  • BBS also helps in estimating the amount of steel required for the project, which is important for budgeting and cost control.

  • It is important to have a...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Linetech

based on 4 interviews in the last 1 year
Interview experience
4.5
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.9
 • 392 Interview Questions
3.7
 • 367 Interview Questions
3.4
 • 247 Interview Questions
4.2
 • 203 Interview Questions
4.3
 • 189 Interview Questions
3.7
 • 144 Interview Questions
View all
Top ATS Infrastructure Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter