I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
The latest version of PPAP is PPAP 4th Edition.
PPAP stands for Production Part Approval Process.
The 4th Edition of PPAP was released in 2006.
It is a standardized process in the automotive industry to ensure that suppliers meet the requirements for production parts.
PPAP includes documentation such as design records, engineering change documents, and control plans.
It also involves conducting various tests and measurement...
FMEA is a method used during development to identify and mitigate potential failures in a system or process.
FMEA stands for Failure Mode and Effects Analysis.
It is a systematic approach to identify and prioritize potential failures in a system or process.
FMEA helps in understanding the potential causes and effects of failures.
It is used to assess the severity, occurrence, and detectability of failures.
By analyzing fail...
DVP&R stands for Design Verification Plan and Report. It is a process used to ensure that a product meets its design specifications.
DVP&R is a structured approach to testing and validating a product's design.
It involves creating a plan for testing the product, executing the tests, and documenting the results.
The plan includes details such as the test objectives, test methods, acceptance criteria, and test schedule.
The ...
NDC stands for National Drug Code. It is a unique identifier for drugs in the United States.
NDC is a 10-digit code that identifies drugs, including prescription and over-the-counter medications.
The first segment of the NDC represents the labeler code, which identifies the manufacturer or distributor of the drug.
The second segment represents the product code, which identifies the specific drug formulation and strength.
T...
PPAP file making is done during the production validation stage of NPD work.
PPAP file making is a part of the production validation process in NPD work
It involves documenting the production process and ensuring it meets customer requirements
PPAP file making is typically done after the design and development stages
It includes documentation such as control plans, process flow diagrams, and inspection records
The ppm in 6 sigma is 3.4 defects per million opportunities (DPMO).
6 sigma aims for a defect rate of 3.4 DPMO.
PPM stands for parts per million.
DPMO is a measure of process performance.
The lower the DPMO, the better the process performance.
Achieving 6 sigma means having a process that produces 99.99966% defect-free output.
Pareto chart is a problem-solving tool used to identify and prioritize the causes of a problem.
Pareto chart is a bar graph that displays the relative frequency or size of problems in descending order of importance.
It helps to identify the vital few causes that account for the majority of the problems.
It is based on the Pareto principle, also known as the 80/20 rule, which states that 80% of the effects come from 20% of...
Quality is meeting or exceeding customer expectations and requirements.
Quality is a measure of how well a product or service meets customer needs and expectations.
It involves meeting or exceeding customer requirements and specifications.
Quality can be measured through various metrics such as defect rates, customer satisfaction, and reliability.
Quality is a continuous process that involves identifying and addressing are...
Poka yoke is a quality control technique used to prevent errors or defects in a process.
Poka yoke aims to eliminate mistakes by designing processes or systems that make errors impossible or immediately detectable.
It involves implementing foolproof mechanisms, such as sensors, alarms, or physical barriers, to prevent or correct errors.
For example, a poka yoke in a manufacturing line could be a sensor that detects if a c...
Statistical Process Control (SPC) is a quality tool used to monitor and control processes to ensure they are within acceptable limits.
SPC involves collecting and analyzing data to identify and eliminate sources of variation in a process.
Control charts are commonly used in SPC to visually display process data and identify any trends or patterns.
Examples of SPC tools include histograms, Pareto charts, scatter diagrams, a
Cp and Cpk are statistical tools used to measure process capability and determine if a process is capable of producing products within specification limits.
Cp measures the potential capability of a process to meet specifications
Cpk measures the actual capability of a process to meet specifications
Both Cp and Cpk are calculated using the process mean and standard deviation, as well as the upper and lower specification l...
SPC stands for Statistical Process Control. It is a method used to monitor and control processes to ensure they are operating within acceptable limits.
SPC involves collecting and analyzing data to identify and reduce process variation.
It helps in detecting and preventing defects or errors in a process.
Control charts are commonly used in SPC to visually display process data and identify any trends or patterns.
SPC can be...
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
Spares management involves inventory control, procurement, and maintenance planning.
Create a detailed inventory of all spares and their usage frequency.
Establish a procurement process that ensures timely availability of spares.
Implement a maintenance plan that includes regular inspection and replacement of spares.
Use technology such as barcoding and RFID to track spares and prevent loss or theft.
Regularly review and up...
Shift issues can be managed by effective communication, proper scheduling, and providing necessary resources.
Establish clear communication channels between team members and management
Create a schedule that takes into account employee preferences and availability
Ensure that all necessary resources are available for each shift
Regularly review and adjust the schedule as needed
Provide training and support for employees to ...
I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.
Spark Minda interview questions for popular designations
I applied via Walk-in and was interviewed in Jul 2021. There was 1 interview round.
TBO stands for Time Between Overhaul in coupler, which is the time interval between two overhauls of a coupler.
TBO is a maintenance term used in the aviation industry.
It refers to the time interval between two overhauls of a coupler.
During an overhaul, the coupler is disassembled, inspected, repaired, and reassembled.
The TBO for a coupler depends on the manufacturer's recommendations and the coupler's usage.
Exceeding t...
Get interview-ready with Top Spark Minda Interview Questions
I applied via Walk-in and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
I am a production engineer with experience in optimizing manufacturing processes and ensuring efficient production.
Experienced production engineer
Skilled in optimizing manufacturing processes
Ensuring efficient production
Strong knowledge of production equipment and technologies
Proficient in analyzing data and implementing improvements
Collaborative team player
I was a Senior Production Engineer in my previous company.
I held the position of Senior Production Engineer.
I was responsible for overseeing production processes and ensuring efficiency.
I worked closely with the production team to identify and resolve any issues.
I implemented improvements to optimize production output and reduce costs.
I collaborated with other departments to coordinate production schedules and meet dea...
As a Production Engineer, my role is to oversee the manufacturing process, optimize production efficiency, and ensure quality control.
Overseeing the manufacturing process
Optimizing production efficiency
Ensuring quality control
Identifying and resolving production issues
Implementing process improvements
Collaborating with cross-functional teams
Monitoring production metrics and analyzing data
Creating and maintaining produc
DFT in painting stands for Dry Film Thickness.
DFT is the thickness of the paint film after it has dried.
It is measured using a coating thickness gauge.
The DFT is important for ensuring proper protection and appearance of the painted surface.
For example, a coating may require a minimum DFT of 2 mils to provide adequate corrosion protection.
DFT can also affect the drying time and curing of the paint.
Dry film thickness refers to the thickness of a coating after it has dried and cured.
It is measured using a coating thickness gauge.
It is important to ensure that the dry film thickness meets the specifications for the coating.
The dry film thickness can affect the performance and durability of the coating.
Examples of coatings that require specific dry film thickness include paint, powder coating, and plating.
Dry film t...
Excess DFT can lead to increased cost and longer production time.
Excess DFT can lead to increased material usage and waste.
It can also lead to longer production time and increased cost.
The excess DFT may also affect the performance and durability of the product.
It is important to ensure that the DFT is within the specified range to avoid these issues.
I applied via Approached by Company and was interviewed before Dec 2021. There were 3 interview rounds.
I applied via LinkedIn and was interviewed before Oct 2020. There were 3 interview rounds.
Yes, I can sell.
I have a proven track record of exceeding sales targets.
I am skilled in building relationships with clients and understanding their needs.
I am adept at presenting products or services in a persuasive manner.
I have experience in negotiating and closing deals.
I continuously stay updated on market trends and competitor analysis.
Lead development of new products involves identifying market opportunities, conducting market research, creating product concepts, and overseeing the product development process.
Identify market opportunities by analyzing customer needs, market trends, and competitor offerings
Conduct market research to gather insights on customer preferences, market size, and potential demand
Create product concepts based on market resea...
Top trending discussions
The duration of Spark Minda interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 35 interviews
Interview experience
based on 1.7k reviews
Rating in categories
Assistant Manager
382
salaries
| ₹4.5 L/yr - ₹14.4 L/yr |
Deputy Manager
235
salaries
| ₹6.8 L/yr - ₹23.5 L/yr |
Senior Engineer
234
salaries
| ₹2.2 L/yr - ₹10.1 L/yr |
Quality Engineer
226
salaries
| ₹1.4 L/yr - ₹5.7 L/yr |
Engineer
177
salaries
| ₹2.2 L/yr - ₹6 L/yr |
JBM Group
Subros
Endurance Technologies
Gabriel India