I applied via Referral and was interviewed in Nov 2021. There was 1 interview round.
Cutting length of stirrups can be calculated using a formula based on the diameter of the stirrup and the size of the beam or column.
Measure the diameter of the stirrup
Measure the size of the beam or column
Use the formula: Cutting length = 2 x (beam/column size) + 2 x (stirrup diameter) + 2 x 10mm (bending allowance)
Add extra length for overlapping and hooking as per design requirements
UTM stands for Universal Transverse Mercator. It is a coordinate system used to locate positions on the Earth's surface.
UTM divides the Earth into 60 zones, each 6 degrees of longitude wide.
It uses a grid system to assign coordinates to locations on the Earth's surface.
UTM is commonly used in mapping, surveying, and navigation applications.
It is also used by the military for tactical operations and targeting.
UTM coordi...
I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
There are two main types of survey: land survey and construction survey.
Land survey involves measuring and mapping the land's surface features, boundaries, and elevation.
Construction survey is done to layout and establish reference points and markers for construction projects.
Other types of surveys include topographic survey, boundary survey, and control survey.
Drawings are visual representations of construction plans and designs.
Drawings are typically created using computer-aided design (CAD) software.
They include detailed information about dimensions, materials, and specifications.
Drawings are used by engineers, architects, and construction workers to understand and implement the design.
Examples of drawings include site plans, floor plans, elevations, and sections.
Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.
Bar bending schedule is prepared based on structural drawings provided by the design engineer.
It includes details such as bar mark, bar diameter, cutting length, shape codes, and bending dimensions.
The purpose of a bar bending schedule is to ensure accurate fabrication and placement of rei...
There are three main types of views in civil engineering: plan view, elevation view, and section view.
Plan view shows the layout of a structure from above, typically looking down on the ground floor.
Elevation view shows the vertical appearance of a structure, typically from the front, side, or rear.
Section view shows a cutaway view of a structure, revealing internal details and construction.
I appeared for an interview before Feb 2024.
Good work construction ms office acel
Top trending discussions
posted on 19 Jul 2021
A site engineer is responsible for overseeing construction projects and ensuring they are completed according to plans and specifications. A supervisor is a higher-level position that manages and coordinates the work of site engineers and other construction personnel.
Site engineer: responsible for overseeing construction projects, ensuring compliance with plans and specifications
Supervisor: higher-level position that m...
posted on 27 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 17 Nov 2022
I applied via Job Fair and was interviewed before Nov 2021. There was 1 interview round.
A WTP flow diagram shows the process of water treatment and purification.
The flow diagram typically includes structures such as screens, sedimentation tanks, filters, and disinfection units.
Screens remove large debris and particles from the water.
Sedimentation tanks allow suspended particles to settle to the bottom.
Filters remove smaller particles and impurities.
Disinfection units use chemicals or UV light to kill bact...
posted on 28 Jan 2025
I appeared for an interview before Jan 2024.
A site engineer is responsible for overseeing construction projects, ensuring they are completed on time, within budget, and meet quality standards.
Responsible for planning, coordinating, and supervising construction projects
Ensure projects are completed on time and within budget
Monitor quality standards and compliance with regulations
Collaborate with architects, contractors, and other stakeholders
Resolve any issues or...
Re-block is the process of dividing a large land parcel into smaller blocks, while palnes are the boundaries of these smaller blocks.
Re-block involves dividing a large land parcel into smaller blocks for development purposes.
Palnes are the boundaries that separate these smaller blocks.
Re-block is a planning and zoning term used in urban development.
Palnes help define property lines and ownership within the divided land
posted on 7 May 2024
Cement is a binding agent used in construction, while concrete is a mixture of cement, water, aggregates, and sometimes additives.
Cement is a fine powder made from limestone, clay, and other minerals.
Concrete is a composite material made by mixing cement, water, aggregates (such as sand or gravel), and sometimes additives like fly ash or fibers.
Cement is used to bind materials together in construction, while concrete i...
posted on 13 Jun 2024
I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes used in construction.
BBS is essential for ensuring the correct quantity and placement of reinforcement bars in concrete structures.
It helps in estimating the required amount of steel reinforcement accurately.
BBS also aids in reducing wastage of materials and labor costs.
It is crucial for maintaining the str...
To calculate the quantity of cement, sand, and aggregate for 1 cu.m concrete, you need to know the mix ratio and bulk density of materials.
Determine the mix ratio of concrete (e.g. 1:2:4 for cement:sand:aggregate)
Calculate the volume of concrete required (1 cu.m in this case)
Calculate the quantity of cement, sand, and aggregate using the mix ratio and bulk density of materials
For example, if the mix ratio is 1:2:4 and ...
posted on 16 Sep 2022
based on 3 interviews
Interview experience
based on 26 reviews
Rating in categories
Civil Site Engineer
12
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Site Engineer
7
salaries
| ₹1.2 L/yr - ₹6 L/yr |
Supervisor
6
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Civil Engineer
6
salaries
| ₹2 L/yr - ₹3 L/yr |
Project Manager
4
salaries
| ₹3.3 L/yr - ₹9 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies