Upload Button Icon Add office photos

Filter interviews by

Navayuga Engineering Company Tunnel Engineer Interview Questions and Answers

Updated 25 Jan 2025

Navayuga Engineering Company Tunnel Engineer Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What should be the necessary document for Bill?, how do you justify that fiber shotcrete is okay or not ? What should be safest distance for Tunnel face blast?, what is powder factor?
  • Ans. 

    The necessary document for Bill is a detailed invoice. Fiber shotcrete can be justified through testing and analysis. The safest distance for Tunnel face blast depends on various factors. Powder factor is a measure of explosive efficiency.

    • The necessary document for Bill is a detailed invoice that includes all the relevant information such as the scope of work, quantities, rates, and any additional charges.

    • To justify th...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Ask about last experience, ctc, environment

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm and answers peacefully

Tunnel Engineer Interview Questions & Answers

user image Mukesh kr sharma

posted on 25 Jan 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. How to manage site?
  • Q2. What is the regular test on site

Tunnel Engineer Interview Questions Asked at Other Companies

asked in Geodata
Q1. What information is required when designing tunnel projects
Q2. What should be the necessary document for Bill?, how do you justi ... read more
Q3. What is pullout test and where it is used
Q4. Describe the blast details with powder factor and quantity
Q5. Description for Standup time and Tunnel Supports

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Why did you have to go through four rounds of interviews?
  • Q2. What is your experience in the oil and gas industry?

Interview Preparation Tips

Interview preparation tips for other job seekers - This company offers positions for both experienced professionals and fresh graduates in the Aramco oil and gas sector.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Discuss about Work Experience and skill.
  • Q2. Current work detail.
  • Q3. What is the team size under you and what is management ability.
Round 2 - HR 

(2 Questions)

  • Q1. Discussion about Current salary
  • Q2. Discussion about expected salary with negotiation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Must try to get an job opportunity here.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There were 9 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. This is information to company
  • Q2. This is company sites through
  • Q3. This company is highly growth
  • Q4. This is responsible for the employee
Round 2 - Technical 

(2 Questions)

  • Q1. Bar bending shedule in this question
  • Q2. What are you quality control
  • Ans. 

    Quality control is a process used to ensure that products or services meet specified requirements and standards.

    • Quality control involves inspecting, testing, and evaluating products or services to ensure they meet quality standards.

    • It also includes identifying defects or deviations from specifications and taking corrective actions.

    • Quality control helps to prevent defects, improve processes, and enhance customer satisfa...

  • Answered by AI
Round 3 - Group Discussion 

This is company at the high economy

Round 4 - Aptitude Test 

Number system and latter

Round 5 - Coding Test 

On basis of defined structure

Round 6 - One-on-one 

(1 Question)

  • Q1. The information to company
Round 7 - Case Study 

This check the soil testing

Round 8 - Assignment 

This is growth process in the employee

Round 9 - So interested your job profile 

(1 Question)

  • Q1. I like this with company

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Role of engineer to control disaster management

Round 2 - HR 

(1 Question)

  • Q1. Normal qurstions
Round 3 - Technical 

(1 Question)

  • Q1. About technical skills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Site planning , binding work ,
  • Q2. Drawing work auto CAD
  • Q3. Billing engineer, work s
  • Q4. Salary Client al

Interview Preparation Tips

Topics to prepare for L & W Constructions Civil Site Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Site engineer
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

SOLAR ENERGY RELETED CIVIL CONSTRUCTION DISCUSSION

Round 2 - Technical 

(2 Questions)

  • Q1. Work process, work ability, and all releted civil function.
  • Q2. System of solar
  • Ans. 

    Solar system refers to the collection of planets and other objects that orbit around a star, typically referring to our own solar system with the Sun at its center.

    • The solar system consists of the Sun, eight planets, moons, asteroids, comets, and other celestial bodies.

    • The planets in our solar system are Mercury, Venus, Earth, Mars, Jupiter, Saturn, Uranus, and Neptune.

    • The Sun is the central star of our solar system, p...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. I am fresher and 3 month job in Maharashtra civil site engineer engineer on duty and I am a final year student
Round 2 - Material related 

(4 Questions)

  • Q1. Concrete material
  • Q2. Type of material
  • Ans. 

    Civil engineers work with a variety of materials including concrete, steel, asphalt, and wood.

    • Common materials used in civil engineering include concrete, steel, asphalt, wood, and aggregates.

    • Concrete is used for foundations, roads, and structures.

    • Steel is used for beams, columns, and reinforcement.

    • Asphalt is used for roads and pavements.

    • Wood is used for formwork, bridges, and buildings.

    • Aggregates are used in concrete

  • Answered by AI
  • Q3. Material distribution
  • Q4. Normal material

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Earthing design
  • Ans. Explain Earthing design using excel or any earthing design software
  • Answered by B.Mohammed Amjad
  • Q2. Cable Sizing calculation
  • Ans. Explain step by step procedure of Cable Sizing
  • Answered by B.Mohammed Amjad
  • Q3. How to handle designers in tough time
  • Ans. 

    Communicate openly, provide support, set clear expectations, offer solutions

    • Communicate openly with designers to understand their challenges and concerns

    • Provide support and resources to help designers overcome tough times

    • Set clear expectations and goals to keep designers focused and motivated

    • Offer solutions and brainstorm ideas together to find the best way forward

  • Answered by AI
  • Q4. Explain your individual contribution to the project

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your resume updated which would exactly match your previous organization experience. Show your achievements

Navayuga Engineering Company Interview FAQs

How many rounds are there in Navayuga Engineering Company Tunnel Engineer interview?
Navayuga Engineering Company interview process usually has 2 rounds. The most common rounds in the Navayuga Engineering Company interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in Navayuga Engineering Company Tunnel Engineer interview?

Some of the top questions asked at the Navayuga Engineering Company Tunnel Engineer interview -

  1. What should be the necessary document for Bill?, how do you justify that fiber...read more
  2. How to manage si...read more
  3. What is the regular test on s...read more

Tell us how to improve this page.

Navayuga Engineering Company Tunnel Engineer Interview Process

based on 3 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 415 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
Tractebel Interview Questions
4.1
 • 42 Interviews
View all
Navayuga Engineering Company Tunnel Engineer Salary
based on 10 salaries
₹3.6 L/yr - ₹7.2 L/yr
28% less than the average Tunnel Engineer Salary in India
View more details

Navayuga Engineering Company Tunnel Engineer Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

4.3

Skill development

5.0

Work-life balance

4.6

Salary

4.6

Job security

3.9

Company culture

4.3

Promotions

4.3

Work satisfaction

Explore 2 Reviews and Ratings
Site Engineer
131 salaries
unlock blur

₹2.2 L/yr - ₹7.2 L/yr

Senior Engineer
105 salaries
unlock blur

₹4.2 L/yr - ₹11 L/yr

Civil Site Engineer
95 salaries
unlock blur

₹2.2 L/yr - ₹6.5 L/yr

Assistant Manager
57 salaries
unlock blur

₹4.7 L/yr - ₹12 L/yr

Mechanical Engineer
43 salaries
unlock blur

₹2 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Navayuga Engineering Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview