Upload Button Icon Add office photos

Filter interviews by

URC Construction MEP Manager Interview Questions and Answers

Updated 17 Oct 2023

URC Construction MEP Manager Interview Experiences

1 interview found

MEP Manager Interview Questions & Answers

user image Prabagaran

posted on 17 Oct 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. How you'll check quality
  • Ans. 

    Quality checks will be conducted through regular site inspections, material testing, subcontractor evaluations, and adherence to project specifications.

    • Regular site inspections to ensure work meets quality standards

    • Material testing to verify quality and durability

    • Evaluation of subcontractors to ensure they meet quality requirements

    • Adherence to project specifications and standards

    • Implementing quality control measures su

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What is your salary expectation
  • Q2. As per industry standard

Interview Preparation Tips

Interview preparation tips for other job seekers - Be bold

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What is the Steel margin
  • Ans. 

    Steel margin refers to the difference between the cost of producing steel and the selling price.

    • Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.

    • It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.

    • Factors that can impact the steel margin include fluctuations in ...

  • Answered by AI
  • Q2. What is the persentage of Aggregate in Gradiation test
  • Ans. 

    The percentage of aggregate in gradation test varies depending on the specific requirements of the project.

    • The percentage of aggregate in gradation test is typically determined by the specifications provided for the project

    • It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix

    • For example, in a concrete mix design, the percentage of coarse aggregate ma...

  • Answered by AI
  • Q3. Project manager role at site
  • Ans. 

    The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.

    • Responsible for planning, organizing, and directing project activities

    • Ensuring project goals are met within budget and timeline

    • Managing resources and stakeholders effectively

    • Problem-solving and decision-making skills are essential

    • Strong communication and leadership skills are necessary

  • Answered by AI
  • Q4. What is the overall cost in project in role of RCC
  • Ans. 

    The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.

    • Calculate the cost of materials such as cement, aggregates, and reinforcement bars.

    • Consider the cost of labor for construction and installation of RCC components.

    • Include any additional costs such as equipment rental, transportation, and overhead expenses.

    • Factor in the cost of quality control me...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Mot Satisfaction job
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About the Projects
  • Q2. Project Planning

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

11 Questions

  • Q1. How many years of experience?
  • Q2. Total experience about Water Supply Project out of 13years
  • Q3. Do you work in Consultancy firm & ask about of company ?
  • Ans. Yes, like Wapcos Ltd, LN Malviya infra & and described my roll
  • Answered Anonymously
  • Q4. Asked about inspection that how to check quality of work ?
  • Ans. During inspection of work check quality of material like cement, sand, aggregate, bricks, tmt steel bar, etc. as per IS codes/spec. Quality in Struct
  • Answered Anonymously
  • Q5. If contractors not compliance spec. Then what do you want or take action against.
  • Ans. 

    Take appropriate action against contractors not complying with specifications.

    • Identify the specific non-compliance issues

    • Communicate the non-compliance to the contractors

    • Request corrective actions or modifications to meet the specifications

    • Monitor and document the progress of corrective actions

    • Consider penalties or contract termination if non-compliance persists

  • Answered by AI
  • Q6. Asked about NCR full form
  • Ans. Non conformance Report or Non conformity reports
  • Answered Anonymously
  • Q7. Asked describe about NCR
  • Ans. A non-conformance report, non-conformity report or NCR, is a design and construction-related document that addresses issues where there has been a deviation from the project specification or where work fails to meet agreed quality standards
  • Answered Anonymously
  • Q8. Asked about preparation of financial & physical progress
  • Ans. Financial progress is certified amount which is taken from certified RA Bills . Physical progress is in ongoing progress of the project work which is taken from certified RA Bills qty. & running or ongoing qty.
  • Answered Anonymously
  • Q9. What is your CURRENT CTC & expected? Asked by HR.
  • Ans. Replied my ctc & want 30%hike
  • Answered Anonymously
  • Q10. Asked about working location
  • Q11. Asked about corrent CTC & expected
  • Ans. CTC +30%hike.then finally I have selected.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain about really experience which you have got & study about relevant IS codes & technical specifications.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. NORMAL DISCUSSION
  • Q2. TECHNIACAL AND COMMERCIAL
Round 3 - One-on-one 

(2 Questions)

  • Q1. NORMAL DISCUSSION
  • Q2. TECHNICAL AND COMMERCIAL QUESTION
Round 4 - HR 

(1 Question)

  • Q1. SALARY NEGOTIATION
Round 5 - Client Interview 

(1 Question)

  • Q1. TECHNICAL DISCUSSION
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Say about your any great achievement during your previous constitution professional experience & what was affort made by you?
  • Q2. Why you think that you are suitable for this position?
  • Q3. Your further most carrier goals?
  • Ans. 

    My further most career goal is to become a director of project management.

    • To gain experience in managing large-scale projects

    • To develop leadership and communication skills

    • To build a strong network of industry professionals

    • To continuously learn and stay updated with industry trends

    • To achieve PMP certification

    • To work towards becoming a subject matter expert in project management

    • To mentor and train junior project managers

    • ...

  • Answered by AI

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Overall experience till date and how will it be beneficial for executing type of projects being executed by L&T

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and honest, no exaggeration while answering.

I applied via Referral and was interviewed before Mar 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Basic Question about machinery

Interview Preparation Tips

Interview preparation tips for other job seekers - If your contacts are good then interview questions doesn't matter... You will be selected despite of all wrong answers.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Can you make bbs?
  • Ans. 

    Yes, I can make bbs.

    • I have experience in creating project schedules and budgets.

    • I am skilled in coordinating with team members and stakeholders.

    • I can effectively manage resources to ensure project success.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Personal details
  • Q2. Any work experience which is memorable?
  • Ans. 

    Working on a high-profile construction project with tight deadlines and complex requirements.

    • Coordinating with multiple stakeholders to ensure project milestones were met

    • Managing a team of subcontractors and ensuring quality control

    • Problem-solving on the fly to address unexpected challenges

    • Presenting project updates to senior management and clients

  • Answered by AI

I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. All civil work related questions asked me.
  • Q2. All civil work, quality, safety specification , technical method.
  • Q3. Planning ( msp), work scheduling.project target capture planned.

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview very fine.our confidential very true. Work period satisfaction .

URC Construction Interview FAQs

How many rounds are there in URC Construction MEP Manager interview?
URC Construction interview process usually has 3 rounds. The most common rounds in the URC Construction interview process are One-on-one Round, HR and Resume Shortlist.
What are the top questions asked in URC Construction MEP Manager interview?

Some of the top questions asked at the URC Construction MEP Manager interview -

  1. How you'll check qual...read more
  2. As per industry stand...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 405 Interviews
Apco Infratech Interview Questions
3.8
 • 111 Interviews
AECOM Interview Questions
4.3
 • 110 Interviews
GMR Group Interview Questions
4.1
 • 76 Interviews
View all
URC Construction MEP Manager Salary
based on 9 salaries
₹7.2 L/yr - ₹9 L/yr
41% less than the average MEP Manager Salary in India
View more details

URC Construction MEP Manager Reviews and Ratings

based on 2 reviews

2.1/5

Rating in categories

1.1

Skill development

1.1

Work-life balance

1.1

Salary

3.0

Job security

1.1

Company culture

1.1

Promotions

1.1

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Engineer
196 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Senior Engineer
125 salaries
unlock blur

₹3 L/yr - ₹8.9 L/yr

Assistant Engineer - Civil
61 salaries
unlock blur

₹2.4 L/yr - ₹5.7 L/yr

Assistant Manager
48 salaries
unlock blur

₹4.6 L/yr - ₹9.9 L/yr

Civil Site Engineer
48 salaries
unlock blur

₹1.9 L/yr - ₹5.4 L/yr

Explore more salaries
Compare URC Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview