Filter interviews by
I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
There are two main types of survey: land survey and construction survey.
Land survey involves measuring and mapping the land's surface features, boundaries, and elevation.
Construction survey is done to layout and establish reference points and markers for construction projects.
Other types of surveys include topographic survey, boundary survey, and control survey.
Drawings are visual representations of construction plans and designs.
Drawings are typically created using computer-aided design (CAD) software.
They include detailed information about dimensions, materials, and specifications.
Drawings are used by engineers, architects, and construction workers to understand and implement the design.
Examples of drawings include site plans, floor plans, elevations, and sections.
Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.
Bar bending schedule is prepared based on structural drawings provided by the design engineer.
It includes details such as bar mark, bar diameter, cutting length, shape codes, and bending dimensions.
The purpose of a bar bending schedule is to ensure accurate fabrication and placement of rei...
There are three main types of views in civil engineering: plan view, elevation view, and section view.
Plan view shows the layout of a structure from above, typically looking down on the ground floor.
Elevation view shows the vertical appearance of a structure, typically from the front, side, or rear.
Section view shows a cutaway view of a structure, revealing internal details and construction.
I was interviewed before Feb 2024.
Good work construction ms office acel
Top trending discussions
posted on 14 Jul 2017
I was interviewed before Jul 2016.
I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.
Total 3 rounds of interview were conducted
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
The process of making a minor bridge involves planning, design, construction, and inspection.
1. Planning phase involves determining the location, size, and type of bridge needed.
2. Design phase includes creating detailed drawings and calculations for the bridge structure.
3. Construction phase involves building the foundation, supports, and deck of the bridge.
4. Inspection phase ensures the bridge meets safety and quali...
Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.
Conduct soil investigation to determine soil conditions and suitability for piling.
Select appropriate piling equipment based on soil conditions and project requirements.
Monitor the piling process to ensure proper installation and alignment of piles.
Perform load tests on completed
The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.
Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.
Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
posted on 20 Aug 2021
I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.
posted on 31 Jan 2022
I was interviewed in Jan 2022.
posted on 5 Jan 2023
There are several types of HVAC systems, including central, split, packaged, ductless, and geothermal.
Central HVAC systems use ducts to distribute air throughout a building
Split systems have separate indoor and outdoor units
Packaged systems have all components in one unit
Ductless systems use individual units in each room
Geothermal systems use the earth's temperature to heat and cool a building
HVAC system is designed to control temperature, humidity, and air quality in a building.
HVAC stands for Heating, Ventilation, and Air Conditioning.
It includes components such as air handlers, ductwork, filters, and thermostats.
The system works by circulating air through the building and adjusting temperature and humidity levels.
It also helps to remove pollutants and maintain air quality.
Examples of HVAC systems include...
based on 2 interviews
Interview experience
based on 3 reviews
Rating in categories
Civil Site Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Supervisor
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies