I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
Communicate openly, provide support, set clear expectations, offer solutions
Communicate openly with designers to understand their challenges and concerns
Provide support and resources to help designers overcome tough times
Set clear expectations and goals to keep designers focused and motivated
Offer solutions and brainstorm ideas together to find the best way forward
Top trending discussions
posted on 13 Jan 2025
I was interviewed in Jul 2022.
HVDC is a technology used to transmit high voltage DC power over long distances. Offshore connections refer to power transmission from offshore wind farms.
HVDC is more efficient than AC transmission over long distances
Offshore connections require specialized equipment and installation techniques
HVDC is used for offshore connections to transmit power from offshore wind farms to the mainland
Examples of HVDC projects incl...
posted on 27 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
System studies involve analyzing and evaluating the performance of electrical systems to ensure efficiency and reliability.
System studies involve analyzing the behavior of electrical systems under different operating conditions.
They help identify potential issues and optimize the performance of the system.
Examples of system studies include load flow analysis, short circuit analysis, and protection coordination studies.
Load flow study is a method used in electrical engineering to analyze and calculate the flow of power in an electrical network.
Load flow study helps in determining the steady-state operating conditions of a power system.
It involves calculating the voltage magnitude and phase angle at each bus in the network.
The study considers factors like power generation, transmission line losses, and load demand.
It helps in identify...
I applied via LinkedIn and was interviewed before Jul 2021. There were 2 interview rounds.
Project flow steps involve planning, design, implementation, testing, and maintenance.
Planning: Define project scope, objectives, and requirements.
Design: Develop a detailed plan and create schematics.
Implementation: Install and integrate components.
Testing: Verify functionality and performance.
Maintenance: Monitor and update system as needed.
Examples: Building a power distribution system, designing a control panel for
posted on 12 Oct 2024
I applied via campus placement at PSG College of Technology, Coimbatore and was interviewed in Sep 2024. There were 3 interview rounds.
General knowlegde, Basic Aptitude, Domain Technical MCQ
Genx vs Genz, Altitude and comparsion
Components of a transformer include core, windings, and insulation.
Core: Provides a path for magnetic flux
Windings: Primary and secondary coils for inducing voltage
Insulation: Prevents short circuits and ensures safety
MCB is a miniature circuit breaker used for low voltage applications, while MCCB is a molded case circuit breaker used for higher currents and voltages.
MCB is designed for low voltage applications, typically up to 1000V, while MCCB is designed for higher currents and voltages, typically up to 2500V.
MCB is usually thermal-magnetic in operation, while MCCB can be thermal-magnetic or electronic trip units.
MCB is compact i...
Different types of breakers include circuit breakers, fuse breakers, and ground fault circuit interrupters.
Circuit breakers: Automatically switch off electrical circuits during abnormal conditions.
Fuse breakers: Use a fuse to interrupt the circuit when overloaded.
Ground fault circuit interrupters (GFCI): Detect imbalances in current flow to prevent electrical shocks.
Miniature circuit breakers (MCB): Provide protection ...
posted on 22 Apr 2024
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
Ohm's law states that the current through a conductor between two points is directly proportional to the voltage across the two points.
Ohm's law is represented by the equation I = V/R, where I is the current, V is the voltage, and R is the resistance.
It is named after Georg Simon Ohm, a German physicist who first formulated this law.
This law is applicable to all types of circuits, including DC and AC circuits.
It is use...
I applied via Walk-in and was interviewed in Mar 2023. There were 4 interview rounds.
The Loto system stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again during maintenance or servicing.
Loto system involves locking the energy-isolating devices with individual lockout devices to prevent the machine from being turned on
Tagout involves placing a tag on the locked device to indicate that it should not be operated
Employees workin...
based on 1 review
Rating in categories
Piping Designer
44
salaries
| ₹5 L/yr - ₹16.5 L/yr |
Process Engineer
32
salaries
| ₹7 L/yr - ₹21.6 L/yr |
Instrument Engineer
31
salaries
| ₹6.8 L/yr - ₹20.2 L/yr |
Process Designer
20
salaries
| ₹7.5 L/yr - ₹16 L/yr |
Quantity Surveyor
16
salaries
| ₹6 L/yr - ₹14.8 L/yr |
Larsen & Toubro Limited
Punj Lloyd
Thermax Limited
BHEL