posted on 21 Apr 2024

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. Why do you want to quit your present organisation ?
  • Q2. Would you like to go to outside of West Bengal ?
  • Q3. How much salary would you expect ?
  • Q4. Within how many days would you like to join?

Interview Preparation Tips

Interview preparation tips for other job seekers - Friendly

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Slump cone top diameter ?
  • Ans. 

    The top diameter of a slump cone is typically 4 inches.

    • The top diameter of a slump cone is usually 4 inches.

    • The slump cone is used to measure the consistency of fresh concrete.

    • The top diameter of the slump cone affects the flow of the concrete mix.

    • A larger top diameter will result in a higher slump value.

  • Answered by AI
  • Q2. Full from of TMT ?
  • Ans. 

    Thermo-Mechanically Treated

    • TMT stands for Thermo-Mechanically Treated

    • TMT bars are commonly used in construction for reinforcement

    • The process involves heating the steel bars and then rapidly cooling them to increase their strength

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Bullet points casting yard executions team Cage checking, FSLM casting, stressing, grouting and recess filling etc.

Round 3 - One-on-one 

(1 Question)

  • Q1. Metro station finishing work and casting yard
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Tyes and grade of steel, difference between fe550 and fe550D, development length, BBS, binding wire, test of concrete, IS codes, de shuttering time, mix design, nominal mix, admixture, etc,
  • Ans. 

    Understanding of steel types and grades, development length, BBS, concrete testing, IS codes, de-shuttering time, mix design, admixtures, etc.

    • Steel types and grades like Fe550 and Fe550D differ in their ductility and strength properties

    • Development length is the length of bar required for full development of stress in reinforcement

    • BBS (Bar Bending Schedule) is a detailed list of reinforcement bars with their shapes, siz...

  • Answered by AI
  • Q2. Question related your field and job profile
  • Q3. Material reconciliation, quantity of steel required per square foot area etc
  • Q4. What you do if compressive strength test of concrete fails, why we do test at 3 days, 7 days , 28 days
  • Ans. 

    If compressive strength test of concrete fails, investigate potential causes like incorrect mix proportions or curing methods. Testing at 3, 7, and 28 days allows for monitoring strength development over time.

    • Investigate potential causes of failure such as incorrect mix proportions, improper curing methods, or testing errors

    • Consider retesting samples to confirm results and identify any discrepancies

    • Testing at 3 days pr...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Regarding salery current and expected
  • Q2. Notice period, salery slips, bank account details, qualification documents etc

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T is a good company, go ahead with your full potential, but strictly timing,
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Group Discussion 

Time pass topic only till to an hour.

Round 2 - Technical 

(5 Questions)

  • Q1. No technical sound during interview.
  • Q2. Where are you working now?
  • Q3. Are you able to work in TCE?
  • Ans. 

    Yes, I am able to work in TCE.

    • I have experience working in TCE (Total Civil Engineering) on various projects.

    • I am familiar with the software and tools commonly used in TCE.

    • I have successfully completed projects in TCE, showcasing my skills and knowledge in the field.

  • Answered by AI
  • Q4. You will get 35k salary on hand while on paper will displayed 50k to 60k
  • Q5. Only offering contractual job.

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to be Fool than try to join TCE.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(7 Questions)

  • Q1. Quality and material control
  • Q2. Work Productivity
  • Q3. Rre_productivity
  • Q4. Post product activity
  • Q5. Good knowledge and good behaviour
  • Q6. Pre_productivity
  • Q7. Post productivity

Interview Preparation Tips

Interview preparation tips for other job seekers - PSP PROJECT LMT
Civil Foreman
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Labournet services India Pvt Ltd
Senior Civil Trainer
Working as a Civil construction Trainer.
Certified in Assistant mason and Shuttering carpentery trade by NSDC.
Worked in multiple Skill development projects.
NAREDCO, PMKVY, BOCW and Morth.
Trained more than 500 labourers under skill development program.
L&T Construction
Civil Supervisor
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Al Jaber Group Dubai UAE
Chargehand
Worked as a chargehand with the team of 15 labour.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Al Jaber Group Dubai UAE
Civil Foreman
Worked as a Civil Formen with the team of 15 labour.
Barbending, Shuttering carpentery, Masonry and finishing works.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

The goal of an aptitude test is to predict the ability to learn new skills

Round 2 - Technical 

(2 Questions)

  • Q1. What experience do you have that relates to this job role
  • Q2. Tell me about your final year projects

Interview Preparation Tips

Interview preparation tips for other job seekers - Send follow up mails
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Design of beam and column
  • Ans. 

    Designing beams and columns involves determining the size, material, and layout to support the required loads.

    • Consider the type of structure and the loads it will bear

    • Calculate the required dimensions and reinforcement based on structural analysis

    • Select appropriate materials such as steel or concrete

    • Ensure proper connections and detailing for stability and safety

  • Answered by AI
  • Q2. Condition of limit state of servicibility
  • Ans. 

    Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.

    • Limit state of serviceability ensures that a structure remains usable and safe for occupants.

    • It involves checking factors like deflection, vibration, cracking, and durability.

    • For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Ratio of m25 concrete
  • Ans. 

    The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)

    • The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This ratio is commonly used in construction for medium strength concrete.

    • For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.

  • Answered by AI
  • Q2. Per cum brick qty.
Round 2 - Technical 

(2 Questions)

  • Q1. What is your responsibility previous company name
  • Ans. 

    As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.

    • Assisted senior engineers in project planning and design

    • Participated in site visits and inspections

    • Prepared project reports and documentation

    • Collaborated with team members and contractors

    • Ensured compliance with safety regulations and quality standards

  • Answered by AI
  • Q2. What is your responsibility previous company site Role.
  • Ans. 

    Managed site operations, coordinated with contractors, ensured compliance with safety regulations.

    • Managed day-to-day site operations

    • Coordinated with contractors for timely completion of projects

    • Ensured compliance with safety regulations and quality standards

    • Prepared progress reports and communicated with stakeholders

    • Implemented cost-saving measures without compromising quality

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Name of the client
  • Ans. 

    The name of the client is XYZ Construction Company.

    • XYZ Construction Company is a well-known construction firm in the region.

    • They have completed several projects in the past, including the construction of a new office building in downtown.

    • The client has a reputation for high-quality work and timely project completion.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. What is used in pipe laying for water project
  • Q2. What is HDPE and DI
  • Q3. What is M25

Simplex Infrastructures Interview FAQs

How many rounds are there in Simplex Infrastructures Senior Civil Site Engineer interview?
Simplex Infrastructures interview process usually has 1 rounds. The most common rounds in the Simplex Infrastructures interview process are HR.

Tell us how to improve this page.

Simplex Infrastructures Senior Civil Site Engineer Salary
based on 4 salaries
₹5 L/yr - ₹8.5 L/yr
29% more than the average Senior Civil Site Engineer Salary in India
View more details

Simplex Infrastructures Senior Civil Site Engineer Reviews and Ratings

based on 1 review

2.0/5

Rating in categories

2.0

Skill development

1.0

Work-Life balance

1.0

Salary & Benefits

2.0

Job Security

1.0

Company culture

1.0

Promotions/Appraisal

1.0

Work Satisfaction

Explore 1 Review and Rating
Assistant Manager
193 salaries
unlock blur

₹3.5 L/yr - ₹11.1 L/yr

Assistant Engineer
164 salaries
unlock blur

₹1.8 L/yr - ₹5.1 L/yr

Assistant Engineer - Civil
161 salaries
unlock blur

₹2.6 L/yr - ₹4.7 L/yr

Project Engineer
145 salaries
unlock blur

₹2.9 L/yr - ₹7.8 L/yr

Deputy Manager
114 salaries
unlock blur

₹5 L/yr - ₹12 L/yr

Explore more salaries
Compare Simplex Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview