Filter interviews by
I was interviewed in Jan 2025.
I was interviewed in Jan 2025.
I am a dedicated HR professional with 5 years of experience in recruitment, employee relations, and training.
5 years of experience in HR
Specialize in recruitment, employee relations, and training
Strong communication and interpersonal skills
I applied via LinkedIn and was interviewed in Oct 2024. There were 2 interview rounds.
Sql, nodejs JavaScript
I was interviewed in Jan 2025.
ACC interview questions for popular designations
I highlighted the unique features of our product, demonstrated its superior quality through samples, and offered a competitive price to convince the customer.
Highlighted unique features of our product
Demonstrated superior quality through samples
Offered competitive price
Get interview-ready with Top ACC Interview Questions
I applied via Approached by Company
Cement is a binding material used in construction to hold together bricks, stones, etc. It is prepared by mixing limestone, clay, and other materials.
Cement is made by heating a mixture of limestone and clay in a kiln at high temperatures
The resulting product, called clinker, is then ground into a fine powder and mixed with gypsum to create cement
Water is added to the cement to form a paste, which hardens over time to ...
Types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.
Portland cement is the most common type used in construction.
White cement is used for architectural purposes and to create colored concrete.
Rapid hardening cement sets quickly and is used in projects with tight deadlines.
Low heat cement generates less heat during hydration and is used in large concrete structures.
Cement temperature is an important factor in the production process, affecting setting time and strength of the final product.
Cement temperature should be monitored closely during production to ensure optimal conditions.
Higher temperatures can accelerate the setting time of cement, while lower temperatures can slow it down.
The ideal temperature range for cement production is typically between 90-120 degrees Celsius.
Tem...
Material handling procedure involves the safe and efficient movement of materials within a facility.
Establish clear guidelines for handling different types of materials
Train employees on proper lifting techniques and equipment usage
Implement safety measures such as wearing protective gear and using designated pathways
Regularly inspect equipment and storage areas for potential hazards
Utilize technology like conveyor bel
Proper storage of materials is crucial for maintaining quality and safety standards in engineering operations.
Materials should be stored in designated areas to prevent mix-ups and ensure easy access.
Storage areas should be organized and labeled clearly for quick identification.
Certain materials may require specific storage conditions such as temperature control or protection from moisture.
Regular inventory checks shoul...
Safe unloading tips are crucial for preventing accidents and injuries.
Always wear appropriate personal protective equipment (PPE) such as gloves, safety glasses, and steel-toed boots.
Inspect the unloading area for any hazards such as uneven ground, overhead obstacles, or slippery surfaces.
Use proper lifting techniques to avoid strain or injury - bend at the knees, keep your back straight, and lift with your legs.
Secure...
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.
Emergency handling in power plant involves quick response, proper training, and adherence to safety protocols.
Quickly assess the situation and identify the type of emergency (fire, equipment failure, etc.)
Activate emergency shutdown procedures to prevent further damage
Notify appropriate personnel and emergency services
Evacuate personnel to safe locations and ensure their safety
Follow established safety protocols and pr...
General awareness Current affairs
Top trending discussions
Some of the top questions asked at the ACC interview -
The duration of ACC interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 170 interviews
Interview experience
15-25 Yrs
Not Disclosed
8-13 Yrs
Not Disclosed
Assistant Manager
373
salaries
| ₹4 L/yr - ₹13.8 L/yr |
Manager
201
salaries
| ₹9.9 L/yr - ₹29 L/yr |
Deputy Manager
195
salaries
| ₹6.7 L/yr - ₹19.6 L/yr |
Senior Executive
159
salaries
| ₹2.8 L/yr - ₹9 L/yr |
Sales Executive
124
salaries
| ₹1.2 L/yr - ₹4.9 L/yr |
Ambuja Cements
UltraTech Cement
Shree Cement
The Ramco Cements