Filter interviews by
I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 2 interview rounds.
Precautions for working at height include proper training, use of fall protection equipment, regular inspection of equipment, and securing tools and materials.
Ensure workers are properly trained on working at height procedures
Use appropriate fall protection equipment such as harnesses, lanyards, and guardrails
Regularly inspect all equipment used for working at height to ensure it is in good condition
Secure tools and ma...
A lifting plan is a detailed document outlining the procedures and precautions to be taken when lifting heavy objects.
A lifting plan should include the weight of the object being lifted
It should specify the equipment to be used for lifting
The plan should outline the steps to be taken to ensure the safety of workers involved
It should also consider factors such as the location of the lift and any potential hazards
Regular...
Risk assessment is the process of identifying, analyzing, and evaluating potential risks in order to determine the likelihood and impact of harmful events.
Identifying potential hazards and risks in the workplace or environment
Analyzing the likelihood of these risks occurring
Evaluating the potential impact of these risks on people, property, and the environment
Developing strategies to mitigate or eliminate these risks
Re...
Capacity of wire rope sling can be calculated by considering factors like diameter, material, and configuration.
Capacity is determined by the breaking strength of the wire rope and the design factor used.
Calculate the breaking strength of the wire rope by multiplying the area of the rope cross-section by the tensile strength of the material.
Consider the configuration of the sling (single leg, double leg, etc.) and appl...
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
My name is jawed alam ummedpura Naya gaon tunnel project i live in kota. Rajsthan
There are multiple types of fire extinguishers, sign boards, lifting equipment, permits, scaffolding, barricading, safety management, and safety cones in safety supervision.
Types of fire extinguishers include water, foam, CO2, dry powder, and wet chemical.
Types of sign boards include prohibition signs, warning signs, mandatory signs, and emergency signs.
Safety management involves identifying, assessing, and controlling...
There are mainly three types of accidents: preventable accidents, non-preventable accidents, and near misses.
Preventable accidents are those that could have been avoided if proper safety measures were in place.
Non-preventable accidents are those that occur due to unforeseen circumstances or factors beyond control.
Near misses are incidents where an accident almost happened but was narrowly avoided.
Examples: Slip and fal...
Safety management involves implementing policies, procedures, and practices to ensure a safe work environment.
Safety management includes identifying and assessing risks in the workplace.
It involves developing and implementing safety policies and procedures.
Safety management also includes training employees on safety protocols.
Regular inspections and audits are conducted to ensure compliance with safety regulations.
Inci...
There are several types of scaffolding used in construction, each with its own unique features and purposes.
Supported scaffolding - includes frame, tube and coupler, and mobile scaffolding
Suspended scaffolding - hangs from the roof or a tall structure
Rolling scaffolding - has wheels for easy movement
Cantilever scaffolding - supported by a series of needles and projecting beams
Trestle scaffolding - small, portable scaff
There are various types of permits required for different safety-related activities.
There are different types of permits such as hot work permit, confined space entry permit, excavation permit, etc.
Each permit is specific to the type of work being conducted and the associated hazards.
Permits are used to ensure that proper safety measures are in place before work begins.
Permit systems help in controlling and monitoring
Technical features description and share Karen comment using hai ma'am ne kia songs music Blog archive for the conveyance of the day
Technical features description and share Karen comment using hai ma'am ne kia songs music Blog archive for the conveyance of the day
I applied via LinkedIn and was interviewed in Nov 2023. There were 2 interview rounds.
Tool box meetings are regular safety meetings held on job sites to discuss potential hazards, safety procedures, and promote a safety culture.
Tool box meetings are typically held at the beginning of each work shift or day.
Topics discussed include recent incidents, near misses, safety reminders, and any new safety procedures.
Employees are encouraged to actively participate by sharing their own experiences and suggestion...
posted on 11 Jun 2024
I applied via Naukri.com and was interviewed in Dec 2023. There were 3 interview rounds.
The number of limit switches in a tower crane varies depending on the specific model and manufacturer.
The number of limit switches in a tower crane can range from 2 to 6 or more.
Limit switches are used to prevent the crane from overtraveling or overloading.
Common types of limit switches used in tower cranes include hoisting limit switches, trolley limit switches, and slewing limit switches.
Safety culture in project,hou many year of experience in safety field, inspection
posted on 17 Jan 2024
posted on 13 Feb 2023
I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.
Accommodation by company refers to the housing provided by an employer to their employees.
It is a benefit provided by some companies to their employees
The housing can be on-site or off-site
It can be provided for short-term or long-term stays
Examples include oil rigs, mining camps, and corporate apartments
I was interviewed before Feb 2024.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Junior Engineer
883
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
621
salaries
| ₹3.1 L/yr - ₹9 L/yr |
Junior Engineer Civil
387
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Engineer
299
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Assistant Engineer - Civil
247
salaries
| ₹3.3 L/yr - ₹8.9 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys