I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.
Top trending discussions
posted on 19 Dec 2024
I was interviewed in Jan 2025.
I was interviewed in Dec 2024.
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
posted on 18 Oct 2024
I applied via Recruitment Consulltant
Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.
Establishing quality control procedures and protocols
Regular inspections and testing of materials and workmanship
Training and educating staff on quality standards
Implementing corrective actions when deviations are identified
Utilizing quality control tools such as checklists
BBS in code refers to Bar Bending Schedule as per Indian standards.
BBS stands for Bar Bending Schedule.
It is a detailed list of reinforcement bars to be used in a construction project.
It includes information on bar sizes, shapes, quantities, and placement.
BBS is prepared as per the requirements of Indian standards like IS 2502:1963.
It helps in ensuring proper reinforcement placement and quantity in the structure.
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.
Perform a slump test to determine the workability of the concrete mix.
Take samples from the mixed batch and cast test specimens for compressive strength testing.
Conduct compressive strength tests on the specimens to determine the grade of concrete.
Compare the test results with the standar
Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.
Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.
Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.
Site tests for cement include checking the color, sm...
Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.
Calculate the surface area of the wall by multiplying the height and length of each wall segment.
Determine the total surface area to be plastered by adding up the surface areas of all wall segments.
Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.
Consi...
posted on 23 Aug 2023
I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.
A structure is a system or arrangement of parts that are interconnected and function together to support loads and resist forces.
Structures can be man-made or natural
They can be made of various materials such as steel, concrete, wood, etc.
Examples include buildings, bridges, dams, towers, etc.
Types of concrete include ready-mix concrete, precast concrete, reinforced concrete, and shotcrete.
Ready-mix concrete is produced in a batching plant and delivered to the construction site in a plastic condition.
Precast concrete is cast in a reusable mold or form and cured in a controlled environment before being transported to the construction site.
Reinforced concrete contains steel reinforcement bars to increase its ...
Grades of concrete refer to the strength of the concrete mix design.
Grades of concrete are denoted by M10, M15, M20, etc. where 'M' stands for mix and the number denotes the compressive strength in MPa.
Higher grade concrete has higher compressive strength and is used for structural purposes.
Common grades include M25, M30, M35, and M40 for heavy-duty structures.
The mix proportions vary for different grades of concrete t
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
They ask question on SFD AND BMD
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
Interview experience
Assistant Manager
59
salaries
| ₹4.4 L/yr - ₹13.1 L/yr |
Senior Engineer
51
salaries
| ₹4 L/yr - ₹11.4 L/yr |
Structural Engineer
51
salaries
| ₹2.4 L/yr - ₹6.6 L/yr |
Highway Engineer
42
salaries
| ₹2.8 L/yr - ₹5.4 L/yr |
Civil Site Engineer
41
salaries
| ₹1.8 L/yr - ₹5.7 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure