Filter interviews by
The cube test acceptance criteria is a set of standards used to determine if a cube specimen meets the required strength for construction purposes.
The acceptance criteria typically involves comparing the compressive strength of the cube specimen to a specified minimum value.
The cube test acceptance criteria may also include factors such as curing conditions, testing procedures, and age of the specimen.
For example, a co...
The number of HT strands required depends on the specifications provided for the project.
The number of HT strands required will vary based on the voltage rating, current carrying capacity, and insulation requirements of the project.
Consult the project specifications to determine the exact number of HT strands needed.
For example, a project with a higher voltage rating may require more HT strands to meet the necessary in...
Concrete crack repairing involves cleaning the crack, filling it with a suitable material, and sealing it to prevent further damage.
Clean the crack thoroughly to remove any debris or loose material
Fill the crack with a suitable material such as epoxy or polyurethane
Seal the crack with a concrete sealer to prevent water infiltration and further damage
I was interviewed in Dec 2024.
The interview process was thorough and challenging, but overall a positive experience.
The interview consisted of multiple rounds, including technical, behavioral, and possibly a site visit.
I was asked to discuss my previous projects and experiences in detail.
There were questions about problem-solving skills and how I handle challenging situations on site.
Overall, the interviewers were professional and provided a clear
My salary expectations are in line with industry standards and based on my experience and qualifications.
Research industry standards for Civil Site Engineers in the specific location
Consider years of experience and level of qualifications
Be prepared to negotiate based on job responsibilities and benefits package
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Opportunity for professional growth
Company restructuring or downsizing
Relocation to a new city
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
Site administrative.
Cost and budget and agreed timeline.
URC Construction interview questions for popular designations
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
Branding schedule is a plan outlining the timeline and activities for promoting a brand.
Branding schedule includes tasks such as creating a brand strategy, designing a logo, developing marketing materials, and planning advertising campaigns.
It helps ensure consistency in brand messaging and image across different platforms and channels.
Example: A branding schedule for a new product launch may include market research, l...
Concrete grade and mixing ratio are crucial factors in determining the strength and durability of a structure.
Concrete grade refers to the strength of the concrete mix, typically denoted by a number like M20, M30, etc.
Mixing ratio is the proportion of cement, sand, and aggregate in the concrete mix, usually expressed as 1:x:y.
For example, a common mixing ratio for M20 grade concrete is 1:1.5:3, which means 1 part cemen
Regularly inspect and maintain all equipment and tools used on site to ensure they are in good working condition.
Create a maintenance schedule for all equipment and tools used on site.
Check for any signs of wear and tear on equipment and tools.
Clean and lubricate equipment regularly to prevent rust and corrosion.
Replace any damaged or worn out parts immediately.
Train site workers on proper handling and maintenance of e...
Get interview-ready with Top URC Construction Interview Questions
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Dec 2023. There were 2 interview rounds.
ABOUT ADMINSTRATION EXPRINCE
I applied via Company Website and was interviewed in Oct 2023. There was 1 interview round.
The duration of URC Construction interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 15 interviews
Interview experience
based on 493 reviews
Rating in categories
Assistant Engineer
182
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
132
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group