Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Hero MotoCorp Team. If you also belong to the team, you can get access from here

Hero MotoCorp Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Hero MotoCorp Project Engineer Interview Questions and Answers

Updated 14 Jul 2024

Hero MotoCorp Project Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Aptitude test was for 45 mins. General aptitude questions were there in the test.

Round 2 - Case Study 

There was a case study. Contrary views were also accepted by the panel.

Round 3 - HR 

(2 Questions)

  • Q1. Asked about the project done in my B Tech Third year
  • Q2. Few questions regarding location of posting were asked.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be realistic and prepare well for the aptitude test

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How do you calculate takt time
  • Ans. 

    Takt time is calculated by dividing the available production time by the customer demand.

    • Calculate the total available production time in a specified period (e.g. 1 day)

    • Determine the customer demand for the same period

    • Divide the total available production time by the customer demand to get the takt time

    • Takt Time = Total Production Time / Customer Demand

  • Answered by AI
  • Q2. How do you do line balancing
  • Ans. 

    Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.

    • Identify the tasks required to complete a process

    • Determine the cycle time for each task

    • Assign tasks to workstations based on cycle time and workload

    • Ensure that workstations are balanced to avoid bottlenecks

    • Regularly review and adjust the line balancing to optimize efficiency

  • Answered by AI
  • Q3. How do you to capacity analaysis
  • Ans. 

    Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.

    • Identify the key components of the system or process that contribute to its capacity

    • Collect data on the current workload or demand placed on the system

    • Use mathematical models or simulations to predict how the system will perform under different levels of workload

    • Consider factors such as resource ava...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me something about yourself
  • Q2. Technical round

Interview Preparation Tips

Interview preparation tips for other job seekers - Go prepared

Interview Questionnaire 

3 Questions

  • Q1. Question asked on working profile and responsibility details
  • Q2. Question asked Competencies
  • Q3. Why would I like to change the Job
  • Ans. 

    Seeking new challenges, growth opportunities, and a better work-life balance.

    • Looking for new challenges and opportunities for growth

    • Seeking a better work-life balance

    • Interested in working with a different team or on different projects

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. NPD process with full project
  • Ans. 

    The NPD process with full project involves stages from idea generation to product launch.

    • Idea generation and screening

    • Concept development and testing

    • Business analysis

    • Prototype development

    • Market testing

    • Commercialization

  • Answered by AI
  • Q2. Project execution NPD process

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. How many types of corner units we have and their sizes?
  • Ans. 

    There are three types of corner units: L-shaped, U-shaped, and diagonal. Sizes vary depending on the specific unit.

    • L-shaped corner units have two sides that meet at a right angle.

    • U-shaped corner units have three sides that meet at right angles.

    • Diagonal corner units are used to connect two non-adjacent sides at an angle.

    • Sizes can vary based on the specific unit and manufacturer.

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Why do you choose this company?
  • Ans. I want to work with the reputation company to learn, personally professionally. And i wanted to achive something wherever im working.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Never Give up, if not this... Why not this. Simple as that.
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How do you calculate takt time
  • Ans. 

    Takt time is calculated by dividing the available production time by the customer demand.

    • Calculate the total available production time in a specified period (e.g. 1 day)

    • Determine the customer demand for the same period

    • Divide the total available production time by the customer demand to get the takt time

    • Takt Time = Total Production Time / Customer Demand

  • Answered by AI
  • Q2. How do you do line balancing
  • Ans. 

    Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.

    • Identify the tasks required to complete a process

    • Determine the cycle time for each task

    • Assign tasks to workstations based on cycle time and workload

    • Ensure that workstations are balanced to avoid bottlenecks

    • Regularly review and adjust the line balancing to optimize efficiency

  • Answered by AI
  • Q3. How do you to capacity analaysis
  • Ans. 

    Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.

    • Identify the key components of the system or process that contribute to its capacity

    • Collect data on the current workload or demand placed on the system

    • Use mathematical models or simulations to predict how the system will perform under different levels of workload

    • Consider factors such as resource ava...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me something about yourself
  • Q2. Technical round

Interview Preparation Tips

Interview preparation tips for other job seekers - Go prepared

Interview Questionnaire 

3 Questions

  • Q1. Question asked on working profile and responsibility details
  • Q2. Question asked Competencies
  • Q3. Why would I like to change the Job
  • Ans. 

    Seeking new challenges, growth opportunities, and a better work-life balance.

    • Looking for new challenges and opportunities for growth

    • Seeking a better work-life balance

    • Interested in working with a different team or on different projects

  • Answered by AI

I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Schedule management Cost management Risk management Stakeholder management Challenges Communication
Round 3 - HR 

(2 Questions)

  • Q1. Strength and weakness
  • Q2. Why are you switching

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
PMP study material would help

Hero MotoCorp Interview FAQs

How many rounds are there in Hero MotoCorp Project Engineer interview?
Hero MotoCorp interview process usually has 3 rounds. The most common rounds in the Hero MotoCorp interview process are Aptitude Test, Case Study and HR.

Tell us how to improve this page.

Hero MotoCorp Project Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Motors Interview Questions
4.2
 • 1k Interviews
Maruti Suzuki Interview Questions
4.2
 • 600 Interviews
TVS Motor Interview Questions
4.0
 • 310 Interviews
Bajaj Auto Interview Questions
3.9
 • 270 Interviews
Ashok Leyland Interview Questions
4.1
 • 239 Interviews
Royal Enfield Interview Questions
4.2
 • 151 Interviews
View all
Hero MotoCorp Project Engineer Salary
based on 7 salaries
₹4.5 L/yr - ₹10.7 L/yr
57% more than the average Project Engineer Salary in India
View more details

Hero MotoCorp Project Engineer Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

4.7

Skill development

4.5

Work-life balance

4.0

Salary

5.0

Job security

3.7

Company culture

4.7

Promotions

4.2

Work satisfaction

Explore 2 Reviews and Ratings
Deputy Manager
1k salaries
unlock blur

₹6 L/yr - ₹21 L/yr

Assistant Manager
690 salaries
unlock blur

₹5.6 L/yr - ₹18.4 L/yr

Associate Manager
645 salaries
unlock blur

₹10.4 L/yr - ₹25.7 L/yr

Territory Sales Manager
351 salaries
unlock blur

₹6 L/yr - ₹16 L/yr

Engineer
336 salaries
unlock blur

₹3.5 L/yr - ₹12 L/yr

Explore more salaries
Compare Hero MotoCorp with

Bajaj Auto

3.9
Compare

TVS Motor

4.0
Compare

Royal Enfield

4.2
Compare

Suzuki Motorcycle

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview