The Safety Officer/Safety Engineer interview questions include construction site experience, difference between MCB & RCCB, and safety measures for electric shock.
Yes, I have seen construction sites and have experience in ensuring safety protocols.
MCB (Miniature Circuit Breaker) and RCCB (Residual Current Circuit Breaker) are both electrical protection devices, but with different functions.
MCB is designed to protect ag...
Hazard is a potential source of harm, while risk is the likelihood and severity of harm. Risk can be calculated using the formula: Risk = Hazard x Exposure x Vulnerability.
Hazard refers to anything that has the potential to cause harm, such as chemicals, fire, or machinery.
Risk is the combination of the likelihood and severity of harm that may result from exposure to a hazard.
To calculate risk, one must consider the ha...
Frequency, severity, and incident rate are important safety metrics used to measure the effectiveness of safety programs.
Frequency refers to the number of times an incident occurs within a given time period.
Severity refers to the level of harm or damage caused by an incident.
Incident rate is the number of incidents that occur per unit of exposure, usually measured in terms of hours worked or number of employees.
These m...
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 2 interview rounds.
Precautions for working at height include proper training, use of fall protection equipment, regular inspection of equipment, and securing tools and materials.
Ensure workers are properly trained on working at height procedures
Use appropriate fall protection equipment such as harnesses, lanyards, and guardrails
Regularly inspect all equipment used for working at height to ensure it is in good condition
Secure tools and ma...
A lifting plan is a detailed document outlining the procedures and precautions to be taken when lifting heavy objects.
A lifting plan should include the weight of the object being lifted
It should specify the equipment to be used for lifting
The plan should outline the steps to be taken to ensure the safety of workers involved
It should also consider factors such as the location of the lift and any potential hazards
Regular...
Risk assessment is the process of identifying, analyzing, and evaluating potential risks in order to determine the likelihood and impact of harmful events.
Identifying potential hazards and risks in the workplace or environment
Analyzing the likelihood of these risks occurring
Evaluating the potential impact of these risks on people, property, and the environment
Developing strategies to mitigate or eliminate these risks
Re...
Capacity of wire rope sling can be calculated by considering factors like diameter, material, and configuration.
Capacity is determined by the breaking strength of the wire rope and the design factor used.
Calculate the breaking strength of the wire rope by multiplying the area of the rope cross-section by the tensile strength of the material.
Consider the configuration of the sling (single leg, double leg, etc.) and appl...
posted on 15 Sep 2024
Work permits are documents that authorize specific work to be done in a controlled manner to ensure safety.
Work permits are used to control hazardous work activities.
They outline the precautions to be taken before, during, and after the work.
Examples include hot work permits, confined space entry permits, and electrical work permits.
I applied via LinkedIn and was interviewed in May 2023. There were 5 interview rounds.
Technology development based on question
posted on 3 Dec 2024
I applied via Walk-in and was interviewed before Dec 2023. There were 2 interview rounds.
Objective types questions
posted on 6 Mar 2023
I applied via Company Website and was interviewed before Mar 2022. There were 4 interview rounds.
Preventing accidents requires a combination of training, safety protocols, and hazard identification.
Develop and implement safety protocols and procedures
Provide regular safety training to employees
Conduct regular hazard assessments and implement controls
Encourage reporting of near-misses and incidents for continuous improvement
Ensure equipment and machinery is properly maintained
Promote a culture of safety and account...
Tunnels pose various hazards such as poor air quality, fire, flooding, and collapse.
Poor air quality due to exhaust fumes, dust, and lack of ventilation
Fire hazards due to electrical equipment, flammable materials, and smoking
Flooding due to water leaks or natural disasters
Collapse due to unstable ground or structural issues
Other hazards include noise, vibration, and limited visibility
A group means many people are working together to achieve some targets. The performance of a group depends on the collaborative work of the individuals. The team of three or more than three people is considered as a group.
Crane loading unloading welding fire extinguisher cut injury welding
The question is unclear and requires further clarification.
Can you please provide more context or details about the incident?
What was the cause of the near miss?
What safety measures were in place to prevent such incidents?
Were there any injuries or damages as a result of the near miss?
How can we improve safety procedures to prevent similar incidents in the future?
Be positive and joyous while answering to show that a happy attitude. Don't be shy or embarrassed of any factual information related to your family. Be confident and proud of what your parents' do to give you a comfortable living. Try to show good values that your parents have inculcated in you.
Assistant Manager
4.2k
salaries
| ₹5 L/yr - ₹18 L/yr |
Senior Engineer
3.5k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9.3 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹6 L/yr - ₹21 L/yr |
Manager
1.1k
salaries
| ₹9.3 L/yr - ₹30 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra