1

Technical Round (15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index 30%, water absorption <2% , I...read more
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. ...read more
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute...read more
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Na...read more
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is ...read more
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure st...read more
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M
Interview experience
5
 Excellent
Difficulty level
 Moderate
Duration
 Less than 2 weeks
Result
Selected  Selected

I applied via Company Website and was interviewed before Feb 2022.

2 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
2

Technical Round (3 Questions)

  • Q1. Why we are use lap in centre of column or Zone B?
  • Q2. Where are construction joint is provide in simply supported slab?
  • Q3. L/6 or L/ 3 where L is sapan of slab

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are doing your job with practical experience then no worries about any interview

I applied via Referral and was interviewed in May 2021.

3 Interview Rounds

Interview Questions

  • Q1. Mostly technical related to the job position and expectancy of the organisation. Add Answer

Interview Preparation Tips

Interview preparation tips for other job seekers - Value proposition to the organisation should be taken care of.
Interview experience
3
 Average
Difficulty level
 Easy
Duration
 -
Result
 Not Selected

1 Interview Round

1

Technical Round (3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Q3. How much ur carpent area and buildup area

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
4
 Good
Difficulty level
 Moderate
Duration
 Less than 2 weeks
Result
Selected  Selected

I applied via Company Website and was interviewed before Feb 2019.

2 Interview Rounds

Interview Questions

Interview experience
5
 Excellent
Difficulty level
 -
Duration
 -
Result
Selected  Selected

2 Interview Rounds

1

Technical Round (1 Question)

  • Q1. Project Monitoring, scheduling Analyze projects, budget, cash flow, coordination with contractors, Consultant and allied services, construction, resource manage...read more
2

Group Discussion Round

Already talked to you

2 Interview Rounds

1

Technical Round (3 Questions)

  • Q1. About construction and technical aspects.
  • Q2. About Family, previous company job profiles
  • Q3. Joining time, salary, family
2

HR Round (2 Questions)

  • Q1. Job and working atmosphere, Team handling etc
  • Q2. Salary part, family relocation etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Attend positively and honestly and you will be abld to clear

Interview Questions

I applied via Approached by Company and was interviewed before Jul 2021.

5 Interview Rounds

1

One-on-one Round (2 Questions)

  • Q1. Project Specific and work experience based questions. Work profile. Cultural transformation. Execution Strategies. Budgeting. PPM. Execution excellence. Risk an...read more
  • Q2. Specialization areas , core strength and weakness, Ethical walk through,
2

HR Round (1 Question)

  • Q1. About salary, position and opportunities. Adding preferred location of working, job objective, company code of conduct
3

Copitency test Round (1 Question)

  • Q1. Checking the competency by online test , evaluation
4

One-on-one Round (1 Question)

  • Q1. Discussion with BU President
5

One-on-one Round (1 Question)

  • Q1. Discussion with CEO of company, based on experience and deals in project risks and mitigation plan , situation based questionnaires

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Make a proper profile
2. Put Technical data sheet
3. Focus on past working experiences
4. Should have fair execution strategy
5. Should have basics of budget, resources planning of 3M
6. Facing the interview with confidence
7. Be optimistic, calculative

Tell us how to improve this page.

PNC Infratech Senior Project Manager Salary
based on 8 salaries
₹31 L/yr - ₹45 L/yr
55% more than the average Senior Project Manager Salary in India
View more details

PNC Infratech Senior Project Manager Reviews and Ratings

based on 3 reviews

3.7/5

Rating in categories

2.4

Skill development

3.7

Work-Life balance

3.6

Salary & Benefits

4.7

Job Security

2.8

Company culture

2.7

Promotions/Appraisal

3.6

Work Satisfaction

Explore 3 Reviews and Ratings
Assistant Engineer
165 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Junior Engineer
106 salaries
unlock blur

₹1.8 L/yr - ₹4.6 L/yr

Assistant Manager
82 salaries
unlock blur

₹4.8 L/yr - ₹11 L/yr

Accounts Officer
53 salaries
unlock blur

₹3.2 L/yr - ₹6.6 L/yr

Highway Engineer
50 salaries
unlock blur

₹2.7 L/yr - ₹7.2 L/yr

Explore more salaries
Compare PNC Infratech with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview