I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.
Emergency handling in power plant involves quick response, proper training, and adherence to safety protocols.
Quickly assess the situation and identify the type of emergency (fire, equipment failure, etc.)
Activate emergency shutdown procedures to prevent further damage
Notify appropriate personnel and emergency services
Evacuate personnel to safe locations and ensure their safety
Follow established safety protocols and pr...
General awareness Current affairs
I applied via Approached by Company and was interviewed in Apr 2023. There were 2 interview rounds.
Answering questions related to vacuum, boiler heating surface, and 3 element feed control station.
Vacuum is necessary to remove air and other gases from a system to create a low-pressure environment.
Boiler heating surfaces are the areas of the boiler where heat is transferred from the combustion gases to the water or steam.
3 element feed control station is used to maintain the water level, steam flow, and feed water fl...
T11 is a type of steel material commonly used in the manufacturing of pipes and tubes.
T11 material is a low alloy steel with a composition of 1.25% chromium and 0.5% molybdenum.
It is commonly used in the construction of boilers, heat exchangers, and piping systems.
T11 material has good strength and corrosion resistance properties.
It is also known as ASTM A213 Grade T11 or ASME SA213 Grade T11.
T11 material is often used...
Top trending discussions
posted on 9 Feb 2025
I was interviewed before Feb 2024.
Logistics related discussion like freight ,order processing
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
Logistics involves the management of the flow of goods, information, and resources from the point of origin to the point of consumption.
Logistics includes transportation, warehousing, inventory management, and supply chain management.
It focuses on optimizing processes to ensure efficient and timely delivery of goods.
Examples of logistics activities include route planning for delivery trucks, inventory tracking in wareh...
The logistics department in a production plant is responsible for managing the flow of materials, products, and information throughout the supply chain.
Coordinating transportation of raw materials to the plant
Managing inventory levels to ensure production continuity
Organizing distribution of finished products to customers
Optimizing supply chain efficiency and reducing costs
Handling import/export processes and customs c...
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Apr 2022. There were 3 interview rounds.
I was interviewed before Nov 2022.
Interview group discussion round facing by state head zonal head branch incharge are discussion about cement trade genral discussion about market growth
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
I was interviewed before Jun 2022.
I applied via Newspaper Ad and was interviewed before Aug 2022. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
374
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
232
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
200
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
159
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
128
salaries
| ₹0 L/yr - ₹0 L/yr |
Ambuja Cements
UltraTech Cement
Shree Cement
The Ramco Cements