Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Larsen & Toubro Limited Team. If you also belong to the team, you can get access from here

Larsen & Toubro Limited Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Larsen & Toubro Limited Team Lead Interview Questions and Answers

Updated 19 Mar 2025

Larsen & Toubro Limited Team Lead Interview Experiences

1 interview found

Team Lead Interview Questions & Answers

user image Anonymous

posted on 19 Mar 2025

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. What are the steps involved in the construction process?
  • Q2. What is the minimum curing time for concrete?
  • Q3. What is the significance of surveying in construction?
  • Q4. What is the concrete mix ratio?

Team Lead Jobs at Larsen & Toubro Limited

View all

Interview questions from similar companies

Engineer Interview Questions & Answers

TCE user image Anonymous

posted on 12 Jun 2021

I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How is lapping of beam done.
  • Ans. 

    Lapping of beam is done by grinding the surface of the beam to achieve a smooth and flat finish.

    • The beam is placed on a lapping machine with an abrasive surface.

    • The machine moves the beam back and forth while the abrasive surface grinds away any imperfections.

    • The process is repeated with finer and finer abrasives until the desired finish is achieved.

    • Lapping can improve the strength and durability of the beam.

    • It is comm...

  • Answered by AI
  • Q2. How much cube samples are taken for 60 cum of concrete.
  • Ans. 

    The number of cube samples taken for 60 cum of concrete depends on the specifications and requirements of the project.

    • The number of cube samples may vary depending on the project specifications and requirements.

    • Typically, 3 to 5 cube samples are taken for every 100 cubic meters of concrete.

    • The cube samples are taken to test the compressive strength of the concrete.

    • The number of cube samples may also depend on the locat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm , listen carefully try your answe to the point and short.. Main a good english communication..

I appeared for an interview before Jul 2016.

Interview Questionnaire 

2 Questions

  • Q1. Non technical as a math Gk and about me
  • Q2. Introduction

Interview Preparation Tips

Round: Test
Experience: My test scores is totall 57 number
Total Questions: 70

Round: HR Interview
Experience: My test scores is totall 57 number
Tips: At this must required your Confident

I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Tower cranes erection,batching plant maintenance and electrical safety
  • Q2. Ok normal

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal not tough

Engineer Interview Questions & Answers

TCE user image Anonymous

posted on 25 Feb 2015

Interview Questionnaire 

1 Question

  • Q1. Questions were from bending moment and shear force diagrams;

Interview Preparation Tips

Round: Test
Experience: Technical (Structural engineering questions only) and aptitude test

Round: Technical Interview
Tips: Questions on Earthquake engineering, structural dynamics,Design of RC and steel structures can also be asked.

Round: HR Interview
Experience: HR interview is trivial if you are selected through technical interview.

General Tips: Technical/aptitude test and technical interview had maximum weightage. If you crack it the best way, you are in!
Skill Tips: CGPA does not help much. Internship, project etc. questions were not asked.
Skills: Aptitude skills, Technical skills, Designing skills
College Name: IIT MADRAS

I applied via Walk-in and was interviewed before Aug 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Tell daily maintenance schedules of machineries
  • Ans. 

    Daily maintenance schedules of machineries

    • Check oil levels and top up if necessary

    • Inspect and clean filters

    • Check for any signs of wear and tear

    • Lubricate moving parts

    • Check for any leaks or unusual noises

    • Perform any necessary repairs or replacements

    • Keep a record of maintenance performed

  • Answered by AI
  • Q2. Tell how many types of oils uses in construction machinery
  • Ans. 

    Construction machinery uses various types of oils depending on their functions.

    • There are different types of oils used in construction machinery such as engine oil, hydraulic oil, gear oil, transmission oil, and brake oil.

    • Engine oil is used to lubricate the engine and prevent wear and tear.

    • Hydraulic oil is used to transfer power in hydraulic systems.

    • Gear oil is used to lubricate gears and bearings in gearboxes.

    • Transmiss...

  • Answered by AI
  • Q3. How to repair hydraulic pump?
  • Ans. 

    To repair a hydraulic pump, first identify the problem and then disassemble the pump to replace or repair the faulty parts.

    • Identify the problem by checking for leaks, unusual noises, or loss of pressure.

    • Disassemble the pump carefully, taking note of the order of parts and any seals or gaskets.

    • Inspect the parts for damage or wear, and replace any faulty components.

    • Reassemble the pump, making sure all parts are properly ...

  • Answered by AI
  • Q4. What is the reason of engine failure ?
  • Ans. 

    Engine failure can be caused by various factors such as overheating, lack of maintenance, wear and tear, and manufacturing defects.

    • Overheating due to lack of coolant or oil

    • Lack of maintenance such as not changing oil or air filters

    • Wear and tear of engine components such as pistons, bearings, and valves

    • Manufacturing defects such as faulty parts or poor assembly

    • Fuel contamination or incorrect fuel usage

    • Improper installat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Tough
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the procedure for pilecap excavation?
  • Ans. 

    The procedure for pilecap excavation involves several steps to ensure proper excavation and preparation for the construction of pilecaps.

    • Clear the site and mark the boundaries of the pilecap area.

    • Excavate the soil within the marked boundaries to the required depth and dimensions.

    • Ensure proper shoring and support systems are in place to prevent collapse.

    • Remove any obstructions or debris from the excavation area.

    • Inspect ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal family background
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions regarding machine maintenance

Engineer Interview Questions & Answers

TCE user image Anonymous

posted on 5 Jan 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

After the shortlisting of CVs, list was sent for those who were eligible for the OT. The online test included aptitude + technical. There were pretty easy to moderate questions but time was less.

Round 2 - One-on-one 

(1 Question)

  • Q1. It was the technical round interview. Ours was online. It went up to 50 mins.
Round 3 - Video Call 

(1 Question)

  • Q1. The portal will be open for 1 hr and within that time some questions are to be answered by making a video and uploading it.
Round 4 - HR 

(1 Question)

  • Q1. Questions related to HR
Round 5 - Medical Test Round 

(1 Question)

  • Q1. Selected candidates would be asked to visit the mentioned hospital for this round.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

1 Hr. - Technical Questions regarding engineering

Round 3 - One-on-one 

(2 Questions)

  • Q1. Fav Sub, Highest Scored Sub, Hobbies,
  • Q2. Life after 5 years, etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Management is mostly good

Larsen & Toubro Limited Interview FAQs

How to prepare for Larsen & Toubro Limited Team Lead interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Larsen & Toubro Limited. The most common topics and skills that interviewers at Larsen & Toubro Limited expect are Embedded, MIS, R&D, Analytics and Auditing.
What are the top questions asked in Larsen & Toubro Limited Team Lead interview?

Some of the top questions asked at the Larsen & Toubro Limited Team Lead interview -

  1. What are the steps involved in the construction proce...read more
  2. What is the significance of surveying in constructi...read more
  3. What is the minimum curing time for concre...read more

Tell us how to improve this page.

Larsen & Toubro Limited Team Lead Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 455 Interviews
Tata Technologies Interview Questions
3.6
 • 266 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
Dilip Buildcon Interview Questions
4.0
 • 149 Interviews
View all
Larsen & Toubro Limited Team Lead Salary
based on 116 salaries
₹7 L/yr - ₹24 L/yr
57% more than the average Team Lead Salary in India
View more details

Larsen & Toubro Limited Team Lead Reviews and Ratings

based on 23 reviews

3.6/5

Rating in categories

3.7

Skill development

3.8

Work-life balance

3.7

Salary

3.9

Job security

3.8

Company culture

3.3

Promotions

4.0

Work satisfaction

Explore 23 Reviews and Ratings
Team Lead - Electrical

Delhi/Ncr

10-17 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
3.9k salaries
unlock blur

₹5.3 L/yr - ₹18.4 L/yr

Senior Engineer
3.5k salaries
unlock blur

₹4.5 L/yr - ₹12.5 L/yr

Engineer
1.2k salaries
unlock blur

₹1.6 L/yr - ₹9.3 L/yr

Manager
1.1k salaries
unlock blur

₹9 L/yr - ₹29 L/yr

Assistant Construction Manager
1k salaries
unlock blur

₹6 L/yr - ₹21.5 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview