Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Hydro electric power project
  • Q2. Tunnel experience
  • Ans. 

    I have extensive experience working on tunnel projects, including design, construction, and maintenance.

    • Managed tunnel construction projects from start to finish

    • Performed site investigations and surveys for tunnel alignment

    • Designed tunnel support systems and ventilation systems

    • Implemented safety measures to ensure worker protection

    • Conducted regular inspections and maintenance to ensure tunnel integrity

    • Collaborated with...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Rithwik Projects Senior Civil Site Engineer interview:
  • Tunnel
Interview preparation tips for other job seekers - Concrete, tunnel Rock support, reinforcement

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com

Round 1 - HR 

(2 Questions)

  • Q1. Foundation footing how much cover required
  • Ans. 

    Foundation footing requires a minimum cover of 50mm to 75mm for reinforcement protection.

    • Minimum cover of 50mm to 75mm is required for foundation footing to protect the reinforcement from corrosion and provide adequate strength.

    • The cover requirement may vary based on the type of soil, environmental conditions, and structural design.

    • Proper cover ensures durability and stability of the foundation.

    • In some cases, additiona...

  • Answered by AI
  • Q2. Shuttering column up to FFL how much cover required
  • Ans. 

    The cover required for shuttering column up to FFL depends on the type of concrete being used and the environmental conditions.

    • Cover required for shuttering column up to FFL typically ranges from 25mm to 50mm.

    • Factors such as type of concrete mix, exposure conditions, and structural requirements can influence the required cover.

    • For example, in harsh environmental conditions or high-strength concrete, a higher cover may ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - N/A
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Tyes and grade of steel, difference between fe550 and fe550D, development length, BBS, binding wire, test of concrete, IS codes, de shuttering time, mix design, nominal mix, admixture, etc,
  • Ans. 

    Understanding of steel types and grades, development length, BBS, concrete testing, IS codes, de-shuttering time, mix design, admixtures, etc.

    • Steel types and grades like Fe550 and Fe550D differ in their ductility and strength properties

    • Development length is the length of bar required for full development of stress in reinforcement

    • BBS (Bar Bending Schedule) is a detailed list of reinforcement bars with their shapes, siz...

  • Answered by AI
  • Q2. Question related your field and job profile
  • Q3. Material reconciliation, quantity of steel required per square foot area etc
  • Q4. What you do if compressive strength test of concrete fails, why we do test at 3 days, 7 days , 28 days
  • Ans. 

    If compressive strength test of concrete fails, investigate potential causes like incorrect mix proportions or curing methods. Testing at 3, 7, and 28 days allows for monitoring strength development over time.

    • Investigate potential causes of failure such as incorrect mix proportions, improper curing methods, or testing errors

    • Consider retesting samples to confirm results and identify any discrepancies

    • Testing at 3 days pr...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Regarding salery current and expected
  • Q2. Notice period, salery slips, bank account details, qualification documents etc

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T is a good company, go ahead with your full potential, but strictly timing,
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. Why do you want to quit your present organisation ?
  • Q2. Would you like to go to outside of West Bengal ?
  • Q3. How much salary would you expect ?
  • Q4. Within how many days would you like to join?

Interview Preparation Tips

Interview preparation tips for other job seekers - Friendly

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Prepare i.s codes well and general civil engineering related topics
  • Q2. Retaining wall and piling
  • Q3. Finish items in building construction
  • Ans. 

    Finish items are the final touches in building construction that make it ready for occupancy.

    • Painting and finishing walls

    • Installing flooring and baseboards

    • Installing light fixtures and switches

    • Installing plumbing fixtures

    • Installing cabinetry and countertops

    • Landscaping and exterior finishing

  • Answered by AI
  • Q4. Interior related work

Interview Preparation Tips

Topics to prepare for Toyo Engineering Senior Civil Site Engineer interview:
  • I.s codes
Interview preparation tips for other job seekers - Ans confidently be loud and sound and show how eager r u for this job.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Vani Vidya Bithi, Kolkata and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Aptitude, verbal, core, logical questions

Round 2 - Technical 

(3 Questions)

  • Q1. Questions from favourite subject
  • Q2. BMD of a frame
  • Ans. 

    BMD of a frame refers to the bending moment diagram which shows the variation of bending moment along the length of a structural frame.

    • BMD is a graphical representation of the variation of bending moment in a structural frame.

    • It helps in analyzing the internal forces and stresses in the frame.

    • BMD is typically plotted with the bending moment on the y-axis and the length of the frame on the x-axis.

    • The BMD can be used to ...

  • Answered by AI
  • Q3. Base pressure diagram of foundation
  • Ans. 

    Base pressure diagram of foundation shows the distribution of pressure on the foundation base.

    • Base pressure diagram helps in understanding how the load is distributed on the foundation base.

    • It is important for designing foundations to ensure they can support the load effectively.

    • The diagram typically shows higher pressure under the columns and lower pressure in between.

    • It is used to determine the size and depth of the ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You need in depth knowlege of subject and they can ask you to design a foundation.

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of concrete cube
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

    • Standard size for concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes may be used for specific projects or requirements

  • Answered by AI
  • Q2. 150mm*150mm*150mm
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to select a conductor?
  • Ans. 

    Conductors are selected based on factors like material, size, insulation, and current carrying capacity.

    • Consider the material of the conductor (e.g. copper, aluminum)

    • Determine the size of the conductor based on the current it will carry

    • Choose the appropriate insulation for the conductor based on the environment it will be used in

    • Ensure the conductor has the required current carrying capacity for the application

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - see terms and conditions
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI

Rithwik Projects Interview FAQs

How many rounds are there in Rithwik Projects Senior Civil Site Engineer interview?
Rithwik Projects interview process usually has 2 rounds. The most common rounds in the Rithwik Projects interview process are Resume Shortlist and Technical.
What are the top questions asked in Rithwik Projects Senior Civil Site Engineer interview?

Some of the top questions asked at the Rithwik Projects Senior Civil Site Engineer interview -

  1. Tunnel experie...read more
  2. hydro electric power proj...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 691 Interviews
Apco Infratech Interview Questions
3.8
 • 110 Interviews
AECOM Interview Questions
4.3
 • 109 Interviews
AtkinsRealis Interview Questions
4.0
 • 83 Interviews
View all
Assistant Manager
35 salaries
unlock blur

₹5.4 L/yr - ₹10.8 L/yr

Civil Engineer
20 salaries
unlock blur

₹2.4 L/yr - ₹6.8 L/yr

Tunnel Engineer
18 salaries
unlock blur

₹4 L/yr - ₹7.5 L/yr

Surveyor
16 salaries
unlock blur

₹2.2 L/yr - ₹8.4 L/yr

Senior Engineer
15 salaries
unlock blur

₹5 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Rithwik Projects with

L&T Construction

4.0
Compare

L&T Energy Hydrocarbon

3.9
Compare

AECOM

4.3
Compare

Simplex Infrastructures

3.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview