I applied via Campus Placement and was interviewed in Feb 2024. There were 3 interview rounds.
A gaming based psychometric test
Top trending discussions
I was interviewed in Dec 2016.
I am a passionate mechanical engineering student with a keen interest in design and manufacturing. I chose mechanical department due to my love for machines and problem-solving.
Passionate about design and manufacturing
Interest in problem-solving
Chose mechanical department due to love for machines
Academic projects focused on innovative designs and practical applications
posted on 4 Jul 2024
Project management and project planning
Aptitude test was for 45 mins. General aptitude questions were there in the test.
There was a case study. Contrary views were also accepted by the panel.
posted on 6 May 2024
I applied via Campus Placement
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Takt time is calculated by dividing the available production time by the customer demand.
Calculate the total available production time in a specified period (e.g. 1 day)
Determine the customer demand for the same period
Divide the total available production time by the customer demand to get the takt time
Takt Time = Total Production Time / Customer Demand
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Identify the tasks required to complete a process
Determine the cycle time for each task
Assign tasks to workstations based on cycle time and workload
Ensure that workstations are balanced to avoid bottlenecks
Regularly review and adjust the line balancing to optimize efficiency
Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.
Identify the key components of the system or process that contribute to its capacity
Collect data on the current workload or demand placed on the system
Use mathematical models or simulations to predict how the system will perform under different levels of workload
Consider factors such as resource ava...
There are three types of corner units: L-shaped, U-shaped, and diagonal. Sizes vary depending on the specific unit.
L-shaped corner units have two sides that meet at a right angle.
U-shaped corner units have three sides that meet at right angles.
Diagonal corner units are used to connect two non-adjacent sides at an angle.
Sizes can vary based on the specific unit and manufacturer.
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before Aug 2019. There was 1 interview round.
I have 3 years of experience in lean manufacturing, focusing on process improvement and waste reduction.
Implemented lean manufacturing principles to optimize production processes
Identified and eliminated non-value-added activities to improve efficiency
Led cross-functional teams to implement lean initiatives
Reduced lead times by 20% through the implementation of Kanban system
Implemented 5S methodology to improve workpla
Developing a lean system in the shop floor area involves identifying and eliminating waste to improve efficiency.
Identify the value stream and map out the current process
Identify and eliminate waste (muda) such as overproduction, waiting, defects, excess inventory, unnecessary motion, overprocessing, and unused talent
Implement a pull system to reduce inventory and improve flow
Standardize work processes and create a cul...
I'm sorry, but I don't have any information about KODAVARY system.
N/A
based on 1 interview
Interview experience
based on 12 reviews
Rating in categories
Assistant Manager
468
salaries
| ₹6 L/yr - ₹17.5 L/yr |
Territory Sales Manager
365
salaries
| ₹6 L/yr - ₹23.5 L/yr |
Deputy Manager
364
salaries
| ₹7.5 L/yr - ₹23.2 L/yr |
Territory Manager
335
salaries
| ₹5.8 L/yr - ₹25.3 L/yr |
Territory Service Manager
281
salaries
| ₹6.2 L/yr - ₹21.7 L/yr |
Bajaj Auto
Hero MotoCorp
Royal Enfield
Suzuki Motorcycle