Upload Button Icon Add office photos

Filter interviews by

Navayuga Engineering Company Bridge Design Engineer Interview Questions and Answers

Updated 6 May 2024

Navayuga Engineering Company Bridge Design Engineer Interview Experiences

1 interview found

Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. 1)software test Staad pro( just creat a two frames and apply loads(point load , udl , concentric moment) , analysis )
  • Q2. 2)written exam -Q)Given pile model diagram , findout the pile reactions with horizontal forces (manual calculations) -Q)Given I-Section(PSC) with UDL load , find out the stresse(manual calculations) -Q)Gi...
  • Q3. 3)Interview -Q)How to design Box culvert and Draw the Barmark shapes (Like Draftman)

Interview Preparation Tips

Topics to prepare for Navayuga Engineering Company Bridge Design Engineer interview:
  • PSC I-Girders , Pile foundation
  • Staad Pro software
  • BMD , SFD of Simply supported
Interview preparation tips for other job seekers - Managers are frome IIT having 15years Exprience They ask High Knwoledge questions.

Interview questions from similar companies

I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Some equation of leveling or survey

Interview Preparation Tips

Interview preparation tips for other job seekers - Make connection with other to grow up. Finally change your company when you have enough experience. .

I applied via Campus Placement and was interviewed before Feb 2020. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cement test ,initially setting time
  • Q2. Cube mould size
  • Ans. 

    Cube mould size is a standard size used for testing the compressive strength of concrete.

    • Cube moulds are typically made of steel or cast iron.

    • The standard size for cube moulds is 150mm x 150mm x 150mm.

    • Other sizes such as 100mm x 100mm x 100mm and 200mm x 200mm x 200mm are also used.

    • The moulds are filled with concrete and left to cure before being tested for compressive strength.

    • Cube moulds are used to ensure that the c...

  • Answered by AI
  • Q3. 1m. 8mm Dia steel rod weight,how to calculate
  • Ans. 

    To calculate the weight of an 8mm diameter steel rod, use the formula: weight = volume x density.

    • Calculate the volume of the rod using the formula: volume = π x (diameter/2)^2 x length

    • Find the density of steel, which is typically around 7850 kg/m^3

    • Multiply the volume by the density to get the weight of the rod

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical strong.This interview was both knowledge and communication between sub contractor and engineer. Most of the questions related to diploma circling.

I was interviewed before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. What is leveling
  • Ans. 

    Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.

    • Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.

    • It involves the use of leveling instruments such as a level, theodolite, or laser level.

    • The process typically includes setting up benchmarks or reference points, taking readings at different...

  • Answered by AI
  • Q2. What is dia of six mm
  • Ans. 

    The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.

    • The diameter is the distance across the center of a circle, passing through the circumference.

    • A six mm diameter can be visualized as a circle with a width of six millimeters.

    • It is a common measurement used in various industries, including engineering and manufacturing.

    • For example, a six mm diameter steel rod w...

  • Answered by AI
  • Q3. What is formula of lep
  • Ans. 

    LEP stands for Load Equivalent Factor for Pavement design.

    • LEP is used in pavement design to determine the load-carrying capacity of the pavement.

    • The formula for LEP depends on the specific design method being used.

    • For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))

    • Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...

  • Answered by AI

I applied via AmbitionBox and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. What are your strengths and weaknesses?
  • Q2. Tell me about yourself.
  • Q3. My name is Roop kishor I am from agra up my qualification three years diploma
Round 2 - HR 

(2 Questions)

  • Q1. Where do you see yourself in 5 years?
  • Q2. Good knowledg and work experience

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Civil Site Engineer interview:
  • Layout work
  • Bbs
  • Structural drawing
  • Architectural drawings
  • Shuttering
  • Technical Skills
Interview preparation tips for other job seekers - I interested civil site Engineer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Aug 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How much outer side plaster in mm ?
  • Ans. 

    The thickness of outer side plaster can vary depending on the specific requirements of the project.

