I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
The weight of steel bars can be calculated by multiplying the volume of the steel bar by its density.
Calculate the volume of the steel bar by using the formula: Volume = (π * (Diameter)^2 * Length) / 4
Determine the density of the specific type of steel being used
Multiply the volume by the density to get the weight of the steel bar
Workability refers to the ease and ability of a material to be worked with and manipulated during construction.
Workability is important in construction as it affects the ease of placing, compacting, and finishing concrete or other materials.
Factors affecting workability include water content, aggregate size and shape, temperature, and admixtures.
For example, a concrete mix with high workability will flow easily into fo...
Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.
It is prepared by civil engineers to ensure proper placement and bending of reinforcement bars in concrete structures.
Includes details such as bar mark, diameter, number of bars, length, shape codes, and bending dimensions.
Helps in estimating the quantity of steel required for construction...
The density of steel bars is approximately 7850 kg/m^3.
The density of steel bars is typically around 7850 kg/m^3.
Density can vary slightly depending on the specific type of steel used.
Density is a measure of mass per unit volume.
The mix ratio of grade M20 concrete is 1:1.5:3 (cement:sand:aggregate).
Grade M20 concrete has a mix ratio of 1:1.5:3 (cement:sand:aggregate).
This means for every 1 part of cement, 1.5 parts of sand and 3 parts of aggregate are used.
For example, for a 1 cubic meter of M20 concrete, 0.5 cubic meters of sand and 1.5 cubic meters of aggregate are used.
posted on 20 Dec 2020
I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.
The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.
DBM stands for Dense Bituminous Macadam, which is a type of road construction material.
The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.
The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.
Higher percentages of bitumen a...
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 23 Oct 2020
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.
I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.
Seeking new challenges and opportunities for skill development
Leaving for career growth and advancement
Experience and expertise in the field
Ability to contribute effectively to the team and projects
based on 2 interviews
Interview experience
based on 5 reviews
Rating in categories
Assistant Manager
3.9k
salaries
| ₹5.3 L/yr - ₹18.5 L/yr |
Senior Engineer
3.5k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9.3 L/yr |
Manager
1.1k
salaries
| ₹9 L/yr - ₹29 L/yr |
Assistant Construction Manager
1k
salaries
| ₹6 L/yr - ₹21.5 L/yr |
Tata Projects
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International