i
Torrent Power
Filter interviews by
I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Feb 2021. There were 7 interview rounds.
I applied via Recruitment Consultant and was interviewed before Nov 2020. There was 1 interview round.
MEIS stands for Merchandise Exports from India Scheme. It is a government initiative to promote exports of goods from India.
MEIS is a scheme introduced by the Indian government to incentivize and promote exports of goods from India.
Under MEIS, exporters are provided with duty credit scrips which can be used to pay various duties and taxes.
The scheme covers a wide range of products and sectors, including agriculture, te...
LC in export stands for Letter of Credit.
LC is a financial document issued by a bank to guarantee payment to the exporter.
It provides assurance to the exporter that they will receive payment for the goods or services exported.
LC serves as a secure method of payment in international trade.
It reduces the risk for both the exporter and the importer.
LC includes details such as the amount, terms, and conditions of the payme...
I applied via Referral and was interviewed in Sep 2020. There were 4 interview rounds.
I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.
A sales manager is responsible for leading and motivating a sales team to achieve sales targets and drive business growth.
A sales manager should have strong leadership and communication skills.
They should be able to set sales targets and develop strategies to achieve them.
They should motivate and train the sales team to improve performance.
A sales manager should analyze sales data and market trends to identify opportun...
I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.
I applied via LinkedIn and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
Load factor is the ratio of the actual output of a power plant to its maximum possible output over a period of time.
Load factor is calculated by dividing the average power output by the maximum power output over a specific period.
A high load factor indicates efficient utilization of the plant's capacity, while a low load factor suggests underutilization.
It is important for assessing the economic performance of a power ...
A steam turbine in a thermal power plant converts thermal energy into mechanical energy through a series of components and processes.
Main components of a steam turbine include rotor, blades, casing, and steam inlet/outlet.
Functions of a steam turbine include converting thermal energy into mechanical energy, generating electricity, and driving the generator.
Working principle involves high-pressure steam entering the tur...
Key challenges in minimizing heat losses in thermal power generation and ensuring efficient heat transfer.
Key challenges include heat losses in the boiler, condenser, and other components leading to decreased efficiency and increased operational costs.
Considerations include proper insulation of components, regular maintenance to prevent leaks, and optimizing combustion processes.
Efficient heat transfer can be achieved ...
Primary responsibilities include ensuring smooth operation of electrical systems in a thermal power plant. Testing and commissioning a generator involves several steps.
Ensure proper maintenance and operation of electrical equipment to prevent breakdowns
Troubleshoot electrical issues and perform repairs as needed
Monitor electrical systems for efficiency and safety
Conduct regular inspections and tests to identify potenti...
Main factors affecting thermal power plant efficiency and strategies for optimization.
Main factors include boiler efficiency, turbine efficiency, heat rate, and plant load factor.
Optimization strategies include regular maintenance, use of advanced technology, and efficient fuel management.
Example project: Implementing a heat recovery system to capture waste heat and improve overall efficiency.
Example initiative: Upgrad...
Executive Engineer
940
salaries
| ₹3.2 L/yr - ₹7.2 L/yr |
Executive
809
salaries
| ₹2.9 L/yr - ₹9.3 L/yr |
Assistant Manager
680
salaries
| ₹4.5 L/yr - ₹15.5 L/yr |
Junior Executive
516
salaries
| ₹2 L/yr - ₹4.9 L/yr |
Manager
164
salaries
| ₹9.6 L/yr - ₹29.8 L/yr |
Suzlon Group
Adani Power
Adani Group
Tata Power