Simplex Infrastructures Assistant Engineer Civil (Civ) Interview Questions and Answers

Updated 29 Aug 2020

Simplex Infrastructures Assistant Engineer Civil (Civ) Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before Aug 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Delhi
  • Q2. What is mean by RCC and PCC
  • Ans. 

    RCC stands for Reinforced Cement Concrete and PCC stands for Plain Cement Concrete.

    • RCC is a composite material made of cement, sand, aggregate, and steel reinforcement.

    • It is used in the construction of beams, columns, slabs, and other structural elements.

    • RCC provides higher strength and durability compared to PCC.

    • PCC is a mixture of cement, sand, and aggregate without any reinforcement.

    • It is used for non-structural ele...

  • Answered by AI
  • Q3. Area development was meaning of PCC
  • Ans. 

    PCC stands for Plain Cement Concrete which is used for area development in civil engineering.

    • PCC is a mixture of cement, sand, and water.

    • It is used as a base for flooring, foundations, and pavements.

    • PCC is also used for leveling the surface of the ground.

    • It is an important component of construction projects.

    • Example: PCC is used for constructing footpaths, driveways, and parking lots.

  • Answered by AI
  • Q4. No other questions and no answer

Interview Preparation Tips

Interview preparation tips for other job seekers - No anything

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. Have you maintained standard quality in your previous company?
  • Q2. Do you use drawing and technology in your work?
  • Q3. Are you doing to maintain time in your life
Round 2 - Aptitude Test 

Calculator for material quantity on site material

Round 3 - HR 

(2 Questions)

  • Q1. How do you calculate the quantity of a specific item or material?
  • Q2. What methods do you use to verify information?

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you for providing me with this opportunity.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(7 Questions)

  • Q1. Quality and material control
  • Q2. Work Productivity
  • Q3. Rre_productivity
  • Q4. Post product activity
  • Q5. Good knowledge and good behaviour
  • Q6. Pre_productivity
  • Q7. Post productivity

Interview Preparation Tips

Interview preparation tips for other job seekers - PSP PROJECT LMT
Civil Foreman
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Labournet services India Pvt Ltd
Senior Civil Trainer
Working as a Civil construction Trainer.
Certified in Assistant mason and Shuttering carpentery trade by NSDC.
Worked in multiple Skill development projects.
NAREDCO, PMKVY, BOCW and Morth.
Trained more than 500 labourers under skill development program.
L&T Construction
Civil Supervisor
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Al Jaber Group Dubai UAE
Chargehand
Worked as a chargehand with the team of 15 labour.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Al Jaber Group Dubai UAE
Civil Foreman
Worked as a Civil Formen with the team of 15 labour.
Barbending, Shuttering carpentery, Masonry and finishing works.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

The goal of an aptitude test is to predict the ability to learn new skills

Round 2 - Technical 

(2 Questions)

  • Q1. What experience do you have that relates to this job role
  • Q2. Tell me about your final year projects

Interview Preparation Tips

Interview preparation tips for other job seekers - Send follow up mails
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Ratio of m25 concrete
  • Ans. 

    The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)

    • The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This ratio is commonly used in construction for medium strength concrete.

    • For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.

  • Answered by AI
  • Q2. Per cum brick qty.
Round 2 - Technical 

(2 Questions)

  • Q1. What is your responsibility previous company name
  • Ans. 

    As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.

    • Assisted senior engineers in project planning and design

    • Participated in site visits and inspections

    • Prepared project reports and documentation

    • Collaborated with team members and contractors

    • Ensured compliance with safety regulations and quality standards

  • Answered by AI
  • Q2. What is your responsibility previous company site Role.
  • Ans. 

    Managed site operations, coordinated with contractors, ensured compliance with safety regulations.

    • Managed day-to-day site operations

    • Coordinated with contractors for timely completion of projects

    • Ensured compliance with safety regulations and quality standards

    • Prepared progress reports and communicated with stakeholders

    • Implemented cost-saving measures without compromising quality

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Name of the client
  • Ans. 

    The name of the client is XYZ Construction Company.

    • XYZ Construction Company is a well-known construction firm in the region.

    • They have completed several projects in the past, including the construction of a new office building in downtown.

    • The client has a reputation for high-quality work and timely project completion.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(11 Questions)

  • Q1. Scar drawing and technical point
  • Q2. With safety trying best output
  • Q3. Field requirement and safety first
  • Q4. Working area material properly staged
  • Q5. Focus on work quality
  • Q6. Be carefull with machinery
  • Q7. Everytime touch with workers
  • Q8. Given detail of senior timely
  • Q9. Proper discussion with senior
  • Q10. Touch with total staff
  • Ans. 

    Maintain regular communication and interaction with all staff members.

    • Regularly check in with staff to ensure they have the resources and support they need

    • Hold regular team meetings to discuss project progress and address any concerns

    • Encourage open communication and feedback from all team members

    • Provide opportunities for team building and collaboration

    • Lead by example by being accessible and approachable to all staff me

  • Answered by AI
  • Q11. Given 110% daily
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. How many types of cement?
  • Q2. What is cement
Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in Jun 2024. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Site Engineer 

(1 Question)

  • Q1. Building construction
Round 3 - Technical 

(1 Question)

  • Q1. Structure finishing work
Round 4 - Technical 

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear/Sir

I am Mr.Brajesh kumar sharma currently jobs company capacity infraprojects limited at BSNL project MCTE mhow indore (M.P) position currntly in sr.engineer civil at work structure finishing
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

SOLAR ENERGY RELETED CIVIL CONSTRUCTION DISCUSSION

Round 2 - Technical 

(2 Questions)

  • Q1. Work process, work ability, and all releted civil function.
  • Q2. System of solar
  • Ans. 

    Solar system refers to the collection of planets and other objects that orbit around a star, typically referring to our own solar system with the Sun at its center.

    • The solar system consists of the Sun, eight planets, moons, asteroids, comets, and other celestial bodies.

    • The planets in our solar system are Mercury, Venus, Earth, Mars, Jupiter, Saturn, Uranus, and Neptune.

    • The Sun is the central star of our solar system, p...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI

Simplex Infrastructures Interview FAQs

What are the top questions asked in Simplex Infrastructures Assistant Engineer Civil (Civ) interview?

Some of the top questions asked at the Simplex Infrastructures Assistant Engineer Civil (Civ) interview -

  1. What is mean by RCC and P...read more
  2. Area development was meaning of P...read more
  3. No other questions and no answ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 714 Interviews
Tata Projects Interview Questions
4.2
 • 412 Interviews
TCE Interview Questions
3.8
 • 244 Interviews
AECOM Interview Questions
4.2
 • 111 Interviews
Apco Infratech Interview Questions
3.7
 • 111 Interviews
View all
Assistant Manager
193 salaries
unlock blur

₹3.5 L/yr - ₹11.1 L/yr

Assistant Engineer
164 salaries
unlock blur

₹1.8 L/yr - ₹5.1 L/yr

Assistant Engineer - Civil
161 salaries
unlock blur

₹2.6 L/yr - ₹4.7 L/yr

Project Engineer
145 salaries
unlock blur

₹2.9 L/yr - ₹7.8 L/yr

Deputy Manager
115 salaries
unlock blur

₹5.5 L/yr - ₹12.6 L/yr

Explore more salaries
Compare Simplex Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview