Filter interviews by
I was interviewed in Dec 2020.
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
I have 5 years of experience in process management for a multinational company.
Managed and optimized various processes to improve efficiency and reduce costs
Implemented process improvements resulting in a 20% increase in productivity
Led a team of 10 process analysts to achieve departmental goals
Developed and implemented standard operating procedures to ensure consistency and quality
Collaborated with cross-functional te...
I applied via Recruitment Consultant and was interviewed before Jul 2020. There was 1 interview round.
Precommissioning and commissioning time can be reduced by proper planning, efficient execution, and use of technology.
Develop a detailed commissioning plan with clear timelines and responsibilities.
Ensure all necessary equipment and materials are available before starting commissioning activities.
Use technology such as automation and simulation to streamline the commissioning process.
Conduct thorough testing and inspec...
Velocity of water flushing, air blowing and steam blowing can be calculated using various formulas and measurements.
For water flushing, velocity can be calculated using the formula Q/A, where Q is the flow rate and A is the cross-sectional area of the pipe.
For air blowing, velocity can be calculated using the formula V = Q/A, where V is the velocity, Q is the flow rate and A is the cross-sectional area of the pipe.
For ...
Target blowing parameters refer to the specific conditions required for blowing air into a target area.
Target blowing parameters include air pressure, flow rate, and temperature.
The target area may be a specific location within a larger system, such as a pipeline or tank.
Parameters may vary depending on the type of material being blown, the distance of the target area, and other factors.
Examples of target blowing appli...
Steam blowing flowrate can be calculated using various methods.
Determine the volume of the piping system to be blown
Calculate the required velocity of steam based on pipe diameter and length
Determine the duration of the steam blow
Use the formula Q = AV to calculate the required flowrate
Consider safety factors and adjust flowrate accordingly
TechnipFMC interview questions for popular designations
I applied via Campus Placement and was interviewed in Mar 2020. There were 4 interview rounds.
Get interview-ready with Top TechnipFMC Interview Questions
I applied via Recruitment Consultant and was interviewed before Jul 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Oct 2018. There were 5 interview rounds.
I am a dedicated and experienced engineer with a strong background in project management and problem-solving.
Experienced in project management and problem-solving
Strong background in engineering
Dedicated and detail-oriented
Excellent communication skills
Team player
My future goal is to become a senior engineer and eventually move into a leadership role within the company.
Continue to develop my technical skills and knowledge in my field
Seek opportunities for mentorship and leadership training
Set specific goals for career advancement, such as obtaining certifications or completing advanced education
Work on improving communication and teamwork skills to prepare for leadership roles
I want to join TechnipFMC because of their reputation for innovation and commitment to excellence in engineering.
TechnipFMC is known for their cutting-edge technology and innovative solutions in the engineering industry
I am impressed by TechnipFMC's track record of successful projects and global presence
I believe that working at TechnipFMC will provide me with opportunities for professional growth and development
I am responsible for designing and implementing new features for our software products.
Designing and implementing new features for software products
Collaborating with team members to ensure successful project completion
Testing and debugging code to ensure quality and functionality
Participating in code reviews and providing feedback to peers
Yes, MRB (Manufacturing Record Book) is a document that contains detailed information about the manufacturing process.
MRB is a comprehensive record of all activities related to manufacturing, including design, production, testing, and quality control.
It serves as a reference for future production runs and helps ensure consistency and quality.
MRB typically includes information such as engineering drawings, specification...
Yes, QAP/ITP stands for Quality Assurance Plan/Inspection and Test Plan.
QAP/ITP is a document that outlines the quality assurance and inspection procedures for a project or product.
It includes details about the tests to be conducted, acceptance criteria, and responsibilities of different stakeholders.
QAP/ITP ensures that the project or product meets the required quality standards and specifications.
For example, in cons...
Radiography testing (RT) and ultrasonic testing (UT) are both non-destructive testing methods used to detect flaws in materials.
Radiography testing uses X-rays or gamma rays to create an image of the internal structure of an object, while ultrasonic testing uses high-frequency sound waves.
RT is typically used for thicker materials and can detect both surface and subsurface defects, while UT is more commonly used for th...
No, RT cannot replace UT examination.
RT (Radiographic Testing) and UT (Ultrasonic Testing) are two different non-destructive testing methods used in engineering.
RT uses X-rays or gamma rays to inspect the internal structure of an object, while UT uses sound waves to detect flaws or measure thickness.
Each method has its own advantages and limitations, and they are often used in combination to ensure comprehensive inspec...
WPS stands for Welding Procedure Specification and PQR stands for Procedure Qualification Record.
WPS is a document that provides detailed instructions on how to perform a specific welding procedure.
It includes information on welding parameters, materials, pre-weld and post-weld treatments, etc.
PQR is a record that documents the actual results of a welding procedure qualification test.
It includes details of the test, su...
Essential variables are crucial for the functioning of a system, while non-essential variables are not necessary but may provide additional information.
Essential variables are required for the system to operate correctly.
Non-essential variables are not necessary for the system's basic functionality.
Essential variables are typically directly related to the core purpose of the system.
Non-essential variables may provide s...
I was interviewed in Oct 2016.
Top trending discussions
Some of the top questions asked at the TechnipFMC interview -
The duration of TechnipFMC interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 49 interviews
Interview experience
based on 842 reviews
Rating in categories
Senior Engineer
171
salaries
| ₹7.1 L/yr - ₹25 L/yr |
Lead Analyst
129
salaries
| ₹4 L/yr - ₹11 L/yr |
Senior Executive
128
salaries
| ₹3.3 L/yr - ₹8.2 L/yr |
Piping Designer
112
salaries
| ₹3.5 L/yr - ₹14 L/yr |
L2 Engineer
107
salaries
| ₹7 L/yr - ₹16.5 L/yr |
McDermott International
Saipem
Subsea 7
Baker Hughes