Traversing is the method used to measure and map land by moving from one point to another.
Traversing involves measuring angles and distances between points to create a network of interconnected lines.
Common methods of traversing include the compass rule, the transit rule, and the chain and compass method.
Traversing can be done using traditional surveying instruments like theodolites and total stations, or with modern G...
Method of leveling is the process of determining the elevation of a point relative to a reference point.
The most common method of leveling is using a spirit level or a laser level.
Another method is trigonometric leveling, which uses trigonometry to calculate elevations.
Differential leveling involves measuring the difference in elevation between two points using a level and a rod.
Barometric leveling uses atmospheric pre...
Traversing calculation involves measuring angles and distances between survey points to determine their relative positions.
Traversing involves a series of measurements taken between survey points
Angles are measured using a theodolite or total station
Distances are measured using a tape or electronic distance meter
Calculations are then performed to determine the coordinates of each point
Errors can be minimized by using r
I applied via Walk-in and was interviewed before Nov 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.
Top trending discussions
posted on 3 Feb 2025
posted on 26 Jan 2024
I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.
The question asks about the code for mode of measurement, types of joints in flooring, and previous projects and estimation preparation.
The code for mode of measurement refers to the standard method used to measure quantities in construction projects.
Types of joints in flooring include butt joints, tongue and groove joints, and expansion joints.
Previous projects can include residential buildings, commercial complexes, ...
I have operated various surveying instruments including total stations, GPS receivers, and levels. I am proficient in AutoCAD 2D.
Operated total stations for precise angle and distance measurements
Used GPS receivers for satellite-based positioning
Utilized levels for determining elevations
Proficient in AutoCAD 2D for drafting and design work
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is the current annual salary of the candidate.
Expected CTC is the annual salary the candidate is expecting from the new job.
It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.
For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.
Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.
I prepare detailed estimates based on quantities of materials and labor required for a project.
I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.
I use software tools...
Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.
Check quantities mentioned in the bill against the actual work done on site.
Verify rates and unit prices for each item in the bill with the contract agreement.
Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.
Conduct site measurements to confirm the work completed matches the
Evidential documents required for scrutinizing the RA Bill
Contract documents
Measurement sheets
Bills of quantities
Variation orders
Payment certificates
Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.
Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.
Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...
Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.
Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.
Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.
Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...
posted on 7 Dec 2021
I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.
posted on 10 Nov 2021
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
based on 14 reviews
Rating in categories
Senior Engineer
133
salaries
| ₹4.2 L/yr - ₹11.1 L/yr |
Assistant Manager
126
salaries
| ₹5.2 L/yr - ₹15.5 L/yr |
Structural Engineer
94
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Site Engineer
91
salaries
| ₹3 L/yr - ₹7 L/yr |
Deputy Manager
83
salaries
| ₹7 L/yr - ₹18.5 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure