Upload Button Icon Add office photos

Filter interviews by

L&T Energy Hydrocarbon Senior Quantity Surveyor Interview Questions and Answers

Updated 2 Dec 2021

L&T Energy Hydrocarbon Senior Quantity Surveyor Interview Experiences

1 interview found

I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All questions about my previous job experience & present knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - just share your knowledge what you learn from your previous experience. if it is coincide with their requirement, U r the one what they expect from....

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Related about to quantity and IS codes.
  • Q2. According to IS code and as per site execution knowledge I answered.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't take tension at the time of interview. And if you don't know that you clearly describe that what youu know and what you don't.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Is code for mode of measurement, Types of joints in flooring, What type of projects previously done and how estimation prepared
  • Ans. 

    The question asks about the code for mode of measurement, types of joints in flooring, and previous projects and estimation preparation.

    • The code for mode of measurement refers to the standard method used to measure quantities in construction projects.

    • Types of joints in flooring include butt joints, tongue and groove joints, and expansion joints.

    • Previous projects can include residential buildings, commercial complexes, ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. How many years of experience do you have as a Quantity Surveyor?
  • Q2. What is the Current CTC & Expected CTC?
  • Ans. 

    Current CTC is $60,000 and Expected CTC is $70,000.

    • Current CTC is the current annual salary of the candidate.

    • Expected CTC is the annual salary the candidate is expecting from the new job.

    • It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.

    • For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.

  • Answered by AI
  • Q3. How much is the notice period in present company?
  • Q4. What is your family background?
  • Q5. Why you are planning to relocate?
  • Q6. Did you apply for any job previously with Aarvee Associates?
Round 3 - Technical 

(6 Questions)

  • Q1. Brief about yourself?
  • Q2. Do you involve in doing Cost Estimations and what type of Estimates you prepared?
  • Ans. 

    Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.

    • I prepare detailed estimates based on quantities of materials and labor required for a project.

    • I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.

    • I use software tools...

  • Answered by AI
  • Q3. How do you verify the bill which is submitted by the Contractor/Concessionaire?
  • Ans. 

    Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.

    • Check quantities mentioned in the bill against the actual work done on site.

    • Verify rates and unit prices for each item in the bill with the contract agreement.

    • Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.

    • Conduct site measurements to confirm the work completed matches the

  • Answered by AI
  • Q4. What are the evidential documents required to scrutiny the RA Bill?
  • Ans. 

    Evidential documents required for scrutinizing the RA Bill

    • Contract documents

    • Measurement sheets

    • Bills of quantities

    • Variation orders

    • Payment certificates

  • Answered by AI
  • Q5. How do you justify the change of scope works which are to be recommended to the authority?
  • Ans. 

    Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.

    • Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.

    • Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...

  • Answered by AI
  • Q6. What are the basic inputs for preparing the Bill of Quantities?
  • Ans. 

    Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.

    • Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.

    • Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.

    • Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Quantity Surveyor interview:
  • Bill of Quantities
  • Schedules in Contract Agreement
  • Rate Analysis methods
  • Bill Procedures
Interview preparation tips for other job seekers - Required minimum 5 years of experience as a Quantity Surveyor in a relevant field, then you will easily crack the interview.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What are the projects handled in past?
  • Q2. Role of Quantity surveyor in Road projects?
  • Ans. 

    Quantity surveyors play a crucial role in road projects by estimating costs, managing budgets, and ensuring project efficiency.

    • Estimating costs for materials, labor, and equipment

    • Preparing tender documents and contracts

    • Managing project budgets and costs

    • Conducting cost analysis and value engineering

    • Ensuring compliance with regulations and specifications

    • Providing financial advice and risk management

    • Collaborating with eng...

  • Answered by AI
  • Q3. What is the process of billing?
  • Ans. 

    Billing is the process of creating and sending invoices to clients for services or products provided.

    • Prepare detailed breakdown of costs incurred

    • Calculate quantities and rates for each item

    • Include any additional charges or discounts

    • Generate invoice and send to client for payment

    • Track payments and follow up on overdue invoices

  • Answered by AI
  • Q4. Required inputs for Cost Estimations?
  • Ans. 

    Inputs for Cost Estimations include project scope, materials, labor costs, equipment costs, overhead costs, and profit margin.

    • Project scope: Detailed understanding of the project requirements and deliverables.

