Upload Button Icon Add office photos

Filter interviews by

AK Constructions Interview Questions, Process, and Tips

Updated 11 Feb 2025

Top AK Constructions Interview Questions and Answers

View all 6 questions

AK Constructions Interview Experiences

Popular Designations

3 interviews found

Supervisor Interview Questions & Answers

user image Anonymous

posted on 5 May 2022

I applied via Referral and was interviewed in Nov 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How to calculate Cutting length of stirrups
  • Ans. 

    Cutting length of stirrups can be calculated using a formula based on the diameter of the stirrup and the size of the beam or column.

    • Measure the diameter of the stirrup

    • Measure the size of the beam or column

    • Use the formula: Cutting length = 2 x (beam/column size) + 2 x (stirrup diameter) + 2 x 10mm (bending allowance)

    • Add extra length for overlapping and hooking as per design requirements

  • Answered by AI
  • Q2. What is UTM? Why it is use
  • Ans. 

    UTM stands for Universal Transverse Mercator. It is a coordinate system used to locate positions on the Earth's surface.

    • UTM divides the Earth into 60 zones, each 6 degrees of longitude wide.

    • It uses a grid system to assign coordinates to locations on the Earth's surface.

    • UTM is commonly used in mapping, surveying, and navigation applications.

    • It is also used by the military for tactical operations and targeting.

    • UTM coordi...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for AK Constructions Supervisor interview:
  • AutoCAD
Interview preparation tips for other job seekers - Be confident and sincere. Ask for learning opportunity.

Supervisor Interview Questions asked at other Companies

Q1. Self introduction? & what is mean by eCommerce ? How it can do
View answer (10)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. How many types of survey
  • Ans. 

    There are two main types of survey: land survey and construction survey.

    • Land survey involves measuring and mapping the land's surface features, boundaries, and elevation.

    • Construction survey is done to layout and establish reference points and markers for construction projects.

    • Other types of surveys include topographic survey, boundary survey, and control survey.

  • Answered by AI
  • Q2. How do we see drawings
  • Ans. 

    Drawings are visual representations of construction plans and designs.

    • Drawings are typically created using computer-aided design (CAD) software.

    • They include detailed information about dimensions, materials, and specifications.

    • Drawings are used by engineers, architects, and construction workers to understand and implement the design.

    • Examples of drawings include site plans, floor plans, elevations, and sections.

  • Answered by AI
  • Q3. What is bar bending shedule
  • Ans. 

    Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.

    • Bar bending schedule is prepared based on structural drawings provided by the design engineer.

    • It includes details such as bar mark, bar diameter, cutting length, shape codes, and bending dimensions.

    • The purpose of a bar bending schedule is to ensure accurate fabrication and placement of rei...

  • Answered by AI
  • Q4. How many types of view
  • Ans. 

    There are three main types of views in civil engineering: plan view, elevation view, and section view.

    • Plan view shows the layout of a structure from above, typically looking down on the ground floor.

    • Elevation view shows the vertical appearance of a structure, typically from the front, side, or rear.

    • Section view shows a cutaway view of a structure, revealing internal details and construction.

  • Answered by AI
  • Q5. Gradesofconcrete

Interview Preparation Tips

Interview preparation tips for other job seekers - First you should check the policy of your company

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (66)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Aptitude Test 

Good work construction ms office acel

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (66)

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. What is site engineer and supervisor
  • Ans. 

    A site engineer is responsible for overseeing construction projects and ensuring they are completed according to plans and specifications. A supervisor is a higher-level position that manages and coordinates the work of site engineers and other construction personnel.

    • Site engineer: responsible for overseeing construction projects, ensuring compliance with plans and specifications

    • Supervisor: higher-level position that m...

  • Answered by AI

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Where do you see yourself in 5 years?
Round 2 - Technical 

(1 Question)

  • Q1. Water supply project rwss and EPC industry project

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I'm civil engineer with water supply project and EPC industry project presently working gvpr engineer LTD my experience 8years

I applied via Job Fair and was interviewed before Nov 2021. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. WTP flow diagram and explain each and every structure functions
  • Ans. 

    A WTP flow diagram shows the process of water treatment and purification.

    • The flow diagram typically includes structures such as screens, sedimentation tanks, filters, and disinfection units.

    • Screens remove large debris and particles from the water.

    • Sedimentation tanks allow suspended particles to settle to the bottom.

    • Filters remove smaller particles and impurities.

    • Disinfection units use chemicals or UV light to kill bact...

