Transmission lines (TL) use various conductors for efficient power transfer, including aluminum and copper types.
Aluminum conductors are lightweight and have good conductivity, commonly used in overhead transmission lines.
Copper conductors offer higher conductivity and are often used in underground cables and smaller applications.
ACSR (Aluminum Conductor Steel Reinforced) combines aluminum and steel for strength a...
A 100 kVA transformer can handle a maximum load of 100 kVA, translating to approximately 80 kW for resistive loads.
1 kVA = 0.8 kW for resistive loads, so 100 kVA = 80 kW.
The actual load depends on the power factor; for example, a power factor of 0.9 gives 90 kW.
Transformers are rated in kVA because they can supply both active (kW) and reactive (kVAR) power.
For example, a 100 kVA transformer can supply 100 kVA of t...
High Density Polyethylene pipe
HDPE stands for High Density Polyethylene
HDPE pipes are commonly used in water supply, drainage, and gas distribution systems
They are known for their durability, flexibility, and resistance to corrosion
HDPE pipes are lightweight and easy to install, making them a popular choice in construction projects
Hydro pressure testing of a line involves filling the line with water and pressurizing it to check for leaks or weaknesses.
Fill the line with water to the required pressure level
Monitor the pressure for a specified duration to ensure it remains stable
Inspect the line for any leaks or weaknesses
Release the pressure and drain the water from the line after testing
Document the results and any necessary repairs or main...
The time it takes to finish an overhead tank depends on various factors such as size, materials used, labor availability, and weather conditions.
Factors affecting the time to finish an overhead tank include size of the tank, materials used, labor availability, and weather conditions.
For example, a small overhead tank made of concrete may take a few days to finish, while a larger tank made of steel could take weeks...
Extensive experience in power sector, focusing on renewable energy, grid management, and project implementation.
Led a team in the implementation of a solar power project that increased energy output by 30%.
Managed grid integration for a wind farm, ensuring compliance with regulatory standards.
Conducted feasibility studies for new power plants, analyzing environmental impact and cost efficiency.
Collaborated with cr...
A multi-purpose SCADA system can be created by designing a flexible and customizable interface with the ability to monitor and control various processes.
Identify the different processes and systems that need to be monitored and controlled
Design a user-friendly interface that allows for customization and flexibility
Implement communication protocols to connect the SCADA system to various devices and sensors
Include f...
The software commonly used for VFD programming is typically provided by the manufacturer of the VFD.
The software provided by the VFD manufacturer is usually specific to their brand and model of VFD
Common software for VFD programming includes Siemens Starter, ABB Drive Composer, and Schneider Electric SoMove
These software programs allow technicians to configure parameters, monitor performance, and troubleshoot issu...
I am looking for a salary that reflects my skills and experience, ideally higher than my previous role to match my growth.
In my previous company, my salary was competitive but I believe my skills have grown since then.
I am looking for a salary in the range of [insert desired range], which aligns with industry standards for my role.
For example, if my previous salary was $X, I would expect a salary increase of Y% ba...
S curve is a graphical representation of project progress over time.
S curve shows the planned progress, actual progress, and forecasted progress of a project.
It helps in tracking the project's performance and identifying any deviations from the plan.
The curve is named after its S-shape, which is formed due to the slow start, rapid progress, and slow finish of a project.
S curve is commonly used in construction, eng...
Experience in BBS quantity for water supply projects under JJM involves detailed planning and execution of construction activities.
Familiarity with the Bill of Quantities (BoQ) for water supply projects.
Experience in preparing Bar Bending Schedules (BBS) for reinforced concrete structures.
Knowledge of JJM guidelines and standards for water supply infrastructure.
Example: Calculating quantities for pipelines, storage tan...
I appeared for an interview in Apr 2025, where I was asked the following questions.
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
I am a seasoned engineer with over 10 years of experience in software development, specializing in scalable systems and team leadership.
Led a team of 5 engineers in developing a cloud-based application that increased client efficiency by 30%.
Implemented Agile methodologies, resulting in a 25% reduction in project delivery time.
Contributed to open-source projects, enhancing my skills and giving back to the community.
Men...
Extensive experience in power sector, focusing on renewable energy, grid management, and project implementation.
Led a team in the implementation of a solar power project that increased energy output by 30%.
Managed grid integration for a wind farm, ensuring compliance with regulatory standards.
Conducted feasibility studies for new power plants, analyzing environmental impact and cost efficiency.
Collaborated with cross-f...
I appeared for an interview in Nov 2024, where I was asked the following questions.
A 100 kVA transformer can handle a maximum load of 100 kVA, translating to approximately 80 kW for resistive loads.
1 kVA = 0.8 kW for resistive loads, so 100 kVA = 80 kW.
The actual load depends on the power factor; for example, a power factor of 0.9 gives 90 kW.
Transformers are rated in kVA because they can supply both active (kW) and reactive (kVAR) power.
For example, a 100 kVA transformer can supply 100 kVA of total ...
Transmission lines (TL) use various conductors for efficient power transfer, including aluminum and copper types.
Aluminum conductors are lightweight and have good conductivity, commonly used in overhead transmission lines.
Copper conductors offer higher conductivity and are often used in underground cables and smaller applications.
ACSR (Aluminum Conductor Steel Reinforced) combines aluminum and steel for strength and co...
I appeared for an interview in Oct 2024, where I was asked the following questions.
Description of work involves detailing the scope, tasks, and requirements of a project or job.
Provide a comprehensive breakdown of the project or job tasks
Include specific requirements such as materials, labor, and equipment needed
Detail the timeline and milestones for completion
Communicate with stakeholders to ensure understanding and alignment
I was responsible for assisting in the design and construction of civil engineering projects.
Assisted in the design and drafting of structural plans
Performed site visits and inspections to ensure compliance with regulations
Collaborated with project managers and contractors to coordinate project timelines
Prepared cost estimates and material quantities for project budgets
I applied via Walk-in and was interviewed in Mar 2024. There were 2 interview rounds.
Top trending discussions
The duration of Vindhya Telelinks interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 20 interview experiences
Difficulty level
Duration
based on 553 reviews
Rating in categories
Project Engineer
208
salaries
| ₹2.3 L/yr - ₹6.7 L/yr |
Senior Engineer
150
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Assistant Manager
146
salaries
| ₹4.8 L/yr - ₹9.8 L/yr |
Assistant Engineer
66
salaries
| ₹2.2 L/yr - ₹5.3 L/yr |
Deputy Manager
52
salaries
| ₹6.2 L/yr - ₹12 L/yr |
Indus Towers
Sterlite Technologies
Cisco
BT Business