I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
There are two main types of survey: land survey and construction survey.
Land survey involves measuring and mapping the land's surface features, boundaries, and elevation.
Construction survey is done to layout and establish reference points and markers for construction projects.
Other types of surveys include topographic survey, boundary survey, and control survey.
Drawings are visual representations of construction plans and designs.
Drawings are typically created using computer-aided design (CAD) software.
They include detailed information about dimensions, materials, and specifications.
Drawings are used by engineers, architects, and construction workers to understand and implement the design.
Examples of drawings include site plans, floor plans, elevations, and sections.
Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.
Bar bending schedule is prepared based on structural drawings provided by the design engineer.
It includes details such as bar mark, bar diameter, cutting length, shape codes, and bending dimensions.
The purpose of a bar bending schedule is to ensure accurate fabrication and placement of rei...
There are three main types of views in civil engineering: plan view, elevation view, and section view.
Plan view shows the layout of a structure from above, typically looking down on the ground floor.
Elevation view shows the vertical appearance of a structure, typically from the front, side, or rear.
Section view shows a cutaway view of a structure, revealing internal details and construction.
I was interviewed before Feb 2024.
Good work construction ms office acel
I applied via Referral and was interviewed in Nov 2021. There was 1 interview round.
Cutting length of stirrups can be calculated using a formula based on the diameter of the stirrup and the size of the beam or column.
Measure the diameter of the stirrup
Measure the size of the beam or column
Use the formula: Cutting length = 2 x (beam/column size) + 2 x (stirrup diameter) + 2 x 10mm (bending allowance)
Add extra length for overlapping and hooking as per design requirements
UTM stands for Universal Transverse Mercator. It is a coordinate system used to locate positions on the Earth's surface.
UTM divides the Earth into 60 zones, each 6 degrees of longitude wide.
It uses a grid system to assign coordinates to locations on the Earth's surface.
UTM is commonly used in mapping, surveying, and navigation applications.
It is also used by the military for tactical operations and targeting.
UTM coordi...
Top trending discussions
Constitution industry is not a commonly known term. Please provide more context.
Please provide more information or context about the constitution industry.
Without additional information, it is difficult to provide a meaningful answer.
It is possible that the interviewer misspoke or meant to ask about a different industry.
It is important to clarify the question before attempting to answer it.
URC will be the best fit for me because of my skills and experience in HR, which align with URC's values and goals.
My experience in HR will allow me to contribute to URC's HR initiatives
I share URC's commitment to diversity and inclusion
I am excited about the opportunity to work with a global organization
My skills in talent acquisition and employee engagement will be valuable to URC
posted on 17 Jun 2021
BIM application in highway models involves creating a digital representation of the road and its infrastructure.
BIM can be used to design and visualize highway projects
It allows for collaboration between different stakeholders
BIM can help with clash detection and reduce errors in construction
It can also be used for maintenance and asset management
Examples include the use of BIM in the construction of the M25 motorway i
I review/check work of an originator in Civil3D Models by following a systematic approach.
I check for errors and inconsistencies in the model.
I verify that the model adheres to the project standards and specifications.
I ensure that the model is accurate and complete.
I communicate with the originator to clarify any issues or concerns.
I document any changes or revisions made to the model.
I perform a final review before s
Roundabout parameters and values vary based on urban and rural settings.
Urban roundabouts typically have smaller diameters and tighter curves than rural roundabouts.
Rural roundabouts may have larger diameters and wider curves to accommodate larger vehicles.
Speed limits, traffic volume, and pedestrian and cyclist activity also influence roundabout design.
Roundabout parameters may include lane widths, splitter island wid...
ARCADY and PICADY software require input such as road geometry, traffic flow, and vehicle characteristics.
Road geometry data such as lane widths, radii, and gradients
Traffic flow data such as traffic volume, speed, and composition
Vehicle characteristics such as dimensions, speed, and acceleration
Other inputs such as signal timings and pedestrian crossings
I am proficient in Civil3D and have extensive experience in using it for designing and drafting civil engineering projects.
Expertise in creating and editing surfaces, alignments, profiles, and corridors
Ability to generate 3D models and perform earthwork calculations
Experience in creating plan and profile sheets, cross-sections, and quantity takeoffs
Familiarity with Civil3D add-ons such as AutoTURN and Hydraflow
Proficie...
posted on 24 Jul 2021
A line chart for a 10 km action plan with safety precautions, procurement, manpower, and equipment.
Identify safety precautions needed for the project
Procure necessary equipment and manpower
Create a timeline for the project
Allocate resources efficiently
Ensure compliance with regulations and standards
Monitor progress and adjust plan as needed
To calculate pup-piece length for a 12 inch pipeline with two sections already lowered and overlap 5m and s-bend rolling, two 90 degree LR bends.
Calculate the total length of the pipeline
Subtract the length of the two sections already lowered and overlap 5m
Add the length of the two 90 degree LR bends
Divide the result by 2 to get the length of each pup-piece
Collapse and damage percentage for HDD crossings are calculated based on various factors such as soil type, borehole diameter, and drilling fluid properties.
Collapse percentage is calculated using the Mohr-Coulomb failure criterion
Damage percentage is calculated based on the tensile strength of the pipe and the bending stress induced during the pullback process
Factors such as soil type, borehole diameter, and drilling ...
Methodology for rock excavation involves drilling, blasting, and removal of debris. Quantity is measured by volume or weight.
Drilling holes in rock using specialized equipment
Placing explosives in the holes and detonating them
Removing the debris using heavy machinery
Measuring the quantity of rock excavated by volume or weight
Using software to calculate the amount of explosives needed for a specific excavation project
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
IS codes used for DI & HDPE pipe line, procedure for laying and jointing, and type tests conducted.
IS 8329:2000 for HDPE pipes
IS 8327:2000 for DI pipes
DI pipes are laid using trenchless technology like HDD
HDPE pipes are laid using open trench method
Jointing for DI pipes is done using push-on joint or mechanical joint
Jointing for HDPE pipes is done using butt fusion or electrofusion
Type tests conducted include hydrostat...
There are various tests conducted in concrete including compressive strength, flexural strength, and water absorption.
Compressive strength test is conducted to determine the strength of concrete under compression. IS code for this test is IS 516.
Flexural strength test is conducted to determine the strength of concrete under bending. IS code for this test is IS 516.
Water absorption test is conducted to determine the amo...
posted on 9 Sep 2020
I have extensive experience in commissioning activities in the Oil&Gas field.
I have worked on multiple commissioning projects in the Oil&Gas industry.
I have a deep understanding of the commissioning process and its importance in ensuring safe and efficient operations.
I have successfully led commissioning teams and coordinated activities to ensure timely completion.
I have experience in troubleshooting and resolving comm...
Completion system is a process that ensures all components of a project are fully functional and ready for operation.
Completion system involves testing and verifying all equipment, systems, and processes.
It includes conducting inspections, functional tests, and performance tests.
Documentation and certification of completion are important aspects of the process.
Examples of completion systems include commissioning a powe...
The system is handed over to the client through a structured process of testing, documentation, and training.
The system is thoroughly tested to ensure it meets all requirements and specifications
Documentation is provided to the client, including user manuals and technical specifications
Training is provided to the client's staff to ensure they can effectively use and maintain the system
A formal acceptance process is con...
based on 3 interviews
Interview experience
based on 26 reviews
Rating in categories
Civil Site Engineer
10
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Site Engineer
6
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Supervisor
6
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Civil Engineer
6
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Project Manager
4
salaries
| ₹3.3 L/yr - ₹9 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies