
Spark Minda


10+ Spark Minda Senior Engineer Interview Questions and Answers
Q1. Q2. What is Fmea & why it is used during development?
FMEA is a method used during development to identify and mitigate potential failures in a system or process.
FMEA stands for Failure Mode and Effects Analysis.
It is a systematic approach to identify and prioritize potential failures in a system or process.
FMEA helps in understanding the potential causes and effects of failures.
It is used to assess the severity, occurrence, and detectability of failures.
By analyzing failure modes, FMEA helps in developing strategies to prevent ...read more
Q2. At which stage the Npd work of PPAP File making is done?
PPAP file making is done during the production validation stage of NPD work.
PPAP file making is a part of the production validation process in NPD work
It involves documenting the production process and ensuring it meets customer requirements
PPAP file making is typically done after the design and development stages
It includes documentation such as control plans, process flow diagrams, and inspection records
Q3. Problem solving tools & describe pareto chart & why we use it..?
Pareto chart is a problem-solving tool used to identify and prioritize the causes of a problem.
Pareto chart is a bar graph that displays the relative frequency or size of problems in descending order of importance.
It helps to identify the vital few causes that account for the majority of the problems.
It is based on the Pareto principle, also known as the 80/20 rule, which states that 80% of the effects come from 20% of the causes.
It is used to focus on the most significant is...read more
Q4. What is the value of NDC & we take the this value..??
NDC stands for National Drug Code. It is a unique identifier for drugs in the United States.
NDC is a 10-digit code that identifies drugs, including prescription and over-the-counter medications.
The first segment of the NDC represents the labeler code, which identifies the manufacturer or distributor of the drug.
The second segment represents the product code, which identifies the specific drug formulation and strength.
The third segment represents the package code, which identi...read more
Q5. Q1. What is the latest version of PPAP?
The latest version of PPAP is PPAP 4th Edition.
PPAP stands for Production Part Approval Process.
The 4th Edition of PPAP was released in 2006.
It is a standardized process in the automotive industry to ensure that suppliers meet the requirements for production parts.
PPAP includes documentation such as design records, engineering change documents, and control plans.
It also involves conducting various tests and measurements to validate the production process.
PPAP is used to demon...read more
Q6. How many ppm in 6 sigma..?
The ppm in 6 sigma is 3.4 defects per million opportunities (DPMO).
6 sigma aims for a defect rate of 3.4 DPMO.
PPM stands for parts per million.
DPMO is a measure of process performance.
The lower the DPMO, the better the process performance.
Achieving 6 sigma means having a process that produces 99.99966% defect-free output.
Q7. What is DVP&R ?
DVP&R stands for Design Verification Plan and Report. It is a process used to ensure that a product meets its design specifications.
DVP&R is a structured approach to testing and validating a product's design.
It involves creating a plan for testing the product, executing the tests, and documenting the results.
The plan includes details such as the test objectives, test methods, acceptance criteria, and test schedule.
The report summarizes the test results and provides recommenda...read more
Q8. How to manage spares.
Spares management involves inventory control, procurement, and maintenance planning.
Create a detailed inventory of all spares and their usage frequency.
Establish a procurement process that ensures timely availability of spares.
Implement a maintenance plan that includes regular inspection and replacement of spares.
Use technology such as barcoding and RFID to track spares and prevent loss or theft.
Regularly review and update the spares management process to optimize efficiency ...read more
Q9. How to manage shift issue
Shift issues can be managed by effective communication, proper scheduling, and providing necessary resources.
Establish clear communication channels between team members and management
Create a schedule that takes into account employee preferences and availability
Ensure that all necessary resources are available for each shift
Regularly review and adjust the schedule as needed
Provide training and support for employees to handle unexpected situations
Encourage feedback from employ...read more
Q10. 8D report with real example
8D report is a problem-solving methodology used to identify, correct and prevent recurring problems.
8D stands for 8 Disciplines
It involves a team-based approach to problem-solving
The report includes a detailed description of the problem, root cause analysis, corrective actions, and preventive measures
Example: A manufacturing company received customer complaints about a defect in their product. The team used the 8D report to identify the root cause, which was a faulty machine ...read more
Interview Process at Spark Minda Senior Engineer

Top Senior Engineer Interview Questions from Similar Companies








Reviews
Interviews
Salaries
Users/Month

