VCB stands for Vacuum Circuit Breaker which is an electrical switch used for protection of electrical power systems.
VCB uses vacuum as the arc quenching medium
It is used for protection of electrical power systems
It is more reliable and requires less maintenance compared to other circuit breakers
VCB is commonly used in high voltage applications such as power stations and substations
ACB stands for Air Circuit Breaker which is a type of electrical protection device used in power distribution systems.
ACB is used to protect electrical equipment from damage caused by short circuits and overloads.
It works by automatically disconnecting the power supply when a fault is detected.
ACBs are commonly used in industrial and commercial settings.
They are available in different sizes and ratings to suit differen...
Bacoch relay is a type of protective relay used in power systems.
It is used to detect faults in power systems and isolate the faulty section.
It operates based on the principle of electromagnetic attraction.
It is commonly used in high voltage transmission lines.
It is also known as a distance relay.
It can be classified into three types: impedance relay, reactance relay, and mho relay.
Top trending discussions
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
Unbilled data or accrual data refers to revenue that has been earned but not yet billed to the customer.
Unbilled data is a common term used in accounting to describe revenue that has been recognized but not yet invoiced.
Accrual data refers to expenses that have been incurred but not yet recorded in the accounting system.
Clearing unbilled data is important to ensure accurate financial reporting and to prevent revenue le...
Cash forecast is a projection of future cash inflows and outflows. Golden rules of accounting are basic principles to maintain accurate financial records.
Cash forecast helps in managing cash flow and planning for future expenses.
Golden rules of accounting are: debit the receiver, credit the giver; debit what comes in, credit what goes out; and debit expenses and losses, credit income and gains.
These rules ensure accura...
A credit note is a document issued by a seller to a buyer, indicating that a certain amount has been credited back to the buyer's account.
Credit notes are used to correct errors in invoices.
They are also used to adjust the amount owed by a customer.
Credit notes can be issued for returned goods or cancelled services.
They can also be used to give a discount or refund to a customer.
Credit notes are important for maintaini
Payment term is the time period within which a customer is required to pay for goods or services. Credit period is the time period for which a customer is allowed to delay payment.
Payment term is agreed upon by the seller and buyer during a transaction.
It can be expressed in days, weeks, or months.
For example, a payment term of 30 days means the customer must pay within 30 days of receiving the invoice.
Credit period is...
posted on 23 Apr 2021
I applied via Referral and was interviewed in Dec 2021. There were 4 interview rounds.
Constitution industry is not a commonly known term. Please provide more context.
Please provide more information or context about the constitution industry.
Without additional information, it is difficult to provide a meaningful answer.
It is possible that the interviewer misspoke or meant to ask about a different industry.
It is important to clarify the question before attempting to answer it.
URC will be the best fit for me because of my skills and experience in HR, which align with URC's values and goals.
My experience in HR will allow me to contribute to URC's HR initiatives
I share URC's commitment to diversity and inclusion
I am excited about the opportunity to work with a global organization
My skills in talent acquisition and employee engagement will be valuable to URC
posted on 17 Jun 2021
BIM application in highway models involves creating a digital representation of the road and its infrastructure.
BIM can be used to design and visualize highway projects
It allows for collaboration between different stakeholders
BIM can help with clash detection and reduce errors in construction
It can also be used for maintenance and asset management
Examples include the use of BIM in the construction of the M25 motorway i
I review/check work of an originator in Civil3D Models by following a systematic approach.
I check for errors and inconsistencies in the model.
I verify that the model adheres to the project standards and specifications.
I ensure that the model is accurate and complete.
I communicate with the originator to clarify any issues or concerns.
I document any changes or revisions made to the model.
I perform a final review before s
Roundabout parameters and values vary based on urban and rural settings.
Urban roundabouts typically have smaller diameters and tighter curves than rural roundabouts.
Rural roundabouts may have larger diameters and wider curves to accommodate larger vehicles.
Speed limits, traffic volume, and pedestrian and cyclist activity also influence roundabout design.
Roundabout parameters may include lane widths, splitter island wid...
ARCADY and PICADY software require input such as road geometry, traffic flow, and vehicle characteristics.
Road geometry data such as lane widths, radii, and gradients
Traffic flow data such as traffic volume, speed, and composition
Vehicle characteristics such as dimensions, speed, and acceleration
Other inputs such as signal timings and pedestrian crossings
I am proficient in Civil3D and have extensive experience in using it for designing and drafting civil engineering projects.
Expertise in creating and editing surfaces, alignments, profiles, and corridors
Ability to generate 3D models and perform earthwork calculations
Experience in creating plan and profile sheets, cross-sections, and quantity takeoffs
Familiarity with Civil3D add-ons such as AutoTURN and Hydraflow
Proficie...
I applied via LinkedIn and was interviewed in Aug 2021. There were 3 interview rounds.
Hedging process involves identifying risks, selecting appropriate instruments, and documenting the strategy.
Identify the risks to be hedged
Select appropriate hedging instruments
Document the hedging strategy and rationale
Monitor and adjust the hedge as necessary
Ensure compliance with regulatory requirements
Examples of hedging instruments include futures, options, and swaps
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
IS codes used for DI & HDPE pipe line, procedure for laying and jointing, and type tests conducted.
IS 8329:2000 for HDPE pipes
IS 8327:2000 for DI pipes
DI pipes are laid using trenchless technology like HDD
HDPE pipes are laid using open trench method
Jointing for DI pipes is done using push-on joint or mechanical joint
Jointing for HDPE pipes is done using butt fusion or electrofusion
Type tests conducted include hydrostat...
There are various tests conducted in concrete including compressive strength, flexural strength, and water absorption.
Compressive strength test is conducted to determine the strength of concrete under compression. IS code for this test is IS 516.
Flexural strength test is conducted to determine the strength of concrete under bending. IS code for this test is IS 516.
Water absorption test is conducted to determine the amo...
posted on 9 Sep 2020
I have extensive experience in commissioning activities in the Oil&Gas field.
I have worked on multiple commissioning projects in the Oil&Gas industry.
I have a deep understanding of the commissioning process and its importance in ensuring safe and efficient operations.
I have successfully led commissioning teams and coordinated activities to ensure timely completion.
I have experience in troubleshooting and resolving comm...
Completion system is a process that ensures all components of a project are fully functional and ready for operation.
Completion system involves testing and verifying all equipment, systems, and processes.
It includes conducting inspections, functional tests, and performance tests.
Documentation and certification of completion are important aspects of the process.
Examples of completion systems include commissioning a powe...
The system is handed over to the client through a structured process of testing, documentation, and training.
The system is thoroughly tested to ensure it meets all requirements and specifications
Documentation is provided to the client, including user manuals and technical specifications
Training is provided to the client's staff to ensure they can effectively use and maintain the system
A formal acceptance process is con...
based on 36 reviews
Rating in categories
RF Engineer
9
salaries
| ₹2 L/yr - ₹4.1 L/yr |
Project Coordinator
7
salaries
| ₹2.5 L/yr - ₹7 L/yr |
Project Engineer
6
salaries
| ₹2.3 L/yr - ₹3.6 L/yr |
DT Engineer
6
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Project Manager
5
salaries
| ₹3.6 L/yr - ₹5.4 L/yr |
Bharti Airtel
Vodafone Idea
Jio
Tata Communications