  • Answered by AI
  • Q2. What is the reason to change the company
  • Q3. Asked about Design mix details
  • Q4. Why will we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company.. support is depending on site incharge
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jan 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is the site engineer
  • Ans. 

    A site engineer is responsible for overseeing construction projects, ensuring they are completed on time, within budget, and meet quality standards.

    • Responsible for planning, coordinating, and supervising construction projects

    • Ensure projects are completed on time and within budget

    • Monitor quality standards and compliance with regulations

    • Collaborate with architects, contractors, and other stakeholders

    • Resolve any issues or...

  • Answered by AI
  • Q2. Difference between Re-block and palnes
  • Ans. 

    Re-block is the process of dividing a large land parcel into smaller blocks, while palnes are the boundaries of these smaller blocks.

    • Re-block involves dividing a large land parcel into smaller blocks for development purposes.

    • Palnes are the boundaries that separate these smaller blocks.

    • Re-block is a planning and zoning term used in urban development.

    • Palnes help define property lines and ownership within the divided land

  • Answered by AI
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Difference between the cement and concrete
  • Ans. 

    Cement is a binding agent used in construction, while concrete is a mixture of cement, water, aggregates, and sometimes additives.

    • Cement is a fine powder made from limestone, clay, and other minerals.

    • Concrete is a composite material made by mixing cement, water, aggregates (such as sand or gravel), and sometimes additives like fly ash or fibers.

    • Cement is used to bind materials together in construction, while concrete i...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is bbs and uses
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes used in construction.

    • BBS is essential for ensuring the correct quantity and placement of reinforcement bars in concrete structures.

    • It helps in estimating the required amount of steel reinforcement accurately.

    • BBS also aids in reducing wastage of materials and labor costs.

    • It is crucial for maintaining the str...

  • Answered by AI
  • Q2. How to calculate qty of cement sand and aggregate for 1 cu.m concrete
  • Ans. 

    To calculate the quantity of cement, sand, and aggregate for 1 cu.m concrete, you need to know the mix ratio and bulk density of materials.

    • Determine the mix ratio of concrete (e.g. 1:2:4 for cement:sand:aggregate)

    • Calculate the volume of concrete required (1 cu.m in this case)

    • Calculate the quantity of cement, sand, and aggregate using the mix ratio and bulk density of materials

    • For example, if the mix ratio is 1:2:4 and ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic construction materials knowledge is very important
Round 1 - Technical 

(3 Questions)

  • Q1. Civil releted . Structure Archetec (finishing)
  • Q2. Quality releted All types shuttering Good quality On time to time complete target cedule Good understanding with communication team work Quality control with contractor controlling .
  • Q3. Each and every steps I will stand for our work

Interview Preparation Tips

Interview preparation tips for other job seekers - I m Shakil Ahmad I'm from Patna India I m civil Engineer 7 year Experience in High rise building construction, Residential and commercial WTP pipe line shuttering liva peri deo RMDK formwork so I am interested job this company if u can help me then I am very happy .
Mb no :- XXXXX
Shakil Ahmad
Date :- 16/09/2022

AK Constructions Interview FAQs

How many rounds are there in AK Constructions interview?
AK Constructions interview process usually has 1 rounds. The most common rounds in the AK Constructions interview process are Technical and Aptitude Test.
How to prepare for AK Constructions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at AK Constructions. The most common topics and skills that interviewers at AK Constructions expect are Teaching English, Civil Engineering, Construction Management, Site Engineering and Tally ERP.
What are the top questions asked in AK Constructions interview?

Some of the top questions asked at the AK Constructions interview -

  1. How to calculate Cutting length of stirr...read more
  2. What is UTM? Why it is ...read more
  3. How many types of sur...read more

Tell us how to improve this page.

AK Constructions Interview Process

based on 3 interviews

Interview experience

4.7
  
Excellent
View more

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 266 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
AECOM Interview Questions
4.2
 • 119 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all

AK Constructions Reviews and Ratings

based on 26 reviews

4.1/5

Rating in categories

4.0

Skill development

3.7

Work-life balance

3.6

Salary

3.6

Job security

3.8

Company culture

3.5

Promotions

3.6

Work satisfaction

Explore 26 Reviews and Ratings
Civil Site Engineer
12 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Site Engineer
7 salaries
unlock blur

₹1.2 L/yr - ₹6 L/yr

Supervisor
6 salaries
unlock blur

₹1.8 L/yr - ₹3.6 L/yr

Civil Engineer
6 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Project Manager
4 salaries
unlock blur

₹3.3 L/yr - ₹9 L/yr

Explore more salaries
Compare AK Constructions with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview