Cost to complete refers to the estimated amount of money required to finish a project or task.
Cost to complete is an important metric used in project management and quantity surveying.
It takes into account the remaining work, resources, and expenses needed to complete a project.
It helps in assessing the financial status of a project and making informed decisions.
Cost to complete can be calculated by subtracting the act...
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
I was interviewed in Aug 2017.
posted on 2 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
posted on 25 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 5 interview rounds.
It was around 5-10 minutes online test.
The percentage of wastage varies depending on the project and materials used.
The percentage of wastage can be calculated by dividing the amount of material wasted by the total amount of material used and multiplying by 100.
Factors that can contribute to wastage include poor planning, inaccurate measurements, and human error.
The percentage of wastage can be reduced through careful planning, accurate measurements, and pr...
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.
Identify the item or activity to be analyzed
Determine the quantity of materials and labor required
Calculate the cost of materials and labor
Add overhead costs and profit margin
Divide the total cost by the quantity to get the unit rate
Compare the rate with market rates to ensure competitiveness
Components to be considered in Rate analysis
Cost of materials
Cost of labor
Cost of equipment
Overhead expenses
Profit margin
Taxes and duties
Transportation costs
Wastage and spoilage
Contingencies
Productivity rates
Market rates
Inflation rates
The documents required to certify the final bill as a Quantity Surveyor.
Contract documents
Measurement records
Variation orders
Payment certificates
Final account statement
As-built drawings
Completion certificates
Test reports
Subcontractor invoices
Material invoices
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Simple game style interview
I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.
based on 10 reviews
Rating in categories
Field Engineer
264
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Civil Engineer
65
salaries
| ₹2.1 L/yr - ₹9 L/yr |
Assistant Resident Engineer
46
salaries
| ₹4.4 L/yr - ₹12.2 L/yr |
Resident Engineer
41
salaries
| ₹4.5 L/yr - ₹18.4 L/yr |
Deputy General Manager
40
salaries
| ₹12 L/yr - ₹28 L/yr |
AECOM
Jacobs Engineering Group
WSP
TCE