I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
There are two main types of survey: land survey and construction survey.
Land survey involves measuring and mapping the land's surface features, boundaries, and elevation.
Construction survey is done to layout and establish reference points and markers for construction projects.
Other types of surveys include topographic survey, boundary survey, and control survey.
Drawings are visual representations of construction plans and designs.
Drawings are typically created using computer-aided design (CAD) software.
They include detailed information about dimensions, materials, and specifications.
Drawings are used by engineers, architects, and construction workers to understand and implement the design.
Examples of drawings include site plans, floor plans, elevations, and sections.
Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.
Bar bending schedule is prepared based on structural drawings provided by the design engineer.
It includes details such as bar mark, bar diameter, cutting length, shape codes, and bending dimensions.
The purpose of a bar bending schedule is to ensure accurate fabrication and placement of rei...
There are three main types of views in civil engineering: plan view, elevation view, and section view.
Plan view shows the layout of a structure from above, typically looking down on the ground floor.
Elevation view shows the vertical appearance of a structure, typically from the front, side, or rear.
Section view shows a cutaway view of a structure, revealing internal details and construction.
Top trending discussions
posted on 1 Oct 2024
I applied via Campus Placement
Overlap refers to the area where two or more elements share common space or features.
Overlap occurs when two or more elements occupy the same physical space or have common characteristics.
In civil engineering, overlap can refer to the area where two construction elements meet, such as overlapping rebar in a concrete structure.
Overlap can also occur in surveying when two survey lines intersect or overlap each other.
Prop...
Overlapping in civil engineering is done to ensure proper continuity and strength in construction.
Overlapping is done to ensure continuity of reinforcement bars in concrete structures.
It helps in distributing the load evenly and prevents sudden failure.
Overlapping also helps in providing the required strength to the structure.
Proper overlapping ensures that the structure can withstand various stresses and forces.
For ex...
posted on 12 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
SOLAR ENERGY RELETED CIVIL CONSTRUCTION DISCUSSION
Solar system refers to the collection of planets and other objects that orbit around a star, typically referring to our own solar system with the Sun at its center.
The solar system consists of the Sun, eight planets, moons, asteroids, comets, and other celestial bodies.
The planets in our solar system are Mercury, Venus, Earth, Mars, Jupiter, Saturn, Uranus, and Neptune.
The Sun is the central star of our solar system, p...
posted on 3 Nov 2023
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
Online exam 50 marks in VC.
I applied via Company Website and was interviewed in Oct 2022. There were 3 interview rounds.
IS code for concrete cube casting is IS 516:1959
IS 516:1959 is the code for methods of tests for strength of concrete
It specifies the procedure for making and curing concrete test specimens
The standard size of the cube for casting is 150mm x 150mm x 150mm
The cubes are casted in three layers and each layer is compacted 25 times using a standard tamping rod
posted on 1 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.
M30 concrete is a type of high-strength concrete with a compressive strength of 30 MPa.
M30 concrete is commonly used in construction projects that require high strength and durability.
It is made by mixing cement, sand, and coarse aggregates in a specific ratio.
The ratio of cement, sand, and aggregates in M30 concrete is 1:1:2.
M30 concrete is suitable for building structures like bridges, dams, and high-rise buildings.
I...
The rebar grade should be selected based on the design requirements and the structural load capacity.
The rebar grade is determined by the design engineer based on the structural requirements.
The grade of rebar is usually specified in the structural drawings and specifications.
The most commonly used rebar grades are 40, 60, and 75.
The higher the grade of rebar, the stronger it is and the more load it can bear.
The rebar ...
posted on 21 Aug 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
posted on 3 May 2019
I applied via Referral
posted on 2 May 2023
About personality, work schedule, team work, Kick of work, progress achieving goals.
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Mix design is the process of determining the proportions of ingredients to be used in concrete or asphalt.
Mix design ensures the desired strength and durability of the construction material.
It takes into account factors such as the type of aggregate, cement, water, and admixtures.
Mix design is used in various construction projects such as buildings, roads, bridges, and dams.
For example, a mix design for a high-rise bui...
Batching plant test of concrete is a process to ensure the quality of concrete before it is used in construction.
Batching plant test involves checking the strength, workability, and consistency of concrete.
Tests are conducted on samples of concrete taken from the batching plant.
Tests include slump test, compressive strength test, and water-cement ratio test.
Results of the tests are compared with the specifications to e...
based on 2 reviews
Rating in categories
Civil Site Engineer
8
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Site Engineer
6
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Supervisor
6
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Civil Engineer
6
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Project Manager
4
salaries
| ₹3.3 L/yr - ₹9 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies