There are three types of corner units: L-shaped, U-shaped, and diagonal. Sizes vary depending on the specific unit.
L-shaped corner units have two sides that meet at a right angle.
U-shaped corner units have three sides that meet at right angles.
Diagonal corner units are used to connect two non-adjacent sides at an angle.
Sizes can vary based on the specific unit and manufacturer.
I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.
Top trending discussions
posted on 4 Jul 2024
Project management and project planning
The NPD process with full project involves stages from idea generation to product launch.
Idea generation and screening
Concept development and testing
Business analysis
Prototype development
Market testing
Commercialization
I applied via LinkedIn and was interviewed in Jan 2024. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Takt time is calculated by dividing the available production time by the customer demand.
Calculate the total available production time in a specified period (e.g. 1 day)
Determine the customer demand for the same period
Divide the total available production time by the customer demand to get the takt time
Takt Time = Total Production Time / Customer Demand
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Identify the tasks required to complete a process
Determine the cycle time for each task
Assign tasks to workstations based on cycle time and workload
Ensure that workstations are balanced to avoid bottlenecks
Regularly review and adjust the line balancing to optimize efficiency
Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.
Identify the key components of the system or process that contribute to its capacity
Collect data on the current workload or demand placed on the system
Use mathematical models or simulations to predict how the system will perform under different levels of workload
Consider factors such as resource ava...
I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Aug 2019. There was 1 interview round.
I have 3 years of experience in lean manufacturing, focusing on process improvement and waste reduction.
Implemented lean manufacturing principles to optimize production processes
Identified and eliminated non-value-added activities to improve efficiency
Led cross-functional teams to implement lean initiatives
Reduced lead times by 20% through the implementation of Kanban system
Implemented 5S methodology to improve workpla
Developing a lean system in the shop floor area involves identifying and eliminating waste to improve efficiency.
Identify the value stream and map out the current process
Identify and eliminate waste (muda) such as overproduction, waiting, defects, excess inventory, unnecessary motion, overprocessing, and unused talent
Implement a pull system to reduce inventory and improve flow
Standardize work processes and create a cul...
I'm sorry, but I don't have any information about KODAVARY system.
N/A
posted on 4 Jul 2024
Project management and project planning
based on 4 reviews
Rating in categories
Line Engineer
1.6k
salaries
| ₹1.4 L/yr - ₹9.5 L/yr |
Manager
876
salaries
| ₹10 L/yr - ₹42 L/yr |
Company Trainee
567
salaries
| ₹1.4 L/yr - ₹3.5 L/yr |
Assistant Manager
422
salaries
| ₹5.3 L/yr - ₹18.5 L/yr |
Area Sales Manager
367
salaries
| ₹11 L/yr - ₹38 L/yr |
Hero MotoCorp
TVS Motor
Mahindra & Mahindra
Maruti Suzuki