Upload Button Icon Add office photos

Filter interviews by

Vindhya Telelinks Interview Questions, Process, and Tips for Experienced

Updated 12 Jan 2025

Top Vindhya Telelinks Interview Questions and Answers for Experienced

View all 25 questions

Vindhya Telelinks Interview Experiences for Experienced

Popular Designations

22 interviews found

Engineer Interview Questions & Answers

user image Anonymous

posted on 11 Sep 2021

I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About fiber color coding, OTDR, LSPM, Losses, etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, nothing to worry about. Company is very good

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (5)

Interview Questionnaire 

23 Questions

  • Q1. Bill of material of 1 KM 11 KV line
  • Ans. 

    The bill of material for a 1 KM 11 KV line includes various components such as conductors, insulators, transformers, and poles.

    • Conductors: Copper or aluminum cables used to transmit electricity.

    • Insulators: Materials like porcelain or polymer used to support and isolate the conductors.

    • Transformers: Devices used to step up or step down the voltage.

    • Poles: Structures to support the conductors and maintain their position.

    • Ot...

  • Answered by AI
  • Q2. Bill of material of 1 KM AB cable line
  • Ans. 

    The bill of material for a 1 KM AB cable line includes various components.

    • The cable itself

    • Insulators

    • Connectors

    • Poles or towers

    • Grounding equipment

    • Hardware such as bolts and clamps

    • Tools for installation

    • Safety equipment

    • Transportation costs

    • Labor costs

  • Answered by AI
  • Q3. Bill of material of 1KM underground line 33 KV ,11,KV,LT lines
  • Ans. 

    The bill of material for a 1KM underground line with 33KV, 11KV, and LT lines.

    • The bill of material should include all necessary components for the underground line.

    • Components may include cables, transformers, switchgear, and other electrical equipment.

    • The quantity of each component should be specified in the bill of material.

    • The bill of material should also include any necessary accessories such as clamps, connectors,

  • Answered by AI
  • Q4. Testing commissioning of RMU ,relay setting
  • Ans. 

    Testing and commissioning of RMU and relay setting is a crucial aspect of project engineering.

    • Testing and commissioning of RMU involves verifying the functionality of the switchgear and ensuring it is safe for operation.

    • Relay setting involves configuring the protection relays to ensure they operate correctly in the event of a fault.

    • Testing and commissioning should be carried out in accordance with relevant standards an...

  • Answered by AI
  • Q5. Transformer earthing
  • Q6. What is lightning arrestor
  • Ans. 

    A lightning arrestor is a device used to protect electrical equipment from lightning strikes.

    • It is also known as a surge arrester or lightning diverter.

    • It works by providing a low-impedance path for lightning current to flow to the ground.

    • It is commonly used in power distribution systems, telecommunication networks, and buildings.

    • Examples include metal oxide varistors, gas discharge tubes, and carbon block arrestors.

  • Answered by AI
  • Q7. Soil conductivity test
  • Q8. Transformer testing
  • Q9. ACSR conductor testing ABC testing Pannel testing Structure testing
  • Q10. Earthing Earthing of transformer Earthing of lightning arrester Earthing of sub station Earthing of single pole Earthing of pannels
  • Q11. What is discharge rods
  • Ans. 

    Discharge rods are grounding devices used to discharge static electricity from equipment or machinery.

    • Also known as grounding rods or earthing rods

    • Typically made of copper or aluminum

    • Used in industries such as oil and gas, chemical, and manufacturing

    • Prevents damage to equipment and potential safety hazards

    • Example: Discharge rods are commonly used in refineries to prevent explosions caused by static electricity buildup.

  • Answered by AI
  • Q12. Size of conductors Size of cables
  • Ans. 

    The size of conductors and cables is an important factor in determining their electrical properties and performance.

    • The size of a conductor is determined by its cross-sectional area, which affects its resistance and current-carrying capacity.

    • Cable size is determined by the current it needs to carry and the distance it needs to travel.

    • Larger conductors and cables can carry more current and have lower resistance, but may...

  • Answered by AI
  • Q13. What is GTP What is MQP What is FQP
  • Ans. 

    GTP is a protocol used in cellular communication. MQP and FQP are not commonly used acronyms.

    • GTP stands for GPRS Tunnelling Protocol

    • It is used in cellular communication to allow data transfer between different networks

    • MQP and FQP are not commonly used acronyms and may refer to specific organizations or products

  • Answered by AI
  • Q14. Transformer oil testing
  • Q15. Cable insulation testing Continuity testing High pot test
  • Q16. What is HDD machine
  • Ans. 

    HDD machine is a drilling machine used for horizontal directional drilling.

    • HDD stands for Horizontal Directional Drilling

    • It is used for underground drilling without disturbing the surface

    • It is commonly used for laying pipelines, cables, and conduits

    • The machine uses a drill stem and a drilling fluid to bore through the ground

    • It requires skilled operators and engineers to operate and plan the drilling process

  • Answered by AI
  • Q17. PSC pole STP pole RS joist pole Rail pole
  • Q18. HDPE PIPE GI PIPE PLB duct
  • Q19. Chemical earthing Electrical earthing
  • Q20. Jointing of cables Jointing of conductors
  • Ans. 

    Jointing of cables and conductors is a crucial aspect of project engineering.

    • Jointing involves connecting two or more cables or conductors to ensure continuity of electrical flow.

    • Various methods of jointing include crimping, soldering, and welding.

    • Factors such as the type of cable, voltage, and current capacity must be considered when selecting a jointing method.

    • Proper insulation and sealing of joints is essential to p...

  • Answered by AI
  • Q21. Tell me about yourself
  • Q22. Previous company and project details
  • Q23. Salary discussion

Skills evaluated in this interview

Top Vindhya Telelinks Project Engineer Interview Questions and Answers

Q1. Bill of material of 1KM underground line 33 KV ,11,KV,LT lines
View answer (1)

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star PatternPrint the following pattern for the given N number of rows. Pattern for N = 4 * ** *** **** Note : There are no spaces between the stars (*). Input format : Integer N (Total no. of rows) Output format : Pattern in N l... read more
View answer (9)

Vindhya Telelinks Interview FAQs

How many rounds are there in Vindhya Telelinks interview for experienced candidates?
Vindhya Telelinks interview process for experienced candidates usually has 2-3 rounds. The most common rounds in the Vindhya Telelinks interview process for experienced candidates are HR, Technical and Resume Shortlist.
How to prepare for Vindhya Telelinks interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Vindhya Telelinks. The most common topics and skills that interviewers at Vindhya Telelinks expect are Pipeline, Water Supply, Accounting, Civil Construction and Electrical Power Distribution.
What are the top questions asked in Vindhya Telelinks interview for experienced candidates?

Some of the top questions asked at the Vindhya Telelinks interview for experienced candidates -

  1. Bill of material of 1KM underground line 33 KV ,11,KV,LT lin...read more
  2. Bill of material of 1 KM 11 KV li...read more
  3. What is the bending radius of EHV cabl...read more
How long is the Vindhya Telelinks interview process?

The duration of Vindhya Telelinks interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Vindhya Telelinks Interview Process for Experienced

based on 7 interviews in last 1 year

Interview experience

3.6
  
Good
View more

People are getting interviews through

based on 15 Vindhya Telelinks interviews
WalkIn
Company Website
Referral
60%
7%
7%
26% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

Interview Questions from Similar Companies

Polycab Wires Interview Questions
4.1
 • 90 Interviews
KEI Industries Interview Questions
4.2
 • 52 Interviews
Finolex Cables Interview Questions
3.8
 • 40 Interviews
Apar Industries Interview Questions
4.1
 • 37 Interviews
Aksh Optifibre Interview Questions
3.6
 • 4 Interviews
Birla Cable Interview Questions
4.3
 • 2 Interviews
Cmind Interview Questions
3.9
 • 2 Interviews
View all

Vindhya Telelinks Reviews and Ratings

based on 435 reviews

4.1/5

Rating in categories

3.6

Skill development

3.9

Work-Life balance

3.9

Salary & Benefits

3.9

Job Security

3.7

Company culture

3.5

Promotions/Appraisal

3.7

Work Satisfaction

Explore 435 Reviews and Ratings
Project Engineer
171 salaries
unlock blur

₹2 L/yr - ₹6.2 L/yr

Senior Engineer
149 salaries
unlock blur

₹3 L/yr - ₹8.3 L/yr

Assistant Manager
129 salaries
unlock blur

₹4 L/yr - ₹9.6 L/yr

Assistant Engineer
53 salaries
unlock blur

₹2.2 L/yr - ₹4.5 L/yr

Deputy Manager
50 salaries
unlock blur

₹5 L/yr - ₹10.4 L/yr

Explore more salaries
Compare Vindhya Telelinks with

Sterlite Technologies

3.8
Compare

Finolex Cables

3.8
Compare

Polycab Wires

4.1
Compare

KEI Industries

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview