I applied via Referral and was interviewed in Nov 2021. There was 1 interview round.
Cutting length of stirrups can be calculated using a formula based on the diameter of the stirrup and the size of the beam or column.
Measure the diameter of the stirrup
Measure the size of the beam or column
Use the formula: Cutting length = 2 x (beam/column size) + 2 x (stirrup diameter) + 2 x 10mm (bending allowance)
Add extra length for overlapping and hooking as per design requirements
UTM stands for Universal Transverse Mercator. It is a coordinate system used to locate positions on the Earth's surface.
UTM divides the Earth into 60 zones, each 6 degrees of longitude wide.
It uses a grid system to assign coordinates to locations on the Earth's surface.
UTM is commonly used in mapping, surveying, and navigation applications.
It is also used by the military for tactical operations and targeting.
UTM coordi...
I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
There are two main types of survey: land survey and construction survey.
Land survey involves measuring and mapping the land's surface features, boundaries, and elevation.
Construction survey is done to layout and establish reference points and markers for construction projects.
Other types of surveys include topographic survey, boundary survey, and control survey.
Drawings are visual representations of construction plans and designs.
Drawings are typically created using computer-aided design (CAD) software.
They include detailed information about dimensions, materials, and specifications.
Drawings are used by engineers, architects, and construction workers to understand and implement the design.
Examples of drawings include site plans, floor plans, elevations, and sections.
Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.
Bar bending schedule is prepared based on structural drawings provided by the design engineer.
It includes details such as bar mark, bar diameter, cutting length, shape codes, and bending dimensions.
The purpose of a bar bending schedule is to ensure accurate fabrication and placement of rei...
There are three main types of views in civil engineering: plan view, elevation view, and section view.
Plan view shows the layout of a structure from above, typically looking down on the ground floor.
Elevation view shows the vertical appearance of a structure, typically from the front, side, or rear.
Section view shows a cutaway view of a structure, revealing internal details and construction.
I was interviewed before Feb 2024.
Good work construction ms office acel
I applied via Company Website and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 27 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 9 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.
To check waterproofing area, follow these procedures
Inspect the surface for cracks or gaps
Ensure proper slope for drainage
Apply primer before waterproofing
Use appropriate waterproofing material
Check for leaks after application
Perform regular maintenance
Examples: bituminous coating, polyurethane coating, cementitious coating
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Mix design is the process of determining the proportions of ingredients to be used in concrete or asphalt.
Mix design ensures the desired strength and durability of the construction material.
It takes into account factors such as the type of aggregate, cement, water, and admixtures.
Mix design is used in various construction projects such as buildings, roads, bridges, and dams.
For example, a mix design for a high-rise bui...
Batching plant test of concrete is a process to ensure the quality of concrete before it is used in construction.
Batching plant test involves checking the strength, workability, and consistency of concrete.
Tests are conducted on samples of concrete taken from the batching plant.
Tests include slump test, compressive strength test, and water-cement ratio test.
Results of the tests are compared with the specifications to e...
I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.
posted on 20 Feb 2024
I applied via Walk-in
based on 3 interviews
Interview experience
based on 26 reviews
Rating in categories
Civil Site Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Supervisor
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies