Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There was 1 interview round.
I applied via Approached by Company and was interviewed in Jun 2021. There were 3 interview rounds.
I got job designation and appointment letter with flight ticket
Top trending discussions
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
The weight of plates can be calculated by multiplying the density of the material by the volume of the plate.
Determine the density of the material the plate is made of (e.g. steel has a density of 7850 kg/m^3)
Measure the dimensions of the plate (length, width, thickness)
Calculate the volume of the plate using the formula: volume = length x width x thickness
Multiply the volume by the density to get the weight of the pla
There are various types of mechanical tools used in construction and maintenance work.
Hand tools (e.g. hammer, screwdriver, wrench)
Power tools (e.g. drill, saw, grinder)
Heavy equipment (e.g. excavator, bulldozer, crane)
Measuring tools (e.g. tape measure, level, calipers)
There are mainly three types of beams: Simply supported beam, Cantilever beam, and Overhanging beam.
Simply supported beam is supported at both ends and carries load in the middle.
Cantilever beam is supported at one end and carries load at the other end.
Overhanging beam has one or both ends extending beyond its supports.
There are several types of flanges used in piping systems for connecting pipes, valves, and other equipment.
Weld Neck Flange
Slip On Flange
Socket Weld Flange
Threaded Flange
Blind Flange
Lap Joint Flange
Orifice Flange
I applied via Indeed
HSE procedures for Hot work involve obtaining a permit, conducting a risk assessment, implementing control measures, and monitoring the work.
Obtain a hot work permit before starting any hot work activities.
Conduct a risk assessment to identify potential hazards and implement control measures.
Ensure proper training and supervision for workers performing hot work.
Monitor the work area for any signs of fire or other hazar...
I was interviewed in Jul 2022.
I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
I applied via Other and was interviewed in Dec 2021. There was 1 interview round.
The question is unclear and seems to be unrelated to the HSE Officer role.
The term 'grabitesinal' is not a recognized term in the field of health and safety.
It is possible that the interviewer misspoke or meant to ask a different question.
As an HSE Officer, my focus is on identifying and mitigating workplace hazards to ensure the safety of employees.
I am well-versed in regulations and best practices related to occupati...
I applied via Recruitment Consultant and was interviewed in Jun 2021. There was 1 interview round.
Seven steps for electrical safety
Identify potential electrical hazards
Develop and implement safety procedures
Provide proper training to employees
Use appropriate personal protective equipment
Regularly inspect and maintain electrical equipment
Ensure proper grounding and wiring
Respond promptly to any electrical incidents
Activity stop take 5 is a safety procedure to pause work and identify potential hazards.
It is a safety measure to prevent accidents and injuries.
It involves stopping work for 5 minutes to identify any potential hazards.
During this time, workers can discuss safety concerns and take corrective actions.
It is commonly used in industries such as construction, manufacturing, and oil and gas.
It helps to promote a safety cultu
I applied via Campus Placement and was interviewed before Feb 2021. There was 1 interview round.
Some of the top questions asked at the TechnipFMC HSE Supervisor interview -
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
171
salaries
| ₹7.1 L/yr - ₹25 L/yr |
Lead Analyst
129
salaries
| ₹4 L/yr - ₹11 L/yr |
Senior Executive
128
salaries
| ₹3.3 L/yr - ₹8.2 L/yr |
Piping Designer
112
salaries
| ₹3.5 L/yr - ₹14 L/yr |
L2 Engineer
107
salaries
| ₹7 L/yr - ₹16.5 L/yr |
McDermott International
Saipem
Subsea 7
Baker Hughes