Filter interviews by
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.
Standard size of a brick is 3 5/8 inches x 2 1/4 inches x 8 inches.
Standard size of a brick is 3 5/8 inches x 2 1/4 inches x 8 inches
Brick sizes can vary slightly depending on the manufacturer or region
Bricks are commonly used in construction for building walls, pavements, and other structures
What people are saying about Vindhya Telelinks
I applied via Walk-in
BOQ of 1 km LT line is a document that lists all the items required for the construction of a 1 km low tension line.
BOQ stands for Bill of Quantities
The BOQ includes details of materials, quantities, and prices
The BOQ helps in estimating the total cost of the project
Example items in the BOQ for a 1 km LT line: conductor, insulators, poles, transformers, hardware fittings, etc.
Vindhya Telelinks interview questions for designations
I applied via Naukri.com and was interviewed in Jun 2019. There were 3 interview rounds.
Why-Why analysis is a problem-solving technique used to identify the root cause of a problem by repeatedly asking 'why' until the underlying cause is determined.
Why-Why analysis is also known as the 5 Whys technique.
It helps to uncover the underlying causes of a problem rather than just addressing the symptoms.
The technique involves asking 'why' multiple times to dig deeper into the problem.
Each 'why' question leads to...
5s is a workplace organization method that aims to improve efficiency and productivity by organizing and standardizing the workplace.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical manner
Shine - clean and inspect the workplace regularly
Standardize - establish procedures and guidelines for maintaining the workplace
Sustain - maintain the 5s system through continuou...
Costing and estimation assignment for Senior Engineer position
Understand the scope of the project and gather all relevant information
Break down the project into smaller tasks and estimate the time and cost for each task
Consider factors such as materials, labor, equipment, and overhead costs
Use historical data or industry benchmarks to validate your estimates
Provide a detailed cost breakdown and justification for your e
Computer software skills
Estimation & costing related work
I was interviewed before Mar 2023.
Transformers are electrical devices that transfer energy between two or more circuits through electromagnetic induction.
Transformers work on the principle of electromagnetic induction
They consist of primary and secondary coils wrapped around a core
Step-up transformers increase voltage while step-down transformers decrease voltage
Efficiency of transformers is determined by the ratio of output power to input power
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
posted on 5 Nov 2023
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Electrical testing for equipment involves verifying functionality and safety through various tests.
Perform insulation resistance tests to check for any leakage currents
Conduct continuity tests to ensure proper electrical connections
Verify voltage and current ratings are within acceptable limits
Test for proper grounding to prevent electrical hazards
Use specialized equipment like multimeters and insulation testers
Documen
Different cable types have varying current carrying capacities and methods of laying, impacting overall electrical system performance.
Different cable types such as PVC, XLPE, and rubber have different current carrying capacities.
Current carrying capacity is influenced by factors like conductor size, insulation material, and ambient temperature.
Methods of laying cables include direct burial, conduit installation, and ov...
based on 4 interviews
Interview experience
based on 35 reviews
Rating in categories
Project Engineer
188
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
142
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
132
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
56
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Sterlite Technologies
Finolex Cables
Polycab Wires
KEI Industries