    • Materials: Cost of all materials required for the project.

    • Labor costs: Cost of labor required to complete the project.

    • Equipment costs: Cost of any equipment or machinery needed for the project.

    • Overhead costs: Addi...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What is your family background?
  • Q2. How many dependents are in your family?

Interview Preparation Tips

Interview preparation tips for other job seekers - Need not to worry about interview cracking, need to have knowledge of your role which you are handling.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. IS code for BBS
  • Ans. 

    IS code for BBS is IS 1786:2008

    • IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement

    • BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction

    • Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects

  • Answered by AI
  • Q2. Previous project scope and type of project
  • Q3. Tell about previous project scope and rate type of project etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Learnt about IS code for RCC,Prestress concrete and steel

I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Regarding Billing,rate analysis & estimate

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident,when you face the interview.

I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Related about to quantity and IS codes.
  • Q2. According to IS code and as per site execution knowledge I answered.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't take tension at the time of interview. And if you don't know that you clearly describe that what youu know and what you don't.

I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What is cost to complete
  • Ans. 

    Cost to complete refers to the estimated amount of money required to finish a project or task.

    • Cost to complete is an important metric used in project management and quantity surveying.

    • It takes into account the remaining work, resources, and expenses needed to complete a project.

    • It helps in assessing the financial status of a project and making informed decisions.

    • Cost to complete can be calculated by subtracting the act...

  • Answered by AI
  • Q2. Unit weight of various steel bars
  • Ans. 

    Unit weight of steel bars varies based on their diameter and length.

    • The weight of steel bars is measured in kilograms per meter (kg/m).

    • The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.

    • For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your technical knowledge and basic strong and be confident

I applied via Referral and was interviewed before May 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. How to do Rate analysis ?
  • Ans. 

    Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.

    • Identify the item or activity to be analyzed

    • Determine the quantity of materials and labor required

    • Calculate the cost of materials and labor

    • Add overhead costs and profit margin

    • Divide the total cost by the quantity to get the unit rate

    • Compare the rate with market rates to ensure competitiveness

  • Answered by AI
  • Q2. What are the components to be considered in the Rate analysis?
  • Ans. 

    Components to be considered in Rate analysis

    • Cost of materials

    • Cost of labor

    • Cost of equipment

    • Overhead expenses

    • Profit margin

    • Taxes and duties

    • Transportation costs

    • Wastage and spoilage

    • Contingencies

    • Productivity rates

    • Market rates

    • Inflation rates

  • Answered by AI
  • Q3. Documents required to certify Final bill
  • Ans. 

    The documents required to certify the final bill as a Quantity Surveyor.

    • Contract documents

    • Measurement records

    • Variation orders

    • Payment certificates

    • Final account statement

    • As-built drawings

    • Completion certificates

    • Test reports

    • Subcontractor invoices

    • Material invoices

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Both Technical & Contract knowledge is required. Prepare for the same.

Tell us how to improve this page.

Interview Questions from Similar Companies

Apco Infratech Interview Questions
3.8
 • 111 Interviews
AECOM Interview Questions
4.3
 • 110 Interviews
BHEL Interview Questions
4.1
 • 106 Interviews
GAIL Interview Questions
4.5
 • 78 Interviews
TechnipFMC Interview Questions
4.0
 • 68 Interviews
Bechtel Interview Questions
4.0
 • 65 Interviews
View all
L&T Energy Hydrocarbon Senior Quantity Surveyor Salary
based on 5 salaries
₹7 L/yr - ₹9.2 L/yr
26% less than the average Senior Quantity Surveyor Salary in India
View more details
Assistant Manager
837 salaries
unlock blur

₹4.9 L/yr - ₹19 L/yr

Manager
320 salaries
unlock blur

₹10.2 L/yr - ₹30 L/yr

Senior Engineer
231 salaries
unlock blur

₹4.3 L/yr - ₹11 L/yr

Piping Engineer
135 salaries
unlock blur

₹2.5 L/yr - ₹11 L/yr

Assistant General Manager
131 salaries
unlock blur

₹17 L/yr - ₹36 L/yr

Explore more salaries
Compare L&T Energy Hydrocarbon with

TechnipFMC

4.0
Compare

McDermott International

4.2
Compare

Saipem

4.1
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview