Filter interviews by
I applied via Recruitment Consultant and was interviewed before Jul 2020. There was 1 interview round.
Precommissioning and commissioning time can be reduced by proper planning, efficient execution, and use of technology.
Develop a detailed commissioning plan with clear timelines and responsibilities.
Ensure all necessary equipment and materials are available before starting commissioning activities.
Use technology such as automation and simulation to streamline the commissioning process.
Conduct thorough testing and inspec...
Velocity of water flushing, air blowing and steam blowing can be calculated using various formulas and measurements.
For water flushing, velocity can be calculated using the formula Q/A, where Q is the flow rate and A is the cross-sectional area of the pipe.
For air blowing, velocity can be calculated using the formula V = Q/A, where V is the velocity, Q is the flow rate and A is the cross-sectional area of the pipe.
For ...
Target blowing parameters refer to the specific conditions required for blowing air into a target area.
Target blowing parameters include air pressure, flow rate, and temperature.
The target area may be a specific location within a larger system, such as a pipeline or tank.
Parameters may vary depending on the type of material being blown, the distance of the target area, and other factors.
Examples of target blowing appli...
Steam blowing flowrate can be calculated using various methods.
Determine the volume of the piping system to be blown
Calculate the required velocity of steam based on pipe diameter and length
Determine the duration of the steam blow
Use the formula Q = AV to calculate the required flowrate
Consider safety factors and adjust flowrate accordingly
Top trending discussions
Senior Engineer
178
salaries
| ₹7.1 L/yr - ₹24.2 L/yr |
Lead Analyst
134
salaries
| ₹4 L/yr - ₹10.6 L/yr |
Senior Executive
120
salaries
| ₹3.3 L/yr - ₹8.2 L/yr |
Piping Designer
112
salaries
| ₹3.5 L/yr - ₹14 L/yr |
L2 Engineer
105
salaries
| ₹7 L/yr - ₹16.5 L/yr |
McDermott International
Saipem
Subsea 7
Baker Hughes