    • The thickness of outer side plaster is typically around 15-20 mm.

    • However, it can be adjusted based on factors such as the type of building, weather conditions, and structural requirements.

    • Consulting with a structural engineer or architect is recommended to determine the appropriate thickness for the outer side plaster.

  • Answered by AI
  • Q2. What is the Grade of concrete for RCC ?
  • Ans. 

    Grade of concrete for RCC is typically M20, M25, M30, etc. which represent the compressive strength of concrete mix.

    • Grade of concrete is denoted by the mix ratio of cement, sand, and aggregates.

    • Common grades include M20, M25, M30, etc. where 'M' stands for mix and the number represents the compressive strength in MPa.

    • Higher grade concrete like M30 is used for structures requiring higher strength like bridges, dams, etc...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Civil engineering students
  • Q2. Building constructions
  • Q3. Civil engineering
Round 3 - Group Discussion 

Civil engineering building construction, metro project surveying

Interview Preparation Tips

Interview preparation tips for other job seekers - I am sayan Choudhury from West Bengal Bolpur santiniketan institute of polytechnic college Civil engineering department students experience metro project J.kumar root project Engineer consultancy private limited

I applied via Recruitment Consultant and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is Pre Cast work
  • Ans. 

    Pre Cast work is the process of manufacturing concrete elements in a factory and transporting them to the construction site for assembly.

    • Pre Cast work involves creating concrete elements such as walls, columns, and beams in a factory setting

    • These elements are then transported to the construction site for assembly

    • Pre Cast work can save time and money on construction projects

    • Examples of Pre Cast elements include precast ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Pre Cast work and VUP work
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Math reasoning english

Round 2 - Technical 

(1 Question)

  • Q1. Transportation engineering
Round 3 - HR 

(1 Question)

  • Q1. Building material construction

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Civil Site Engineer interview:
  • Bmc
  • Bricks

Interview Questionnaire 

2 Questions

  • Q1. What pipe laying and Sewer Networking and Road Restoration
  • Ans. 

    Pipe laying, sewer networking, and road restoration are essential tasks for civil site engineers.

    • Pipe laying involves the installation of pipes for water supply, drainage, and sewage systems.

    • Sewer networking involves connecting pipes to create a network for the transportation of sewage and wastewater.

    • Road restoration involves repairing and maintaining roads and pavements that have been damaged due to construction work.

    • ...

  • Answered by AI
  • Q2. Water & Effluent Treatment IC Chamber
  • Ans. 

    IC chamber is used for the treatment of industrial effluent and wastewater.

    • IC stands for Ion Exchange Chromatography

    • IC chamber is used to remove heavy metals, organic compounds, and other pollutants from wastewater

    • It works by exchanging ions in the wastewater with ions in the resin beads inside the chamber

    • Effluent treated in IC chamber can be reused for industrial purposes or discharged into the environment

    • IC chamber i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview Good Dear all sir good person

Navayuga Engineering Company Interview FAQs

How many rounds are there in Navayuga Engineering Company Bridge Design Engineer interview?
Navayuga Engineering Company interview process usually has 1 rounds. The most common rounds in the Navayuga Engineering Company interview process are Technical.
What are the top questions asked in Navayuga Engineering Company Bridge Design Engineer interview?

Some of the top questions asked at the Navayuga Engineering Company Bridge Design Engineer interview -

  1. 2)written exam -Q)Given pile model diagram , findout the pile reactions with h...read more
  2. 1)software test Staad pro( just creat a two frames and apply loads(point load ,...read more
  3. 3)Interview -Q)How to design Box culvert and Draw the Barmark shapes (Like Draf...read more

Tell us how to improve this page.

Navayuga Engineering Company Bridge Design Engineer Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 424 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
Tractebel Interview Questions
4.1
 • 42 Interviews
View all
Site Engineer
129 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
112 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
95 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
59 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
45 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Navayuga Engineering Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview