Q1. How many types of survey
There are two main types of survey: land survey and construction survey.
Land survey involves measuring and mapping the land's surface features, boundaries, and elevation.
Construction survey is done to layout and establish reference points and markers for construction projects.
Other types of surveys include topographic survey, boundary survey, and control survey.
Q2. How do we see drawings
Drawings are visual representations of construction plans and designs.
Drawings are typically created using computer-aided design (CAD) software.
They include detailed information about dimensions, materials, and specifications.
Drawings are used by engineers, architects, and construction workers to understand and implement the design.
Examples of drawings include site plans, floor plans, elevations, and sections.
Q3. What is bar bending shedule
Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.
Bar bending schedule is prepared based on structural drawings provided by the design engineer.
It includes details such as bar mark, bar diameter, cutting length, shape codes, and bending dimensions.
The purpose of a bar bending schedule is to ensure accurate fabrication and placement of reinforcement bars in concrete structures.
It helps in minimiz...read more
Q4. How many types of view
There are three main types of views in civil engineering: plan view, elevation view, and section view.
Plan view shows the layout of a structure from above, typically looking down on the ground floor.
Elevation view shows the vertical appearance of a structure, typically from the front, side, or rear.
Section view shows a cutaway view of a structure, revealing internal details and construction.
Q5. How to calculate Cutting length of stirrups
Cutting length of stirrups can be calculated using a formula based on the diameter of the stirrup and the size of the beam or column.
Measure the diameter of the stirrup
Measure the size of the beam or column
Use the formula: Cutting length = 2 x (beam/column size) + 2 x (stirrup diameter) + 2 x 10mm (bending allowance)
Add extra length for overlapping and hooking as per design requirements
Q6. What is UTM? Why it is use
UTM stands for Universal Transverse Mercator. It is a coordinate system used to locate positions on the Earth's surface.
UTM divides the Earth into 60 zones, each 6 degrees of longitude wide.
It uses a grid system to assign coordinates to locations on the Earth's surface.
UTM is commonly used in mapping, surveying, and navigation applications.
It is also used by the military for tactical operations and targeting.
UTM coordinates are expressed in meters, making it easy to calculate...read more